STR’s April 2016 Pipeline Report shows 506,000 rooms in 4,125 projects under contract in the U.S. The total represents a 14.6% increase in the number of rooms under contract compared with April 2015.
Under contract data includes projects in the construction, final planning, and planning stages, but does not include projects in the unconfirmed stage.
In the construction stage, the U.S. reported 161,014 rooms in 1,241 projects, a 28.3% increase in year-over-year comparisons.
Among the Chain Scale segments, Upscale (55,994 rooms in 407 hotels) accounted for the most rooms in construction, followed by Upper Midscale (52,934 rooms in 523 hotels).
“The Upscale and Upper Midscale segments combine to represent more than 67% of total construction activity in the U.S., with almost 109,000 rooms between the two,” said Bobby Bowers, STR’s Senior VP for Operations. “Looking further down the road, these two segments combine for almost 207,000 rooms in the two planning phases. That means these segments will likely continue to experience significant supply increases over the next few years. It will be very interesting to monitor the effect on select-service occupancy.”
The Economy segment reported the least contract and construction activity but the largest year-over-year increases in rooms under contract (+41.2% to 4,731 rooms) and in construction (+94.8% to 1,276 rooms).
“The increase in activity is coming across the board,” Bowers said.
Every segment with the exception of Luxury (+7.9%) reported a double-digit increase in construction activity when compared with last April. Every segment outside of Unaffiliated (+2.4%) reported a double-digit lift in under contract.
Related Stories
| May 29, 2012
Reconstruction Awards Entry Information
Download a PDF of the Entry Information at the bottom of this page.
| May 24, 2012
2012 Reconstruction Awards Entry Form
Download a PDF of the Entry Form at the bottom of this page.
| May 23, 2012
Summit Design+Build selected as GC for Chicago restaurant
Little Goat will truly be a multifunctional space. Construction plans include stripping the 10,000 sq. ft. building down to the bare structure everywhere, the installation of a new custom elevator and adding square footage at the second floor with an addition.
| May 22, 2012
Batson-Cook names Partin VP of Business Development
Partin joins general contractor from Georgia Hospital Association.
| May 16, 2012
AEG releases 3D video of L.A.'s Farmers Field
The Los Angeles Convention Center footage depicts the new convention center hall spaces, including a new lobby above Pico Boulevard, pre-function space, and what will be the largest multi-purpose ballroom in Los Angeles.
| Apr 30, 2012
HSA Commercial selected as consultant for Orland Park’s Main Street Triangle project
HSA will be responsible for designing an overall mixed-use merchandise plan, attracting a unique retail tenant mix and completing leases with prospective tenants.
| Apr 20, 2012
McCarthy completes Santa Barbara Cottage Hospital Replacement Facility
The new hospital’s architectural design combines traditional Santa Barbara Spanish colonial architecture with 21st century medical conveniences highlighted by a therapeutic and sustainable atmosphere.
| Apr 20, 2012
Shawmut completes Yard House Restaurant in Boston
12,000-sf restaurant marks new addition to Boston’s Fenway neighborhood.
| Apr 6, 2012
Batson-Cook breaks ground on hotel adjacent to Infantry Museum & Fort Benning
The four-story, 65,000-ft property will feature 102 hotel rooms, including 14 studio suites.
| Apr 4, 2012
JCJ Architecture designs New York City's first casino
Aqueduct Racetrack complex transformed into modern entertainment destination.