flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

U.S. hotel construction pipeline remains steady with 5,572 projects in the works

Hotel Facilities

U.S. hotel construction pipeline remains steady with 5,572 projects in the works

The hotel construction pipeline grew incrementally in Q2 2023 as developers and franchise companies push through short-term challenges while envisioning long-term prospects, according to Lodging Econometrics.


By Lodging Econometrics | July 27, 2023
U.S. hotel construction pipeline remains steady with 5,572 projects in the works
Photo by Pixabay

According to the Q2 2023 United States Construction Pipeline Trend Report by Lodging Econometrics (LE), at the close of the second quarter, the hotel construction pipeline stands at 5,572 projects/660,061 rooms, with projects up 7% year-over-year (YOY) and rooms up 6% YOY.

The hotel construction pipeline grew incrementally quarter-over-quarter (QOQ), as developers and franchise companies push through short-term challenges while envisioning long-term prospects. Inflation, higher interest, rates and the general “wait and see” attitude of developers have prevailed in the economy in recent months; however, developers continue to believe in the strength of the economy long-term as witnessed by the continued growth in the pipeline. 

At the end of Q2, the total pipeline is only 5% from its all-time peak in terms of projects. Certainly, some head winds remain, but hotel developers are locking down prime locations for development now and in the coming months.

A bright spot for the economy and the hotel industry is the increased consumer confidence and sentiment which among other things has led to strong demand for guest rooms. This strong demand is expected to continue through the rest of the summer and into the fall with heavy tourist demand through August and the kick-off of the fall conference season after Labor Day.

Projects under construction have experienced modest QOQ growth over the past year and currently stand at 1,062 projects/141,681 rooms, up 10% and 8% YOY, respectively. Projects scheduled to start construction in the next 12 months saw an 11% increase in projects and 12% increase in rooms YOY, to stand at 2,232 projects/260,595 rooms at the close of the second quarter.

This increase highlights the fact that projects are progressing through the planning process and developers are sourcing funding to get “into the ground”. Year-over-year project counts in the early planning stage changed minimally and ended Q2 ’23 with 2,278 projects/257,785 rooms. The second quarter, however, marks the tenth consecutive quarter that the number of rooms in early planning has been over 200,000.

Upscale, upper-midscale hotel construction projects dominate

Upscale and upper midscale new construction projects dominate the pipeline at Q2, accounting for 62% of the projects and 57% of the rooms in the total U.S. construction pipeline. These two chain scales also represent 63% of the projects and 57% of the rooms anticipated to open through year-end 2023 and are expected to have the highest guest room growth rates through 2025.

Announced renovations and brand conversions, combined, reached record high project counts over the last four quarters, accounting for 1,939 projects/253,473 rooms, with upscale, upper midscale, and economy brands accounting for the majority of these projects at the end of 2023’s second quarter.

Extended-stay hotel projects have also been on the rise in the U.S., increasing consecutively over the last eight quarters. At the Q2 close, there were 2,083 extended-stay projects, with 214,557 rooms in the U.S. hotel construction pipeline. Extended-stay projects account for 32% of projects under construction in the total pipeline, 42% of projects scheduled to start construction in the next 12 months, and 36% of the projects in early planning across the U.S. 

In 2022, 130 extended-stay hotels opened, adding 13,647 rooms to the U.S. supply. For 2023, 180 extended-stay projects/18,713 rooms are expected to open. In 2024, 236 projects/24,281 rooms, and in 2025, 319 projects/32,798 rooms are forecast to open in the extended-stay segment. The extended stay segment is growing at 2.5 to 3.5 times the actual and forecasted industry growth rates from 2022-2025.

For the entire U.S., during the first and second quarters, 224 new hotels with 27,194 rooms opened. LE is forecasting another 384 projects/48,607 rooms to open in 2023 for a total of 608 new hotels/75,801 rooms by year-end. This represents a 1.4% increase in new supply for 2023. The total year-end forecast for 2023 represents a 22% YOY increase over the number of new hotels that opened in 2022, which stood at 475 hotels/56,157 rooms. 

In 2024, 700 new hotel projects with 79,422 rooms are expected to open, for another 1.4% increase in new supply growth. And announcing for the first time, LE analysts expect 808 projects/87,462 rooms to open in 2025 for a 1.5% increase in new supply.

Related Stories

Modular Building | Jan 12, 2017

The largest modular construction hotel project in New York City is starting to get pieced together

The hotel’s 300 rooms are made from 210 prefabricated pods from Polcom Modular.

Hotel Facilities | Nov 15, 2016

Mountain Forest Hotel looks to restore the natural landscape while offering visitors 250 luxury rooms

The hotel looks to create a symbiosis between man, nature, and architecture.

Industry Research | Sep 28, 2016

Worldwide hotel construction shows modest year-over-year growth

Overall construction for hotel projects is up, but the current number of hotels currently being built has dipped slightly from one year ago.

Hotel Facilities | Sep 26, 2016

$75 million commercial tower and hotel proposed in downtown Atlanta

The tower would be built on a site currently occupied by a Hertz Car Rental and parking lot.

Sponsored | Coatings | Sep 22, 2016

Valspar helps diversify new project amongst iconic downtown Chicago buildings

The 26-story hotel spanning 96,000 square-feet needed a way to not only differentiate itself among the sea of other hotels and buildings lining the riverfront and downtown area, but also fit into the mix aesthetically.

Hotel Facilities | Sep 19, 2016

The Hotel at Oberlin becomes one of only five hotels to achieve LEED Platinum

The Hotel at Oberlin anchors the Peter B. Lewis Gateway Center, the cornerstone of Oberlin’s Green Arts District.

Hotel Facilities | Sep 15, 2016

Developer reveals plans for 175-room hotel across from Wrigley Field

The hotel will provide a four-star experience to guests during baseball season and, just as importantly, during the offseason.

Hotel Facilities | Sep 7, 2016

Fish out of water: The site of a Birdseye frozen-food factory in Gloucester, Mass., transforms into a seaside hotel

The construction of this 94-room hotel and conference center pitted tourism proponents against locals who want to preserve this historic city’s fishing heritage. 

| Sep 1, 2016

HOTEL SECTOR GIANTS: A ranking of the nation's top hotel sector design and construction firms

Gensler, HKS, Turner Construction Co., The Whiting-Turner Contracting Co., Jacobs, and JBA Consulting Engineers top Building Design+Construction’s annual ranking of the nation’s largest hotel sector AEC firms, as reported in the 2016 Giants 300 Report.

Hotel Facilities | Aug 29, 2016

Artificial rainforest coming to Dubai hotel courtesy of ZAS Architects

 The faux-rainforest will be located at The Rosemont Hotel & Residences Dubai.

boombox1
boombox2
native1

More In Category



3D Printing

3D-printed construction milestones take shape in Tennessee and Texas

Two notable 3D-printed projects mark milestones in the new construction technique of “printing” structures with specialized concrete. In Athens, Tennessee, Walmart hired Alquist 3D to build a 20-foot-high store expansion, one of the largest freestanding 3D-printed commercial concrete structures in the U.S. In Marfa, Texas, the world’s first 3D-printed hotel is under construction at an existing hotel and campground site.


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021