According to the Q2 2023 United States Construction Pipeline Trend Report by Lodging Econometrics (LE), at the close of the second quarter, the hotel construction pipeline stands at 5,572 projects/660,061 rooms, with projects up 7% year-over-year (YOY) and rooms up 6% YOY.
The hotel construction pipeline grew incrementally quarter-over-quarter (QOQ), as developers and franchise companies push through short-term challenges while envisioning long-term prospects. Inflation, higher interest, rates and the general “wait and see” attitude of developers have prevailed in the economy in recent months; however, developers continue to believe in the strength of the economy long-term as witnessed by the continued growth in the pipeline.
At the end of Q2, the total pipeline is only 5% from its all-time peak in terms of projects. Certainly, some head winds remain, but hotel developers are locking down prime locations for development now and in the coming months.
A bright spot for the economy and the hotel industry is the increased consumer confidence and sentiment which among other things has led to strong demand for guest rooms. This strong demand is expected to continue through the rest of the summer and into the fall with heavy tourist demand through August and the kick-off of the fall conference season after Labor Day.
Projects under construction have experienced modest QOQ growth over the past year and currently stand at 1,062 projects/141,681 rooms, up 10% and 8% YOY, respectively. Projects scheduled to start construction in the next 12 months saw an 11% increase in projects and 12% increase in rooms YOY, to stand at 2,232 projects/260,595 rooms at the close of the second quarter.
This increase highlights the fact that projects are progressing through the planning process and developers are sourcing funding to get “into the ground”. Year-over-year project counts in the early planning stage changed minimally and ended Q2 ’23 with 2,278 projects/257,785 rooms. The second quarter, however, marks the tenth consecutive quarter that the number of rooms in early planning has been over 200,000.
Upscale, upper-midscale hotel construction projects dominate
Upscale and upper midscale new construction projects dominate the pipeline at Q2, accounting for 62% of the projects and 57% of the rooms in the total U.S. construction pipeline. These two chain scales also represent 63% of the projects and 57% of the rooms anticipated to open through year-end 2023 and are expected to have the highest guest room growth rates through 2025.
Announced renovations and brand conversions, combined, reached record high project counts over the last four quarters, accounting for 1,939 projects/253,473 rooms, with upscale, upper midscale, and economy brands accounting for the majority of these projects at the end of 2023’s second quarter.
Extended-stay hotel projects have also been on the rise in the U.S., increasing consecutively over the last eight quarters. At the Q2 close, there were 2,083 extended-stay projects, with 214,557 rooms in the U.S. hotel construction pipeline. Extended-stay projects account for 32% of projects under construction in the total pipeline, 42% of projects scheduled to start construction in the next 12 months, and 36% of the projects in early planning across the U.S.
In 2022, 130 extended-stay hotels opened, adding 13,647 rooms to the U.S. supply. For 2023, 180 extended-stay projects/18,713 rooms are expected to open. In 2024, 236 projects/24,281 rooms, and in 2025, 319 projects/32,798 rooms are forecast to open in the extended-stay segment. The extended stay segment is growing at 2.5 to 3.5 times the actual and forecasted industry growth rates from 2022-2025.
For the entire U.S., during the first and second quarters, 224 new hotels with 27,194 rooms opened. LE is forecasting another 384 projects/48,607 rooms to open in 2023 for a total of 608 new hotels/75,801 rooms by year-end. This represents a 1.4% increase in new supply for 2023. The total year-end forecast for 2023 represents a 22% YOY increase over the number of new hotels that opened in 2022, which stood at 475 hotels/56,157 rooms.
In 2024, 700 new hotel projects with 79,422 rooms are expected to open, for another 1.4% increase in new supply growth. And announcing for the first time, LE analysts expect 808 projects/87,462 rooms to open in 2025 for a 1.5% increase in new supply.
Related Stories
| Apr 9, 2014
5 important trends shaping today’s hotel construction market
AEC firms, developers, and investors worldwide are bullish on hotels. Our hospitality Giants share what’s new in this fast-morphing sector.
| Apr 9, 2014
Steel decks: 11 tips for their proper use | BD+C
Building Teams have been using steel decks with proven success for 75 years. Building Design+Construction consulted with technical experts from the Steel Deck Institute and the deck manufacturing industry for their advice on how best to use steel decking.
| Apr 2, 2014
8 tips for avoiding thermal bridges in window applications
Aligning thermal breaks and applying air barriers are among the top design and installation tricks recommended by building enclosure experts.
| Mar 26, 2014
Callison launches sustainable design tool with 84 proven strategies
Hybrid ventilation, nighttime cooling, and fuel cell technology are among the dozens of sustainable design techniques profiled by Callison on its new website, Matrix.Callison.com.
| Mar 24, 2014
Snøhetta unveils plans for serpentine mountain hotel
The winding hotel and apartment building will be built between the mountains and the sea in remote Glåpen, Norway.
| Mar 20, 2014
Common EIFS failures, and how to prevent them
Poor workmanship, impact damage, building movement, and incompatible or unsound substrate are among the major culprits of EIFS problems.
| Mar 20, 2014
D.C. breaks ground on $2B mega waterfront development [slideshow]
When complete, the Wharf will feature approximately 3 million sf of new residential, office, hotel, retail, cultural, and public uses, including waterfront parks, promenades, piers, and docks.
| Mar 13, 2014
Austria's tallest tower shimmers with striking 'folded façade' [slideshow]
The 58-story DC Tower 1 is the first of two high-rises designed by Dominique Perrault Architecture for Vienna's skyline.
| Mar 12, 2014
14 new ideas for doors and door hardware
From a high-tech classroom lockdown system to an impact-resistant wide-stile door line, BD+C editors present a collection of door and door hardware innovations.
| Mar 5, 2014
5 tile design trends for 2014
Beveled, geometric, and high-tech patterns are among the hot ceramic tile trends, say tile design experts.