flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

The U.S. hotel construction pipeline shows positive growth year-over-year at Q3 2022 close

Building Team

The U.S. hotel construction pipeline shows positive growth year-over-year at Q3 2022 close

According to the third quarter Construction Pipeline Trend Report for the United States from Lodging Econometrics (LE), the U.S. construction pipeline stands at 5,317 projects/629,489 rooms, up 10% by projects and 6% rooms Year-Over-Year (YOY).


By Lodging Econometrics | October 26, 2022
Hotel Construction Pipeline
Courtesy Pexels.

According to the third quarter Construction Pipeline Trend Report for the United States from Lodging Econometrics (LE), the U.S. construction pipeline stands at 5,317 projects/629,489 rooms, up 10% by projects and 6% rooms Year-Over-Year (YOY).

At the close of Q3, there are 987 projects/135,050 rooms under construction in the U.S. Projects scheduled to start construction in the next 12 months, stand at 2,074 projects/236,894 rooms, up 14% by projects and 13% by rooms YOY, respectively. Project counts in the early planning stage reached record highs, in Q3, standing at 2,256 projects/257,545 rooms, a 14% increase by projects and 7% increase in rooms YOY.

The lodging industry is healthy, and many hotel owners are expected to experience record high revenues in 2022. As lending rates have changed significantly in 2022 due to the Federal Reserve’s rate increases, ownership and management groups are finding that reinvesting in their current portfolios, whether that be renovating or repositioning to another brand, is a better return on investment right now. At the end of Q3 2022, brand conversion room counts reached record highs of 988 projects/99,474 rooms. The renovation pipeline remained strong as well, with 893 projects/140,440 rooms; some of the highest counts dating back to Q3 2018. Combined, renovation and conversion activity accounts for 1,881 projects/239,914 rooms, up 36% YOY by projects and 50% by rooms YOY.

Travel throughout the U.S., in all segments, saw steady recovery over the summer months and is expected to continue into the fall and winter months. New project announcements and construction starts continue to recover from the lows experienced during the COIVD pandemic. The new construction pipeline in the U.S. continues to grow, albeit, at a moderate, modest pace, with projects in the early planning stage establishing a new peak for this cycle. This peak signals a favorable outlook by developers for development conditions to improve in the near future.

The upper midscale chain scale continues to have the largest project count of all chain scales in the total U.S. construction pipeline at Q3, standing at 2,127 projects/214,473 rooms. Following upper midscale, is upscale which stands at 1,528 projects/202,907 rooms at the close of the quarter. Together, upper midscale and upscale project counts in the pipeline account for 69% of all projects.

The brands with the largest number of projects in the upper midscale chain scale are Home2 Suites by Hilton with 494 projects/50,809 rooms; InterContinental Hotels Group’s (IHG) Holiday Inn Express 297 projects/28,323 rooms; and Marriott’s TownePlace Suites with 291 projects/27,329 rooms. In the upscale chain scale, the top brands are Marriott’s Residence Inn with 234 projects/28,659 rooms, and its SpringHill Suites brand with 148 projects/16,350 rooms, followed by IHG’s Staybridge Suites with 125 projects/12,962 rooms.

At the end of Q3 ’22, 1,846 projects/189,289 rooms in the U.S. Construction Pipeline are extended stay projects; accounting for 35% of projects in the total U.S. pipeline. Home2 Suites by Hilton currently has the largest extended stay pipeline with 494 projects/50,809 rooms. The brand with the second largest number of projects in the extended stay pipeline at Q3 2022, is Marriott’s TownePlace Suites with 291 projects/27,329 rooms, followed by its Residence Inn brand with 234 Projects/28,659 Rooms.

Thus far, throughout 2022, the U.S. opened 343 new hotels, accounting for 39,772 rooms, with another 182 projects/22,261 rooms anticipated to open by the end of the year. This represents a 1.1% increase in new hotel supply for 2022. LE analysts expect new hotel openings to increase in 2023 and 2024, representing a 1.3% supply increase for 2023 and a 1.4% supply increase for 2024.

Related Stories

| Aug 11, 2010

ASHRAE releases free BIM introductory guide

A newly released guide from ASHRAE on building information models and building information modeling (BIM) serves as a resource for professionals considering BIM tools and applications for their businesses. According to "An Introduction to Building Information Modeling," BIM is “a digital representation of the physical and the functional characteristics of a facility.” Unlike 2D or 3D CAD, BIM software utilizes intelligent objects to create models.

| Aug 11, 2010

USGBC honors Brad Pitt's Make It Right New Orleans as the ‘largest and greenest single-family community in the world’

U.S. Green Building Council President, CEO and Founding Chair Rick Fedrizzi today declared that the neighborhood being built by Make It Right New Orleans, the post-Katrina housing initiative launched by actor Brad Pitt, is the “largest and greenest community of single-family homes in the world” at the annual Clinton Global Initiative meeting in New York.

| Aug 11, 2010

AIA report estimates up to 270,000 construction industry jobs could be created if the American Clean Energy Security Act is passed

With the encouragement of Senate majority leader Harry Reid (D-NV), the American Institute of Architects (AIA) conducted a study to determine how many jobs in the design and construction industry could be created if the American Clean Energy Security Act (H.R. 2454; also known as the Waxman-Markey Bill) is enacted.

| Aug 11, 2010

IFMA announces 2009-2010 executive committee and board of directors

The International Facility Management Association is pleased to announce its 2009-2010 executive committee and board of directors, which begin their terms July 1. Thomas L. Mitchell Jr., CFM, CFMJ, will serve as the new chair of the association’s board of directors, succeeding John McGee, MBA.

| Aug 11, 2010

Recreation facility scores with sustainable features

A new $79.1 million health and learning center is under construction on the Northern Arizona University campus in Flagstaff. The 270,000-sf facility will house recreation space, classrooms, health and counseling services, and the Lumberjack Stadium for track and soccer teams. Designed by the Phoenix office of OWP/P Cannon Design with Mortenson Construction as CM, the project is aiming for LEED ...

| Aug 11, 2010

Old factory converted from hearth to home

A former briquette factory in Cologne-Frechen, Germany, was converted into a mixed-use building by Astoc Architects & Planners, Cologne, in association with Rheinischen Amt für Denkmalpflege—the Rhenish agency for historic preservation. The roughly 172,200-sf building includes a mix of residential condominiums, lofts, and leased commercial space.

| Aug 11, 2010

Earthquake engineering keeps airport grounded

Istanbul, Turkey's new 2.15 million-sf Sabiha Gökçen International Airport opened on October 31, 2009, becoming the world's largest seismically isolated building. Arup's global airport planning and engineering team, in collaboration with architects Dogan Tekeli Sami Sisa Mimarlik Ofisi and contractor LIMAK-GMR JV, working within an 18-month timeline, designed and built the facility wi...

| Aug 11, 2010

Wood chips to heat school district buildings

An alternative energy plant for the Hartford Central School District in Hartford, N.Y., will be a first for the state's public school systems. Designed by Albany, N.Y.-based CSArch Architecture/Construction Management, the $1.9 million plant will provide heat and hot water to the district's elementary and high school complex, as well as to an adjacent technical school.

| Aug 11, 2010

University building gets revamped, reused

KSS Architects of Philadelphia is designing the addition and renovation to SUNY Cortland's Studio West, a 43,000-sf metal panel and brick building dating to 1948. The 20,000-sf, two-story addition will become the Professional Studies Building, housing the consolidated departments of Recreation, Parks, and Leisure Studies; Communications Disorders and Sciences; and Kinesiology and Sports Managem...

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021