The Los Angeles Memorial Coliseum, located in Exposition Park adjacent to the University of Southern California campus, is currently undergoing renovations meant to protect its landmark status and greatly improve the fan experience.
A joint venture of Hathaway Dinwiddie and AECOM will manage the project. Renovations on the 93,607-seat Coliseum will include the restoration of the Coliseum peristyle; all new seats with increased legroom; new box suites and lounges; a new press box; upgraded concourses; new concession stands, state-of-the-art audio, video, and WiFi technology; and the replacement of mechanical, electrical, and plumbing systems to meet current standards.
In addition to the renovations and beginning in August 2019, the Coliseum will be officially renamed the United Airlines Memorial Coliseum. The partnership with the airline was critical to funding the $270 million renovation project.
Originally opening in 1923, the stadium’s tenants have included the UCLA Bruins, the Los Angeles Dodgers, and the Summer Olympics, which it has hosted twice in 1932 and 1984.
The renovations, which are being designed by DLR Group, are scheduled for completion in time for the 2019 USC Trojans football season.
To follow along with the Coliseum’s renovations via live images and updated time-lapse videos, click here.
Related Stories
| Jun 11, 2014
Bill signing signals approval to revitalize New Orleans’ convention center corridor
A plan to revitalize New Orleans' Convention Center moves forward after Louisiana governor signs bill.
| May 30, 2014
Developer will convert Dallas' storied LTV Building into mixed-use residential tower
New Orleans-based HRI Properties recently completed the purchase of one of the most storied buildings in downtown Dallas. The developer will convert the LTV Building into a mixed-use complex, with 171 hotel rooms and 186 luxury apartments.
| May 21, 2014
Gehry unveils plan for renovation, expansion of Philadelphia Museum of Art [slideshow]
Gehry's final design reorganizes and expands the building, adding more than 169,000 sf of space, much of it below the iconic structure.
| May 6, 2014
'Ugliest building in New Jersey' finally getting facelift
After a decade of false starts and mishaps, the American Dream mall in the Meadowlands may finally get built.
| Apr 16, 2014
Upgrading windows: repair, refurbish, or retrofit [AIA course]
Building Teams must focus on a number of key decisions in order to arrive at the optimal solution: repair the windows in place, remove and refurbish them, or opt for full replacement.
| Apr 11, 2014
ULI report documents business case for building healthy projects
Sustainable and wellness-related design strategies embody a strong return on investment, according to a report by the Urban Land Institute.
| Mar 25, 2014
Sydney breaks ground on its version of the High Line elevated park [slideshow]
The 500-meter-long park will feature bike paths, study pods, and outdoor workspaces.
| Mar 24, 2014
Frank Lloyd Wright's S.C. Johnson Research Tower to open to the public—32 years after closing
The 14-story tower, one of only two Wright-designed high-rises to be built, has been off limits to the public since its construction in 1950.
| Feb 26, 2014
Adaptive reuse project brings school into historic paper mill
The project features nontraditional classrooms for collaborative learning, an arts and music wing, and a technologically sophisticated global resource center.
Sponsored | | Feb 20, 2014
Chicago’s historic Wrigley Building renovated to attract tech companies
Purchased in 2011 by a consortium of investors led by BDT Capital Partners, the building’s new owners have recently renovated and reimagined the next life for this architectural landmark—as a hub for tech firms.