flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

USC selects Hathaway Dinwiddie and AECOM to mange L.A. Memorial Coliseum renovations

Reconstruction & Renovation

USC selects Hathaway Dinwiddie and AECOM to mange L.A. Memorial Coliseum renovations

The iconic stadium opened in 1923.


By David Malone, Associate Editor | February 1, 2018
The Memorial Coliseum's Peristyle

Photo: Wikimedia Commons

The Los Angeles Memorial Coliseum, located in Exposition Park adjacent to the University of Southern California campus, is currently undergoing renovations meant to protect its landmark status and greatly improve the fan experience.

A joint venture of Hathaway Dinwiddie and AECOM will manage the project. Renovations on the 93,607-seat Coliseum will include the restoration of the Coliseum peristyle; all new seats with increased legroom; new box suites and lounges; a new press box; upgraded concourses; new concession stands, state-of-the-art audio, video, and WiFi technology; and the replacement of mechanical, electrical, and plumbing systems to meet current standards.

In addition to the renovations and beginning in August 2019, the Coliseum will be officially renamed the United Airlines Memorial Coliseum. The partnership with the airline was critical to funding the $270 million renovation project.

Originally opening in 1923, the stadium’s tenants have included the UCLA Bruins, the Los Angeles Dodgers, and the Summer Olympics, which it has hosted twice in 1932 and 1984.

The renovations, which are being designed by DLR Group, are scheduled for completion in time for the 2019 USC Trojans football season.

To follow along with the Coliseum’s renovations via live images and updated time-lapse videos, click here.

Related Stories

| Dec 27, 2011

Ground broken for adaptive reuse project

Located on the Garden State Parkway, the master-planned project initially includes the conversion of a 114-year-old, 365,000-square-foot, six-story warehouse building into 361 loft-style apartments, and the creation of a three-level parking facility.

| Dec 27, 2011

Suffolk Construction celebrates raising of Boston Tea Party Ships & Museum cupola

Topping off ceremony held on 238th Anniversary of Boston Tea Party.

| Dec 21, 2011

Hoboken Terminal restoration complete

Restoration of ferry slips, expanded service to benefit commuters.

| Dec 20, 2011

Aragon Construction leading build-out of foursquare office

The modern, minimalist build-out will have elements of the foursquare “badges” in different aspects of the space, using glass, steel, and vibrantly painted gypsum board.

| Dec 19, 2011

HGA renovates Rowing Center at Cornell University

Renovation provides state-of-the-art waterfront facility.

| Dec 19, 2011

Summit Design+Build selected as GC for Chicago recon project

The 130,000 square foot building is being completely renovated.

| Dec 12, 2011

Skanska to expand and renovate hospital in Georgia for $103 Million

The expansion includes a four-story, 17,500 square meters clinical services building and a five-story, 15,700 square meters, medical office building. Skanska will also renovate the main hospital.

boombox1
boombox2
native1

More In Category

Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.



Brick and Masonry

A journey through masonry reclad litigation

This blog post by Walter P Moore's Mallory Buckley, RRO, PE, BECxP + CxA+BE, and Bob Hancock, MBA, JD, of Munsch Hardt Kopf & Harr PC, explains the importance of documentation, correspondence between parties, and supporting the claims for a Plaintiff-party, while facilitating continuous use of the facility, on construction litigation projects.


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021