flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

USGBC pushes back LEED v4 deadline

USGBC pushes back LEED v4 deadline

LEED 2009 is extended through October 2016


By Peter Fabris, Contributing Editor | October 30, 2014

The U.S. Green Building Council will allow LEED users to register projects under the LEED 2009 rating system until Oct. 31, 2016. The original date for LEED 2009 registration to close was June 15, 2015.

Extending to October 2016 gives LEED users and members of the green building industry additional time to prepare for LEED v4, the latest version of LEED, which features increased rigor and multiple updates, USGBC says.

“When USGBC launched LEED v4 last year, we set out with one goal in mind – to raise the bar in a way that challenges the building industry to reach higher than ever before,” said Rick Fedrizzi, CEO & founding chair, USGBC. “However, the market has requested additional time to prepare for LEED v4, so we are responding.”

In a survey conducted at the 2014 Greenbuild conference, 61% of respondents said they are “not ready” or “unsure” if they are ready to pursue LEED v4 and require additional time to prepare. LEED v4 has been in the market for nearly one year and will remain available for those who are ready.

(http://us5.campaign-archive2.com/?u=ca55cb2e5c853bc823c1f59af&id=2e9f211184&e=e4f9394553)

Related Stories

| Dec 29, 2011

OSHA enforcing new fall hazard standards

OSHA is enforcing its new fall protection standards, as evidenced by a recent crackdown in New York.

| Dec 29, 2011

NRCA offers program on new fall-protection requirements

The National Roofing Contractors Association's (NRCA's) program "Roofing Industry Fall Protection from A to Z" will be held Feb. 21 during the organization's 125th Annual Convention.

| Dec 29, 2011

Decision not to fireproof the new World Trade Center Transportation Hub criticized

Some criticized the decision, reasoning that the structure could be a terrorist target.

| Dec 29, 2011

Seismic safety in question at thousands of California public schools

California regulators responsible for enforcing earthquake safety laws have failed to certify more than 16,000 construction projects in California public schools, increasing the risk that some projects may be unsafe, according to a state audit report.

| Dec 29, 2011

GreenWizard offers cloud-based LEED credit management, assessment

The company recently began offering companies the ability to run assessments for design credits, in addition to traditional product-specific LEED credits.

| Dec 22, 2011

Federal home weatherization program has impacted 6.8 million homes

More than 6.8 million homes have been weatherized using federal, state, utility, and other funds under the American Recovery and Reinvestment Act.

| Dec 22, 2011

Group developing BIM data standards

A collaboration among Georgia Tech’s Digital Building Lab, the Precast Concrete Institute, the American Concrete Institute, and the American Institute of Steel Construction aims to develop global standards for transportation of three-dimensional digital models among fabricator, architecture, engineering, and construction groups.

| Dec 22, 2011

New green code spells out thermal requirement for roof retrofits

The 2012 International Green Construction Code (IgCC) includes a straightforward approach to minimum thermal requirements for roof and wall systems.

| Dec 22, 2011

AGC’s safety conference Jan. 11-13 in San Antonio

The Associated General Contractors of America’s national meeting for safety and health professionals will take place Jan. 11-13, 2012 in San Antonio, TX.

| Dec 22, 2011

Proposed New York City zoning revamp encourages rooftop solar and wind energy

New zoning regulation proposals to make it easier for building owners in New York City to make their structures more sustainable have entered the public approval process.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021