The U.S. Green Building Council released the results of its Supply Chain Optimization Working Group. The group that was chartered to develop implementation procedures within option 3 of the LEED v4 Materials & Resources credit (Building Disclosure and Optimization - Material Ingredients).
The group has recommended significant implementation actions to supplement option 3, intended to provide building product manufacturers with a step-by-step process for meeting its requirements. The working group also created a framework for a field test of the guidance with building product manufacturers. Product manufacturers interested in testing the new option 3 guidance are encouraged to register now.
The working group has outlined minimum steps for product manufacturers that enable them to offer insight and transparency into their processes:
- Publicize guiding principles that include commitments to continual improvement, sharing of information, green chemistry, and green engineering.
- Implement an ISO-14001-type environmental management system, with added elements for human health and safety that addresses all significant environmental and health impacts of their operations.
- Ensure that any direct suppliers of hazardous ingredients have corresponding environmental and health and safety management systems.
There are added incentives for companies that go above and beyond the minimum in situations where, for example, they apply the processes to their entire company or full supply chain.
Related Stories
| Mar 2, 2012
By the Numbers
66 skyscrapers to built in China over six years; 1,000 questions in the Modern Architecture game; 21,000 new jobs.
| Mar 1, 2012
AIA: A clear difference, new developments in load-bearing glass
Earn 1.0 AIA/CES learning units by studying this article and successfully completing the online exam.
| Mar 1, 2012
Bomel completes design-build parking complex at U.C. San Diego
The $24-million facility, which fits into a canyon setting on the university’s East Campus, includes 1,200 stalls in two adjoining garages and a soccer field on a top level.
| Mar 1, 2012
Reconstruction of L.A.’s Dunbar Hotel underway
Withee Malcolm Architects’ designs for the project include the complete renovation of the Dunbar Hotel and the Somerville Apartments I and II.
| Feb 28, 2012
Roofing contractors recognized for workmanship
Sika Sarnafil announces Project of the Year winners; competition highlights visually stunning, energy efficient, and sustainable roofs.
| Feb 26, 2012
Milwaukee U-Haul facility receives LEED-CI Silver
The new elements of the facility now include: efficient lighting with day-lighting controls and occupancy sensors, a high-efficiency HVAC system used in conjunction with a newly constructed thermal envelope to help reduce energy consumption, and the installation of low-flow fixtures to reduce water consumption.
| Feb 22, 2012
Siemens earns LEED certification for Maryland office
The Beltsville facility, which also earned the ENERGY STAR Label for energy performance, implemented a range of energy efficiency, water conservation and sustainable operations measures as part of the certification process.
| Feb 22, 2012
Suffolk awarded Boston post office renovation project
Renovation of art deco landmark will add 21,000 square feet of retail and 110 new parking spaces.
| Feb 20, 2012
Comment period for update to USGBC's LEED Green Building Program now open
This third draft of LEED has been refined to address technical stringency and rigor, measurement and performance tools, and an enhanced user experience.
| Feb 17, 2012
Tremco Inc. headquarters achieves LEED Gold certification
Changes were so extensive that the certification is for new construction and not for renovation; officially, the building is LEED-NC.