flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

USITT Selects Bahrain National Theatre for Honor Award

USITT Selects Bahrain National Theatre for Honor Award

Top architecture honor will be awarded in 2015 for creativity and functional operation.


By BD+C Staff | November 26, 2014
Image courtesy of Nicolas Buisson

The Bahrain National Theatre will be recognized with an Honor Award by the United States Institute for Theatre Technology (USITT) in 2015. The Merit Awards will go to Milton court, the performing arts building at the Guildhall School of Music in London and the Performing Arts Building at Reed College in Portland, Oregon.

Recipients of the USITT Architecture Awards are chosen based on creativity, contextual resonance, functional operation, use of new technology and community contribution. The awards will be presented in Cincinnati, Ohio March 18-21 at USITT’s Annual Conference & Stage Expo. During the event, USITT will offer architecture sessions.

The Bahrain National Theatre, designed by AS. Architecture-Studio with the help of Theatre Projects Consultants of London, is a $50 million project that occupies 12,000 square meters in Manama. The main hall has an Italian theatre layout. The rear of the building contains two tier balconies with balconies running along the side of the construction.

Milton Court is a $142 million projected design by RHWL Architects in London with work by Theatre Projects Consultants. The building has a concert hall with up to 608 seats, a theatre of up to 227 seats, a 128-seat studio theatre, and provides teaching space for the Guildhall School of Music and Drama.

Opsis Architecture of Portland designed Reed College’s $28 million Performing Arts Building with consulting by Fisher Dachs-Associates of New York City. The building contains a consolidated theatre, dance and music programs, a 99-seat box theatre and a 180-seat studio theatre.

For more information, visit www.usitt.org.

 

Related Stories

| Aug 11, 2010

PBK, DLR Group among nation's largest K-12 school design firms, according to BD+C's Giants 300 report

A ranking of the Top 75 K-12 School Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

Turner Building Cost Index dips nearly 4% in second quarter 2009

Turner Construction Company announced that the second quarter 2009 Turner Building Cost Index, which measures nonresidential building construction costs in the U.S., has decreased 3.35% from the first quarter 2009 and is 8.92% lower than its peak in the second quarter of 2008. The Turner Building Cost Index number for second quarter 2009 is 837.

| Aug 11, 2010

AGC unveils comprehensive plan to revive the construction industry

The Associated General Contractors of America unveiled a new plan today designed to revive the nation’s construction industry. The plan, “Build Now for the Future: A Blueprint for Economic Growth,” is designed to reverse predictions that construction activity will continue to shrink through 2010, crippling broader economic growth.

| Aug 11, 2010

New AIA report on embassies: integrate security and design excellence

The American Institute of Architects (AIA) released a new report to help the State Department design and build 21st Century embassies.

| Aug 11, 2010

Section Eight Design wins 2009 Open Architecture Challenge for classroom design

Victor, Idaho-based Section Eight Design beat out seven other finalists to win the 2009 Open Architecture Challenge: Classroom, spearheaded by the Open Architecture Network. Section Eight partnered with Teton Valley Community School (TVCS) in Victor to design the classroom of the future. Currently based out of a remodeled house, students at Teton Valley Community School are now one step closer to getting a real classroom.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021