flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

UT Dallas opens Morphosis-designed Crow Museum of Asian Art

Museums

UT Dallas opens Morphosis-designed Crow Museum of Asian Art

The $63.5 million, 57,000-sf museum will be joined by a two-story music building with a 680-seat performance hall.


By Novid Parsi, Contributing Editor | October 1, 2024
North-facing view of The Sweepers by Wang Shugang at the O'Donnell Athenaeum Phase I Museum. Photo: ©Mauricio Rojas, Courtesy of UT Dallas
North-facing view of The Sweepers by Wang Shugang at the O'Donnell Athenaeum Phase I Museum. Photo: ©Mauricio Rojas, Courtesy of UT Dallas

In Richardson, Tex., the University of Texas at Dallas has opened a second location for the Crow Museum of Asian Art—the first of multiple buildings that will be part of a 12-acre cultural district. 

When completed, the arts and performance complex, called the Edith and Peter O’Donnell Jr. Athenaeum, will include two museums, a performance hall and music building, a grand plaza, and a dedicated parking structure on the Richardson campus.

Designed by Morphosis, the two-story, 57,000-sf Crow Museum of Asian Art more than doubles the gallery space at the Crow Museum’s original location, which will continue to operate in the Dallas Arts District. The Crow Museum, which first opened in 1998, is one of the few U.S. organizations dedicated solely to Asian art.

The design for the new $63.5 million Crow Museum emphasizes transparency and natural light, with large expanses of glass and lightwells in the galleries and lobby. The building features white precast concrete cladding on all sides.

In addition, ground has been broken on the two-story performance hall and music building. The facility will provide a 680-seat performance hall, an outdoor performance space, rehearsal rooms, practice rooms, teaching studios, percussion studio, recording studio, administrative offices, classrooms, multifunctional lobby space, study spaces, and student lounge. Expected to open in fall 2026, the building will be part of the UT Dallas Harry W. Bass Jr. School of Arts, Humanities, and Technology. 

“This complex, like our entire campus, will be a place of learning and growth,” Inga H. Musselman, UT Dallas provost, vice president for academic affairs, and the Cecil H. Green Distinguished Chair of Academic Leadership, said in a statement. “I envision students walking through the museums during their class breaks or taking notes about pieces of art that are displayed here. The performance hall and music building will provide even more opportunities for students.”

On the Crow Museum of Asian Art’s building team:
Design architect and architect of record: Morphosis
MEP engineer: Campos Engineering
Structural engineer: Datum Rios
General contractor: The Beck Group

North view of the Brettell Reading Room from the exterior of the O'Donnell Athenaeum Phase I Museum. Partial View, The Sweepers by Wang Shugang. Photo: ©Mauricio Rojas, Courtesy of UT Dallas
North view of the Brettell Reading Room from the exterior of the O'Donnell Athenaeum Phase I Museum. Partial View, The Sweepers by Wang Shugang. Photo: ©Mauricio Rojas, Courtesy of UT Dallas
O'Donnell Athenaeum Phase I Museum north-facing view, grand staircase, and lobby. Photo: ©Mauricio Rojas, Courtesy of UT Dallas
O'Donnell Athenaeum Phase I Museum north-facing view, grand staircase, and lobby. Photo: ©Mauricio Rojas, Courtesy of UT Dallas
Installation view, Crow Museum of Asian Art at the Phase I Museum, O’Donnell Athenaeum. Photo: ©Mauricio Rojas, Courtesy of UT Dallas
Installation view, Crow Museum of Asian Art at the Phase I Museum, O’Donnell Athenaeum. Photo: ©Mauricio Rojas, Courtesy of UT Dallas
Second-level interior view overlooking the grand stair and landing gallery. Photo: ©Mauricio Rojas, Courtesy of UT Dallas
Second-level interior view overlooking the grand stair and landing gallery. Photo: ©Mauricio Rojas, Courtesy of UT Dallas

 

Related Stories

Resiliency | Jun 24, 2021

Oceanographer John Englander talks resiliency and buildings [new on HorizonTV]

New on HorizonTV, oceanographer John Englander discusses his latest book, which warns that, regardless of resilience efforts, sea levels will rise by meters in the coming decades. Adaptation, he says, is the key to future building design and construction.

Museums | Jun 22, 2021

Cleveland’s Natural History museum to break ground on new Exhibit Hall

The added space will organize its artifacts and specimens to show humanity’s connection to science, the planet, and the universe.

Digital Twin | May 24, 2021

Digital twin’s value propositions for the built environment, explained

Ernst & Young’s white paper makes its cases for the technology’s myriad benefits.

Wood | May 14, 2021

What's next for mass timber design?

An architect who has worked on some of the nation's largest and most significant mass timber construction projects shares his thoughts on the latest design trends and innovations in mass timber.

Museums | Apr 27, 2021

GWWO Architects unveils design of the new Niagara Falls Visitor Center

The project will replace the current outdated and cramped facility.

Market Data | Feb 24, 2021

2021 won’t be a growth year for construction spending, says latest JLL forecast

Predicts second-half improvement toward normalization next year.

boombox1
boombox2
native1

More In Category



Museums

The Tampa Museum of Art will soon undergo a $110 million expansion

In Tampa, Fla., the Tampa Museum of Art will soon undergo a 77,904-sf Centennial Expansion project. The museum plans to reach its $110 million fundraising goal by late 2024 or early 2025 and then break ground. Designed by Weiss/Manfredi, and with construction manager The Beck Group, the expansion will redefine the museum’s surrounding site.


Museums

Connecticut’s Bruce Museum more than doubles its size with a 42,000-sf, three-floor addition

In Greenwich, Conn., the Bruce Museum, a multidisciplinary institution highlighting art, science, and history, has undergone a campus revitalization and expansion that more than doubles the museum’s size. Designed by EskewDumezRipple and built by Turner Construction, the project includes a 42,000-sf, three-floor addition as well as a comprehensive renovation of the 32,500-sf museum, which was originally built as a private home in the mid-19th century and expanded in the early 1990s. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021