flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Vancouver’s building codes may underplay seismic hazard

Seismic Design

Vancouver’s building codes may underplay seismic hazard

Simulations show tall concrete buildings could be vulnerable


By Peter Fabris, Contributing Editor | March 31, 2021
Vancouver’s building codes may underplay seismic hazard

Pixabay

   

Vancouver, Canada’s third largest metropolitan area, has the country’s highest seismic risk.

Recent simulations suggest that existing models used to develop current building codes have underestimated the region’s seismic hazard, according to a new study led by researchers from the University of British Columbia. Vancouver is surrounded by mountains and lies in a basin composed of deep sedimentary deposits near the Cascadia Subduction Zone, an active tectonic plate boundary.

This geology is softer and less compact than the surrounding bedrock, and will amplify shaking caused by seismic waves, researchers say. This makes high-rises in the city more vulnerable to damage from a major earthquake than in other regions.

Ground motion models serve as the foundation for Canada’s national seismic hazard model, and they typically rely on past observations of earthquakes from around the world. Seismic codes are based on these, but do not account for Vancouver’s particular geology. Tall buildings constructed before 1990 are most at risk.

Related Stories

Seismic Design | Oct 17, 2024

Calif. governor signs limited extension to hospital seismic retrofit mandate

Some California hospitals will have three additional years to comply with the state’s seismic retrofit mandate, after Gov. Gavin Newsom signed a bill extending the 2030 deadline.

Adaptive Reuse | Jun 13, 2024

4 ways to transform old buildings into modern assets

As cities grow, their office inventories remain largely stagnant. Yet despite changes to the market—including the impact of hybrid work—opportunities still exist. Enter: “Midlife Metamorphosis.”

Resiliency | Nov 16, 2023

How inclusive design supports resilience and climate preparedness

Gail Napell, AIA, LEED AP BD+C, shares five tips and examples of inclusive design across a variety of building sectors.

Office Buildings | Sep 28, 2023

Structural engineering solutions for office-to-residential conversion

IMEG's Edwin Dean,  Joe Gulden, and Doug Sweeney, share seven key focuses for structural engineers when planning office-to-residential conversions.

3D Printing | Jun 20, 2023

World's largest 3D-printed building completed in Florida

Printed Farms, known for completing Florida’s first permitted 3D-printed house in Tallahassee, announces the completion of the world’s largest 3D-printed building: a luxury horse barn.

Engineers | Jun 5, 2023

How to properly assess structural wind damage

Properly assessing wind damage can identify vulnerabilities in a building's design or construction, which could lead to future damage or loss, writes Matt Wagner, SE, Principal and Managing Director with Walter P Moore.

Mass Timber | Jun 2, 2023

First-of-its-kind shake test concludes mass timber’s seismic resilience

Last month, a 10-story mass timber structure underwent a seismic shake test on the largest shake table in the world.

3D Printing | May 12, 2023

World’s first 3D-printed medical center completed

3D construction printing reached new heights this week as the world’s first 3D-printed medical center was completed in Thailand.

Seismic Design | Feb 27, 2023

Turkey earthquakes provide lessons for California

Two recent deadly earthquakes in Turkey and Syria offer lessons regarding construction practices and codes for California. Lax building standards were blamed for much of the devastation, including well over 35,000 dead and countless building collapses.

Seismic Design | Nov 16, 2022

SPC-4D: 7 reasons California hospital building owners should act now to meet seismic compliance

Seismic compliance with the applicable California building codes is onerous and disruptive for building owners, especially for a building in the heavily regulated sector of healthcare. Owners of older buildings that house acute care services have a big deadline on the horizon—Jan. 1, 2030, the cutoff date to upgrade their buildings to SPC-4D.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021