The design firm Venturi, Scott Brown and Associates, Inc. has become VSBA, LLC and is now under the leadership of president and principal Daniel K. McCoubrey. McCoubrey, together with fellow principal Nancy Rogo Trainer, will build on architectural and planning principles instituted by founders Robert Venturi and Denise Scott Brown.
Dan McCoubrey was principal-in-charge for the Curtis Institute of Music’s new Lenfest Hall and for additions and renovations at the Allentown Art Museum. He recently directed a series of projects for Dumbarton Oaks in Washington, D.C., including a new research library. He has led projects for Penn, Harvard, Yale, Dartmouth, the Barnes Foundation, and the Museum of Contemporary Art, San Diego, among others. A graduate of Penn’s School of Architecture, he has taught at Drexel since 1986, lectures widely, and is a member of the Philadelphia Historical Commission Architectural Review Committee.
Nancy Rogo Trainer was recently principal-in-charge for renovation of historic Fay House at the Radcliffe Institute at Harvard, where she directed renovation of Schlesinger Library and campus planning. She led campus plans for Villanova, Bryn Mawr, and Haverford and designed projects at Harvard Divinity School and Bryn Mawr, among others. A graduate of Penn’s School of Architecture, Nancy teaches at Drexel, lectures extensively, and is a member of the Philadelphia City Planning Commission.
After over fifty years as one of the world’s most renowned architects, Bob Venturi has retired from practice, while Denise Scott Brown continues to publish and present her work. +
Related Stories
| Apr 24, 2014
Unbuilt and Famous: LEGO releases box set of Bjarke Ingels' LEGO museum
LEGO Architecture has created a box set that customers can use to build replicas of the LEGO Museum, which is not yet built in real life. The museum, designed by the Bjarke Ingels Group, will commemorate the history of LEGO.
| Apr 23, 2014
Ahead of the crowd: How architects can utilize crowdsourcing for project planning
Advanced methods of data collection, applied both prior to design and after opening, are bringing a new focus to the entire planning process.
| Apr 23, 2014
Developers change gears at Atlantic Yards after high-rise modular proves difficult
At 32 stories, the B2 residential tower at Atlantic Yards has been widely lauded as a bellwether for modular construction. But only five floors have been completed in 18 months.
| Apr 23, 2014
Experimental bot transfers CAD plans onto construction sites
The Archibot is intended to take technical data and translate it into full-scale physical markings on construction sites.
| Apr 23, 2014
Mean and Green: Top 10 green building projects for 2014 [slideshow]
The American Institute of Architects' Committee on the Environment has selected the top ten examples of sustainable architecture and ecological design projects that protect and enhance the environment. Projects range from a project for Portland's homeless to public parks to a LEED Platinum campus center.
| Apr 23, 2014
Architecture Billings Index dips in March
The March ABI score was 48.8, down sharply from a mark of 50.7 in February. This score reflects a decrease in design services.
Sponsored | | Apr 23, 2014
Ridgewood High satisfies privacy, daylight and code requirements with fire rated glass
For a recent renovation of a stairwell and exit corridors at Ridgewood High School in Norridge, Ill., the design team specified SuperLite II-XL 60 in GPX Framing for its optical clarity, storefront-like appearance, and high STC ratings.
| Apr 22, 2014
Transit-friendly apartment building now under construction
The new $44 million community is situated on eight acres, directly adjacent to the local Park-n-Ride, and a quick walk from a nearby light rail station.
| Apr 22, 2014
Bright and bustling: Grimshaw reveals plans for the Istanbul Grand Airport [slideshow]
In partnership with the Nordic Office of Architecture and Haptic Architects, Grimshaw Architects has revealed its plans for the terminal of what will be one of the world's busiest airports. The terminal is expected to serve 150 million passengers per year.
| Apr 21, 2014
10 design-build best practices
Design-build requires more than a good contract and appropriate risk allocation, says the DBIA. Everyone from the owner to the subcontractors must understand the process, the expectations, and fully engage in the collaboration.