flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Venturi Scott Brown and Associates Becomes VSBA, LLC

Venturi Scott Brown and Associates Becomes VSBA, LLC

After over fifty years as one of the world’s most renowned architects, Bob Venturi has retired from practice, while Denise Scott Brown continues to publish and present her work.


By Posted by Tim Gregorski, Senior Editor | July 23, 2012
Nancy Rogo Trainer and Daniel K. McCoubrey
Nancy Rogo Trainer and Daniel K. McCoubrey
This article first appeared in the August 2012 issue of BD+C.

The design firm Venturi, Scott Brown and Associates, Inc. has become VSBA, LLC and is now under the leadership of president and principal Daniel K. McCoubrey. McCoubrey, together with fellow principal Nancy Rogo Trainer, will build on architectural and planning principles instituted by founders Robert Venturi and Denise Scott Brown.

Dan McCoubrey was principal-in-charge for the Curtis Institute of Music’s new Lenfest Hall and for additions and renovations at the Allentown Art Museum. He recently directed a series of projects for Dumbarton Oaks in Washington, D.C., including a new research library. He has led projects for Penn, Harvard, Yale, Dartmouth, the Barnes Foundation, and the Museum of Contemporary Art, San Diego, among others. A graduate of Penn’s School of Architecture, he has taught at Drexel since 1986, lectures widely, and is a member of the Philadelphia Historical Commission Architectural Review Committee.

Nancy Rogo Trainer was recently principal-in-charge for renovation of historic Fay House at the Radcliffe Institute at Harvard, where she directed renovation of Schlesinger Library and campus planning. She led campus plans for Villanova, Bryn Mawr, and Haverford and designed projects at Harvard Divinity School and Bryn Mawr, among others. A graduate of Penn’s School of Architecture, Nancy teaches at Drexel, lectures extensively, and is a member of the Philadelphia City Planning Commission.

After over fifty years as one of the world’s most renowned architects, Bob Venturi has retired from practice, while Denise Scott Brown continues to publish and present her work. +

Related Stories

| Feb 29, 2012

Construction begins on Keller Army Community Hospital addition

The 51,000 square foot addition will become the home for optometry, ophthalmology, physical therapy, and orthopedics clinics, as well as provide TRICARE office space.

| Feb 29, 2012

Carvalho appointed Shawmut Safety Director

He has been a driving force behind multiple safety-orientated initiatives at Shawmut, including Safety Week, the creation of an online safety manual, and the implementation of a new safety reporting and tracking system. 

| Feb 29, 2012

Shepley Bulfinch selected to design new Children’s Hospital of Buffalo

The firm was selected because of their past experience in designing clinically complex facilities that emphasize patient- and family-centered care and operational efficiency as well as distinctive architectural forms for many other children's and women's hospitals.

| Feb 28, 2012

Roofing contractors recognized for workmanship

Sika Sarnafil announces Project of the Year winners; competition highlights visually stunning, energy efficient, and sustainable roofs.

| Feb 28, 2012

Waste Management awards companies for sustainable construction

This recognition, highlighting sustainable performances within the construction industry, looks to celebrate the builders who achieved important sustainability milestones in 2011, as determined by Waste Management’s online Diversion and Recycling Tracking Tool.

| Feb 28, 2012

Salem State University Library & Learning Commons topped off

When it opens to students in the fall of 2013, the $60 million facility will offer new archival space; circulation and reference areas; collections; reading spaces; study rooms; instruction labs and a Dean’s suite. 

| Feb 28, 2012

More than 1,000 have earned EDAC certification since 2009

Milestone achieved as evidence-based design becomes a top 2012 strategy for healthcare organizations.

| Feb 28, 2012

McCarthy completes second phase of San Diego’s Scripps Hospital

Representing the second phase of a four-phased, $41.3 million expansion and remodeling project, the new addition doubles the size of the existing emergency department and trauma center to encompass a combined 27,000 square feet of space. 

| Feb 28, 2012

LUMEnergi names Weinbaum president and CEO

Weinbaum’s experience spans communications, nanotechnology, electronics components, consumer products, semiconductors, software, wireless and lighting.

| Feb 28, 2012

Griffin Electric completes Medical University of South Carolina project

The 210,000-sf complex is comprised of two buildings, and houses research, teaching and office areas, plus conference spaces for the University.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021