flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Accelerate Live! talk: Using artificial intelligence for the future state of construction scheduling

Accelerate Live! talk: Using artificial intelligence for the future state of construction scheduling


May 24, 2018

 

SUMMARY
Artificial intelligence—like so many of the topics featured at Accelerate Live!—was nothing more than a pipe dream five years ago.

Yet, in just a few short years, AI has shifted from R&D and academia into the marketplace, thanks to several enterprising startups. These firms offer custom and off-the-self solutions for optimizing many of the complex and convoluted processes in commercial design and construction.

In this 15-minute talk at BD+C’s Accelerate Live! conference (May 10, 2018, Chicago), we hear from two of the earliest adopters of AI-driven processes in commercial construction.  

Rick Khan is the Senior Director of Innovation with Mortenson Construction.

Rene Morkos is the CEO of ALICE Technologies, a Stanford University startup that uses AI to optimize construction scheduling.

Rick and Rene speak about Mortensen’s recent pilot of the ALICE platform on construction projects, as well as the construction giant’s ongoing plans for AI.

 

ABOUT THE SPEAKERS
Ricardo Khan
Senior Director of Innovation, Mortenson Construction

As the Senior Director of Innovation, Rick leads the Mortenson Innovators Program with a goal to inspire, engage and partner with all internal team members in the process of idea incubation, solution validation, and then to commitment and launch of new ways of working. Rick's focus is on Big 'I' Innovation that targets a 10x value creation. Prior to his current role, Rick Led Mortenson's Project Solutions department, focused on operations excellence. Project Solutions supports project teams from concept through closeout by providing expertise in project management, planning & scheduling, virtual design & construction, and innovation services. We have two key areas of focus, enhancing today's processes while creating the future state of construction through research and development.

Rene Morkos
CEO, ALICE Technologies

Rene Morkos' professional experience includes working as a project manager in Afghanistan, underwater construction in Lebanon, automation engineering on a $350 million gas refinery expansion in Abu Dhabi, and Virtual Design and Construction consulting around the world. He completed his PhD in Artificial Intelligence applications for construction as a Charles H. Leavell fellow at Stanford University.

 

RELATED ARTICLES

Tech Report 5.0: AI Arrives

Takeaways and recap from BD+C's 2018 Accelerate Live! innovation conference

   
 

 

Related Stories

| Jun 13, 2017

Accelerate Live! talk: Next-gen materials for the built environment, Blaine Brownell, Transmaterial

Architect and materials guru Blaine Brownell reveals emerging trends and applications that are transforming the technological capacity, environmental performance, and design potential of architecture.

| Jun 13, 2017

Accelerate Live! talk: Incubating innovation through R&D and product development, Jonatan Schumacher, Thornton Tomasetti

Thornton Tomasetti’s Jonatan Schumacher presents the firm’s business model for developing, incubating, and delivering cutting-edge tools and solutions for the firm, and the greater AEC market.

| Jun 13, 2017

Accelerate Live! talk: The future of computational design, Ben Juckes, Yazdani Studio of CannonDesign

Yazdani’s Ben Juckes discusses the firm’s tech-centric culture, where scripting has become an every-project occurrence and each designer regularly works with computational tools as part of their basic toolset.

| Jun 13, 2017

Accelerate Live! talk: A case for Big Data in construction, Graham Cranston, Simpson Gumpertz & Heger

Graham Cranston shares SGH’s efforts to take hold of its project data using mathematical optimization techniques and information-rich interactive visual graphics.

| Jun 13, 2017

Accelerate Live! talk: Scaling change in a changing industry, Chris Mayer, Suffolk Construction

Suffolk’s CIO Chris Mayer talks about the firm’s framework for vetting and implementing new technologies and processes.

| Jun 13, 2017

Accelerate Live! talk: Gaming tech in construction, Lucas Richmond, Gilbane

Learn why Gilbane’s Lucas Richmond is looking outside the AEC industry to build his rockstar gaming and media team.

| Jun 12, 2017

Accelerate Live! talk: From job site to factory, the future of commercial construction, Tyler Goss, Turner

Turner Construction’s Tyler Goss presents the construction giant’s breakthrough “job site as a factory” initiative.

| Jun 12, 2017

Accelerate Live! talk: The world's smartest buildings, Derik Eckhardt, Miller Hull Partnership

Discover what architect Derik Eckhardt learned during his worldwide tour of the globe’s smartest buildings, from Abu Dhabi to Amsterdam to Stuttgart to Dubai.

| Jun 12, 2017

Accelerate Live! talk: Preparing for the AI revolution, Alan Robles, Gensler

Gensler’s Alan Robles shares how the AEC Giant firm is preparing its project teams and clients for the coming artificial intelligence movement.

Accelerate Live! | Jun 5, 2017

The road to innovation: Ideas need to be nurtured, then managed

Skepticism is healthy and can weed out half-baked ideas.

Related Stories

| Jun 2, 2017

Accelerate Live! talk: How maker culture is transforming Sasaki’s design practice

Sasaki’s Pablo Savid-Buteler and Brad Prestbo talk about how the firm’s maker initiatives are changing the way Sasaki goes to market, and how they are helping the firm win new business.

| May 30, 2017

Accelerate Live! talk: The ROI of innovation culture, Russ Sykes, SmithGroupJJR

Russ Sykes discusses SmithGroupJJR’s ongoing journey to create a firm culture that ignites innovation and propels change across all levels of the organization.

| May 30, 2017

Accelerate Live! talk: Finding the money for your clients' projects, Paul Westlake, Jr., DLR Group|WRL

Architect Paul Westlake, Jr., shares his methods for adding value to projects through creative financing.

| May 30, 2017

Accelerate Live! talk: Health-generating buildings, Marcene Kinney, Angela Mazzi, GBBN Architects

Architects Marcene Kinney and Angela Mazzi share design hacks pinpointing specific aspects of the built environment that affect behavior, well-being, and performance.

| May 24, 2017

Accelerate Live! talk: Applying machine learning to building design, Daniel Davis, WeWork

Daniel Davis offers a glimpse into the world at WeWork, and how his team is rethinking workplace design with the help of machine learning tools.

| May 24, 2017

Accelerate Live! talk: Learning from Silicon Valley - Using SaaS to automate AEC, Sean Parham, Aditazz

Sean Parham shares how Aditazz is shaking up the traditional design and construction approaches by applying lessons from the tech world.

| May 24, 2017

Accelerate Live! talk: The data-driven future for AEC, Nathan Miller, Proving Ground

In this 15-minute talk at BD+C’s Accelerate Live! (May 11, 2017, Chicago), Nathan Miller presents his vision of a data-driven future for the business of design.

boombox1
boombox2
native1

More In Category



Accelerate Live!

Watch all 19 Accelerate Live! talks on demand

BD+C’s second annual Accelerate Live! AEC innovation conference (May 10, 2018, Chicago) featured talks on AI for construction scheduling, regenerative design, the micro-buildings movement, post-occupancy evaluation, predictive visual data analytics, digital fabrication, and more. Take in all 19 talks on demand.


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021