flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Building Science: What is a CHP?

Building Science: What is a CHP?


July 21, 2015
Video Player is loading.
Current Time 0:00
Duration 0:00
Loaded: 0%
Stream Type LIVE
Remaining Time 0:00
 
1x
    • Chapters
    • descriptions off, selected
    • captions off, selected

      We visit Yanmar’s facility in Adairsville, Ga., to learn how Combined Heat and Power units CHP), a compact and seemingly quiet technology, can power and heat an entire facility.

      Related Stories

      | Nov 2, 2010

      Wind Power, Windy City-style

      Building-integrated wind turbines lend a futuristic look to a parking structure in Chicago’s trendy River North neighborhood. Only time will tell how much power the wind devices will generate.

      | Nov 2, 2010

      Energy Analysis No Longer a Luxury

      Back in the halcyon days of 2006, energy analysis of building design and performance was a luxury. Sure, many forward-thinking AEC firms ran their designs through services such as Autodesk’s Green Building Studio and IES’s Virtual Environment, and some facility managers used Honeywell’s Energy Manager and other monitoring software. Today, however, knowing exactly how much energy your building will produce and use is survival of the fittest as energy costs and green design requirements demand precision.

      | Nov 2, 2010

      Yudelson: ‘If It Doesn’t Perform, It Can’t Be Green’

      Jerry Yudelson, prolific author and veteran green building expert, challenges Building Teams to think big when it comes to controlling energy use and reducing carbon emissions in buildings.

      | Nov 2, 2010

      Historic changes to commercial building energy codes drive energy efficiency, emissions reductions

      Revisions to the commercial section of the 2012 International Energy Conservation Code (IECC)  represent the largest single-step efficiency increase in the history of the national, model energy. The changes mean that new and renovated buildings constructed in jurisdictions that follow the 2012 IECC will use 30% less energy than those built to current standards.

      | Nov 1, 2010

      Sustainable, mixed-income housing to revitalize community

      The $41 million Arlington Grove mixed-use development in St. Louis is viewed as a major step in revitalizing the community. Developed by McCormack Baron Salazar with KAI Design & Build (architect, MEP, GC), the project will add 112 new and renovated mixed-income rental units (market rate, low-income, and public housing) totaling 162,000 sf, plus 5,000 sf of commercial/retail space.

      | Nov 1, 2010

      Vancouver’s former Olympic Village shoots for Gold

      The first tenants of the Millennium Water development in Vancouver, B.C., were Olympic athletes competing in the 2010 Winter Games. Now the former Olympic Village, located on a 17-acre brownfield site, is being transformed into a residential neighborhood targeting LEED ND Gold. The buildings are expected to consume 30-70% less energy than comparable structures.

      | Oct 27, 2010

      Grid-neutral education complex to serve students, community

      MVE Institutional designed the Downtown Educational Complex in Oakland, Calif., to serve as an educational facility, community center, and grid-neutral green building. The 123,000-sf complex, now under construction on a 5.5-acre site in the city’s Lake Merritt neighborhood, will be built in two phases, the first expected to be completed in spring 2012 and the second in fall 2014.

      | Oct 21, 2010

      GSA confirms new LEED Gold requirement

      The General Services Administration has increased its sustainability requirements and now mandates LEED Gold for its projects.

      | Oct 18, 2010

      World’s first zero-carbon city on track in Abu Dhabi

      Masdar City, the world’s only zero-carbon city, is on track to be built in Abu Dhabi, with completion expected as early as 2020. Foster + Partners developed the $22 billion city’s master plan, with Adrian Smith + Gordon Gill Architecture, Aedas, and Lava Architects designing buildings for the project’s first phase, which is on track to be ready for occupancy by 2015.

      | Oct 13, 2010

      Editorial

      The AEC industry shares a widespread obsession with the new. New is fresh. New is youthful. New is cool. But “old” or “slightly used” can be financially profitable and professionally rewarding, too.

      boombox1
      boombox2
      native1

      More In Category


      Sustainable Design and Construction

      Northglenn, a Denver suburb, opens a net zero, all-electric city hall with a mass timber structure

      Northglenn, Colo., a Denver suburb, has opened the new Northglenn City Hall—a net zero, fully electric building with a mass timber structure. The 32,600-sf, $33.7 million building houses 60 city staffers. Designed by Anderson Mason Dale Architects, Northglenn City Hall is set to become the first municipal building in Colorado, and one of the first in the country, to achieve the Core certification: a green building rating system overseen by the International Living Future Institute.



      halfpage1

      Most Popular Content

      1. 2021 Giants 400 Report
      2. Top 150 Architecture Firms for 2019
      3. 13 projects that represent the future of affordable housing
      4. Sagrada Familia completion date pushed back due to coronavirus
      5. Top 160 Architecture Firms 2021