General contractors have discovered this system helps them to be more productive by achieving installations in days rather than weeks. It's ideal for starting early in new construction and when major renovation projects uncover severely compromised concrete slabs. The SUPERCAP system helps clear up the age-old disparity between concrete flatness and floor flatness (FF) tolerances in both Division 3 and Division 9. The results are shorter build schedules and improved GC margins while delivering better outcomes for owners. Hear LATICRETE SUPERCAP Applicators from around the country share their results of their experience with the system.
For more information visit, www.laticretesupercap.com.