flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Vinyl reveals meet increasing demand

Sponsored Content Building Materials

Vinyl reveals meet increasing demand

With a tight school renovation budget and timeline, the Oak Grove Elementary cafeteria, designed by RuckPate Architects/CS2 Designs, utilized Architectural Reveals to build curving soffits with a racing stripe reveal design.


By Trim-Tex | March 20, 2017

Sherwood Park Mall, Alberta Canada - Pre-made Architectural Reveal Intersections kept the project on schedule while the mall remained opened during renovations.

Designing with Curved Walls

The benefits of vinyl reveals are unmatched for finishing curved walls. Traditional metal reveals are ideal for clean straight lines on long runs of drywall. Unfortunately, finishing curved walls with traditional metal reveals requires custom ordering and increased lead time for material -- two factors some projects can't manage. However, the material properties of vinyl allow Architectural Reveal Bead to flex and form to curved surfaces right out of the box.

With a tight school renovation budget and timeline, the Oak Grove Elementary cafeteria, designed by RuckPate Architects/CS2 Designs, utilized Architectural Reveals to build curving soffits with a racing stripe reveal design.

 

Built-in Expansion Protection

Along with the benefit of being able to finish curved interior details, Trim-Tex Architectural Reveals offer expansion protection. Vinyl reveals offer up to 1/8" of expansion protection, which is important to reduce drywall cracking in long runs of drywall.

Trim-Tex Architectural Reveals were used to finish the rotunda at the new Northwestern Mutual Tower in Milwaukee, WI., design by Kendall/Heaton Associates, Pickard Chilton, and Valerio Dewalt Train Associates. Trim-Tex reveals were ideal for adding detail to the curved walls as well as offering needed expansion protection due to the large scale of the ceiling feature.

 

Responsible Material Choices

Along with cost savings, vinyl reveals offer additional benefits over metal reveals. Unlike metal alternatives, Architectural Reveal Beads won't dent, kink or rust. These benefits save on job site damage costs, as well as future maintenance of the building for years to come.

Architectural Reveal Beads are also a responsible building material choice. All Trim-Tex products are manufactured from at least 70% recycled material.

Sherwood Park Mall, located in Alberta Canada, finished by T Kerr Interior Systems, opted for Architectural Series Reveals and Intersections. The vinyl reveals create straight clean shadow lines over long runs. Additionally, Trim-Tex supplied custom built intersections to speed up project completion by reducing the need for making job site miter cuts. Speed was important in this project as the mall continued to stay in operation during renovations.

 

(left) Northwestern Mutual Tower, Milwaukee, Wis. (right) Oak Grove Elementary Cafeteria, Oak Grove, Ill. 

 

Cost savings, superior quality, and flexibility that vinyl reveals afford have architects rewriting their specifications for Trim-Tex Architectural Reveal Beads. Request free samples of all Trim-Tex products at www.trim-tex.com

For more information including Submittals, Specifications, and CAD/BIM on Trim-Tex Architectural Reveals please visit http://www.trim-tex.com/products/overview/commercial-beads/shadow-reveal-beads/architectural-reveal-bead/

Related Stories

| Mar 30, 2012

New windows and doors revitalize older buildings

With their improved aesthetics, energy efficiency, and durability, replacement windows and doors can add significant value to a renovation project.

| Mar 29, 2012

Roller shade operating system wins IF Product Design Award

Design experts in the iF jury recognized the engineering invested in the RB 500 Roller Shade, including a metal clutch with a patented construction, a durable zamac housing with polished finish, and a chain drive unit that excels in maximum operating comfort.

| Mar 29, 2012

Construction completed on Las Vegas’ newest performing arts center

The Smith Center will be the first major multi-purpose performance center in the U.S. to earn Silver LEED certification.

| Mar 28, 2012

Meridian Design Build Begins work on 38 acre redevelopment project

The project includes construction of a new 150,585-sf cross dock facility that will include full service truck maintenance and repair bays, a truck wash, and approximately 20,000-sf of corporate office space.

| Mar 28, 2012

Ideas and input drive stories in online community, noraXchange

Community designed to help building and design professionals address challenges they face in their jobs. 

| Mar 27, 2012

Skanska hires aviation construction expert Bob Postma

Postma will manage Skanska’s nationwide in-house team of airport construction experts who lead the industry in building and renovating airport facilities and their essential features.

| Mar 27, 2012

Precast concrete used for affordable, sustainable housing in New York

Largest affordable housing development in the nation will provide housing for close to 500,000 people. 

| Mar 27, 2012

Groundbreaking held for Valencia College West Campus Building 10 in Orlando

Project led by design-build team of SchenkelShultz Architecture and McCree General Contractors, both of Orlando.

| Mar 26, 2012

Jones Lang LaSalle completes construction of $536M Parkview Regional Medical Center

Hospital ushers in new era of local access to advanced medical treatments in Northeast Indiana.

| Mar 26, 2012

McCarthy tops off Math and Science Building at San Diego Mesa College

Designed by Architects | Delawie Wilkes Rodrigues Barker, the new San Diego Mesa College Math and Science Building will provide new educational space for students pursuing degree and certificate programs in biology, chemistry, physical sciences and mathematics.

boombox1
boombox2
native1

More In Category


Brick and Masonry

A journey through masonry reclad litigation

This blog post by Walter P Moore's Mallory Buckley, RRO, PE, BECxP + CxA+BE, and Bob Hancock, MBA, JD, of Munsch Hardt Kopf & Harr PC, explains the importance of documentation, correspondence between parties, and supporting the claims for a Plaintiff-party, while facilitating continuous use of the facility, on construction litigation projects.



Glass and Glazing

The next generation of thermal glazing: How improving U-value can yield energy savings and reduce carbon emissions

The standards for energy-efficient construction and design have been raised. Due to the development of advanced low-e coatings for the interior surface and vacuum insulating technologies, architects now have more choices to improve U-values wherever enhanced thermal performance is needed to create eco-friendly spaces. These options can double or even triple thermal performance, resulting in annual energy savings and a positive return on carbon.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021