Matthew Wagner, PE, has joined Ghafari Associates as its Manager of Structural Engineering in Chicago. With over a decade of structural facility design experience, Wagner brings an impressive portfolio of large-scale stadia, healthcare, hospitality, civic and aviation projects to the firm.
Wagner comes to Ghafari from Walter P Moore, where he served as a principal, chaired the construction administration task force and led the design of numerous projects ranging in size from $10 million to $70 million. Most recently, he assisted with the expansion of the LSU Tiger Stadium’s South End Zone, which will open for the 2014 college football season.
Wagner also assisted in the design of the main grandstand for the new Circuit of The Americas entertainment complex in Austin, Texas. The $400 million, 3.4-mile racetrack recently hosted the inaugural Formula 1 United States Grand Prix race on November 18. Other major projects include the $1.9 billion Palazzo resort hotel and casino in Las Vegas, the 760,000 square foot San Antonio Military Medical Center and Dallas / Fort Worth International Airport’s Terminal D.
Wagner, an Ohio native, earned a bachelor’s degree in civil engineering from the University of Cincinnati and a master’s degree in civil engineering from the Georgia Institute of Technology. He is a licensed professional engineer and affiliate member of the American Institute of Architects. +
Related Stories
| Nov 29, 2011
Turner Construction establishes partnership with Clark Builders
Partnership advances growth in the Canadian marketplace.
| Nov 29, 2011
AIA launches stalled projects database
To populate this database with both stalled projects and investors interested in financing them, the AIA in the last week initiated a communications campaign to solicit information about stalled projects around the country from its members and allied professionals.
| Nov 28, 2011
Leo A Daly and McCarthy Building complete Casino Del Sol expansion in Tucson, Ariz.
Firms partner with Pascua Yaqui Tribe to bring new $130 million Hotel, Spa & Convention Center to the Tucson, Ariz., community.
| Nov 28, 2011
Armstrong acquires Simplex Ceilings
Simplex will become part of the Armstrong Building Products division.
| Nov 28, 2011
Nauset Construction completes addition for Franciscan Hospital for Children
The $6.5 million fast-track, urban design-build projectwas completed in just over 16 months in a highly sensitive, occupied and operational medical environment.
| Nov 23, 2011
Lord, Aeck & Sargent opens fourth U.S. office, acquiring architecture firm in Austin, Texas
Strategic move offers growth opportunity and strengthens the firm’s historic preservation portfolio.
| Nov 23, 2011
Griffin Electric completes Gwinnett Tech project
Accommodating up to 3,000 students annually beginning this fall, the 78,000-sf, three-story facility consists of thirteen classrooms and twelve high-tech laboratories, in addition to several lecture halls and faculty offices.
| Nov 22, 2011
Corporate America adopting revolutionary technology
The survey also found that by 2015, the standard of square feet allocated per employee is expected to drop from 200 to estimates ranging from 50 to 100 square feet per person dependent upon the industry sector.
| Nov 22, 2011
Report finds that L.A. lags on solar energy, offers policy solutions
Despite robust training programs, L.A. lacks solar jobs; lost opportunity for workers in high-need communities.
| Nov 22, 2011
Saskatchewan's $1.24 billion carbon-capture project
The government of Saskatchewan has approved construction of the Boundary Dam Integrated Carbon Capture and Storage Demonstration Project.