Global engineering firm Walter P Moore has opened its sixth international office in Mexico City, Mexico, appointing Miguel Hernández as Manager of Business Development, who will be leading expansion efforts in the area. Service offerings include insurance and litigation support, waterproofing consulting, materials consulting, assessments and repairs, corrosion mitigation, bridge assessment, and flood evaluation among others. The Mexico City office officially opened on August 27, 2021.
“Expanding our presence into Mexico City has been our goal for many years and we are thrilled to have Miguel Hernández on board to represent us in Mexico,” said Dr. Gabriel Jiménez, Managing Principal and Executive Director of Walter P Moore’s Diagnostics Group. “Walter P Moore has built its legacy on exceptional client service, and we can now offer our clients in Latin America a deeper quality of service and partnership with a full team of experts across the region and in Mexico’s largest city.”
Hernández’s expertise includes assessing and designing repairs for distress related to concrete, steel, and masonry structures with a specialization in seismic assessments and retrofits, fire evaluations, building envelope moisture management, and roofing systems.
“I am excited to lead the efforts in growing our presence in Mexico. We are ready to dive in on projects across Mexico and Latin America and to continue tackling existing building problems with creativity, cooperation, and commitment,” Hernández says.
“Our move into Mexico City represents an incredible opportunity to leverage our entire platform more deeply within the international market bringing value to our clients. I am excited about the unique opportunities it presents to build new client relationships in several of our targeted market sectors, especially leveraging our expertise in forensic analysis,” adds Dilip Choudhuri, President and CEO of Walter P Moore.
Related Stories
| Nov 1, 2010
Vancouver’s former Olympic Village shoots for Gold
The first tenants of the Millennium Water development in Vancouver, B.C., were Olympic athletes competing in the 2010 Winter Games. Now the former Olympic Village, located on a 17-acre brownfield site, is being transformed into a residential neighborhood targeting LEED ND Gold. The buildings are expected to consume 30-70% less energy than comparable structures.
| Oct 27, 2010
Grid-neutral education complex to serve students, community
MVE Institutional designed the Downtown Educational Complex in Oakland, Calif., to serve as an educational facility, community center, and grid-neutral green building. The 123,000-sf complex, now under construction on a 5.5-acre site in the city’s Lake Merritt neighborhood, will be built in two phases, the first expected to be completed in spring 2012 and the second in fall 2014.
| Oct 21, 2010
GSA confirms new LEED Gold requirement
The General Services Administration has increased its sustainability requirements and now mandates LEED Gold for its projects.
| Oct 18, 2010
World’s first zero-carbon city on track in Abu Dhabi
Masdar City, the world’s only zero-carbon city, is on track to be built in Abu Dhabi, with completion expected as early as 2020. Foster + Partners developed the $22 billion city’s master plan, with Adrian Smith + Gordon Gill Architecture, Aedas, and Lava Architects designing buildings for the project’s first phase, which is on track to be ready for occupancy by 2015.
| Oct 13, 2010
Editorial
The AEC industry shares a widespread obsession with the new. New is fresh. New is youthful. New is cool. But “old” or “slightly used” can be financially profitable and professionally rewarding, too.
| Oct 13, 2010
Test run on the HP Z200 SFF Good Value in a Small Package
Contributing Editor Jeff Yoders tests a new small-form factor, workstation-class desktop in Hewlett-Packard’s line that combines performance of its minitower machine with a smaller chassis and a lower price.
| Oct 13, 2010
Prefab Trailblazer
The $137 million, 12-story, 500,000-sf Miami Valley Hospital cardiac center, Dayton, Ohio, is the first major hospital project in the U.S. to have made extensive use of prefabricated components in its design and construction.
| Oct 13, 2010
Thought Leader
Sundra L. Ryce, President and CEO of SLR Contracting & Service Company, Buffalo, N.Y., talks about her firm’s success in new construction, renovation, CM, and design-build projects for the Navy, Air Force, and Buffalo Public Schools.
| Oct 13, 2010
Hospital tower gets modern makeover
The Wellmont Holston Valley Medical Center in Kingsport, Tenn., expanded its D unit, a project that includes a 243,443-sf addition with a 12-room operating suite, a 36-bed intensive care unit, and an enlarged emergency department.