flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Washington Redskins hire Bjarke Ingels Group to design new stadium

Sports and Recreational Facilities

Washington Redskins hire Bjarke Ingels Group to design new stadium

The Danish firm is short on designing football stadiums, but it has led other impressive large scale projects.


By Mike Chamernik, Associate Editor | January 8, 2016
Washington Redskins hire Bjarke Ingels Group to design new stadium

The Redskins have played at the Maryland-based FedEx Field since 1997, but the team feels that it is time for a new home. Photo: dctourism/Creative Commons

The Washington Redskins always find a way to draw attention. With the NFL playoffs starting this weekend, and with the owners voting early next week on which three teams will move to Los Angeles, reports have surfaced saying that the D.C. franchise is looking to build a new home.

The Redskins have hired Danish architecture team Bjarke Ingels Group (BIG), according to the Washington Post. No location has been set, but unlike the St. Louis Rams, Oakland Raiders, and San Diego Chargers, the Redskins will not be L.A.-bound. The team will stay in the DMV region, and building at the site of the Robert F. Kennedy Memorial Stadium in Washington is an option.

BIG is inexperienced with designing NFL stadiums, but the firm has drawn plenty of attention recently. Its portfolio includes Google’s headquarters campus in Mountain View, Calif., and Two World Trade Center in New York City.

The Redskins, led by hands-on owner Daniel Snyder, are trying to leave the 82,000-seat FedEx Field in Landover, Md. The facility has been in use since 1997, and its current lease runs through 2027.

The team been trying to conjure up local support for a new home, but the Washington Post report says politicians might not be willing to help because of the team’s nickname, which many Native American groups consider a racist slur.

Related Stories

| Mar 1, 2012

Bomel completes design-build parking complex at U.C. San Diego

The $24-million facility, which fits into a canyon setting on the university’s East Campus, includes 1,200 stalls in two adjoining garages and a soccer field on a top level. 

| Feb 24, 2012

Skanska hires Tingle as senior VP and national director for its Sports Center of Excellence

Tingle has worked in the architecture and construction industries for more than 30 years, and for the last 23 years, he has focused primarily on large-scale sports construction projects

| Feb 2, 2012

Shawmut Design and Construction launches sports venues division

Expansion caps year of growth for Shawmut.

| Jan 31, 2012

Fusion Facilities: 8 reasons to consolidate multiple functions under one roof

‘Fusing’ multiple functions into a single building can make it greater than the sum of its parts. The first in a series  on the design and construction of university facilities.

| Nov 29, 2011

SB Architects completes Mission Hills Volcanic Mineral Springs and Spa in China

Mission Hills Volcanic Mineral Springs and Spa is home to the largest natural springs reserve in the region, and measures 950,000 sf.

| Nov 11, 2011

Streamline Design-build with BIM

How construction manager Barton Malow utilized BIM and design-build to deliver a quick turnaround for Georgia Tech’s new practice facility.

| Nov 9, 2011

Sika Sarnafil Roof Recycling Program recognized by Society of Plastics Engineers

Program leads the industry in recovering and recycling roofing membrane into new roofing products.

| Nov 1, 2011

Sasaki expands national sports design studio

Sasaki has also added Stephen Sefton to the sports design studio as senior associate. 

| Oct 20, 2011

UNT receives nation’s first LEED Platinum designation for collegiate stadium

Apogee Stadium will achieve another first in December with the completion of three wind turbines that will feed the electrical grid that powers the stadium.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021