flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Washington State construction industry restart plan has three phases

Codes and Standards

Washington State construction industry restart plan has three phases

In state with earliest COVID-19 cases, advisory group developing priorities based on risk.


By Peter Fabris, Contributing Editor | May 14, 2020

Courtesy Pixabay

Washington State is developing a three-phase approach to restarting the construction industry after a halt due to the COVID-19 pandemic.

The state with the first reported cases in the U.S., Washington formed a construction advisory group to make recommendations on how to reopen construction activity. That group has sent its plan to Gov. Jay Inslee.

Most of the first-phase projects to reopen could include some commercial, residential, and road building jobs that were already started when the shutdown occurred. These low-risk projects would allow for safe social distancing of six feet of space between workers.

The second phase of projects would include new and existing jobs that can’t consistently conform to social distancing requirements. There would be requirements for personal protective equipment for workers stationed within six feet of each other.

Phase three involves projects with more opportunities for workers to crowd together such as skyscrapers where people have to use elevators and may not have access to hand-washing stations on every floor. The recommendations were a result of collaboration between labor and management. Every decision was reportedly unanimous.

Related Stories

| Feb 23, 2012

Federal budget cuts put major building projects on hold

A plan to build the National Bio and Agro-Defense Facility in Kansas is among several major building projects in jeopardy after the Obama administration’s 2013 budget was unveiled. The budget would cut all construction spending for the facility.

| Feb 23, 2012

Federal agencies fixed on leasing LEED-certified space

The federal government is especially focused on renting LEED-certified spaces.

| Feb 23, 2012

Regulators investigating construction accident at World Trade Center

The New York Port Authority and the city’s fire and building departments are investigating an accident at the World Trade Center construction site in lower Manhattan after a crane dropped steel beams that fell about 40 stories onto the truck that delivered them.

| Feb 23, 2012

New Virginia statewide building code goes into effect March 1

After March 1, all building plans in Virginia must adhere to the 2009 code that was adopted a year ago.

| Feb 23, 2012

Privatizing flood insurance could lead to new code requirements

One thing that could pave the way toward private flood insurance would be NFIP reforms, like requiring new construction in flood-prone areas to be elevated.

| Feb 22, 2012

ACI BIM manual for cast-in-place concrete in development

The improved communication, coordination, and collaboration afforded by BIM implementation have already been shown to save time and money in projects.

| Feb 20, 2012

Comment period for update to USGBC's LEED Green Building Program now open

This third draft of LEED has been refined to address technical stringency and rigor, measurement and performance tools, and an enhanced user experience.

| Feb 20, 2012

GAF introduces web portal for architects and specifiers

The new portal offers a clean look with minimal clutter to make it easier to find the technical information and product data that architects need.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021