flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Washington University School of Medicine opens one of the world’s largest neuroscience research buildings

University Buildings

Washington University School of Medicine opens one of the world’s largest neuroscience research buildings

The $616 million Jeffrey T. Fort Neuroscience Research Building overcame pandemic-era challenges with early planning, prefabrication, and 3D modeling.


By Novid Parsi, Contributing Editor  | May 30, 2024
In St. Louis’ Cortex Innovation District, Washington University School of Medicine recently opened its new Jeffrey T. Fort Neuroscience Research Building. Photo courtesy McCarthy Building Companies
Photo courtesy McCarthy Building Companies

In St. Louis’ Cortex Innovation District, Washington University School of Medicine recently opened its new Jeffrey T. Fort Neuroscience Research Building.

Designed by CannonDesign and Perkins&Will, the 11-story, 609,000-sf facility is one of the largest neuroscience buildings in the world, according to a statement from McCarthy Building Companies, Inc., the project’s construction manager.

Intended to advance research in areas such as Alzheimer’s disease and brain tumors, the $616 million facility currently accommodates 1,000 faculty and staff members, including 95 research teams. In the future, additional space could be constructed to accommodate an additional 350 faculty and staff members, including about 145 research teams.

The project faced labor and supply chain challenges when construction started in spring 2020, at the beginning of the COVID-19 pandemic. Despite this, the project finished on budget and on schedule. McCarthy attributes this success to effective pre-project planning and the use of lean construction techniques.

“Early collaboration played a pivotal role in the success of this project,” Andy Poirot, vice president and project executive, McCarthy Building Companies, Inc., said in the statement. “We successfully realized the client’s vision, delivering a cutting-edge research facility poised to enhance lives for generations to come.”

Prefabrication and 3D modeling also helped the team overcome the project constraints. About 90% of the mechanical, electrical, and plumbing (MEP) systems were prefabricated and tested before installation onsite. Prefab components both improved quality and reduced the number of onsite professionals needed for MEP installation. The building’s façade, with a unitized curtain wall, also was prefabricated.

In addition to the research building, the facility features a parking structure with 1,846 vehicle spaces as well as bicycle racks and electric vehicle charging stations. A 1,000-ft elevated pedestrian connection spans 360 ft, connecting the new building to an existing parking garage and surrounding structures. The project also includes a two-story, 24,775-sf utility plant.

The project is designed to achieve LEED Gold certification.

On the Building Team:
Owner: Washington University School of Medicine 
Architect of record and structural engineer: CannonDesign
Design architect: Perkins&Will 
MEP engineer: Affiliated Engineers, Inc., with CannonDesign also on mechanicals
Construction manager: McCarthy Building Companies, Inc., partnered with Tarlton Corporation and KAI Enterprises

Related Stories

| May 24, 2018

Accelerate Live! talk: Security and the built environment: Insights from an embassy designer

In this 15-minute talk at BD+C’s Accelerate Live! conference (May 10, 2018, Chicago), embassy designer Tom Jacobs explores ways that provide the needed protection while keeping intact the representational and inspirational qualities of a design.

University Buildings | May 15, 2018

South Dakota State University to receive new apartment and townhouse neighborhood

The units will house juniors, seniors, and graduate students.

Sports and Recreational Facilities | May 15, 2018

Is this the most environmentally sustainable arena in the country?

The university arena was designed by Architectural Resources Cambridge.

Art Galleries | Apr 23, 2018

VCU’s Institute for Contemporary Art officially opens

Steven Holl Architects designed the building.

University Buildings | Apr 19, 2018

University of Minnesota’s Pioneer Hall to receive $104.5 million renovation/addition

The original building was no longer functional for modern day purposes.

boombox1
boombox2
native1

More In Category

Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021