flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

WDMA and AAMA release window, door & skylight market studies

WDMA and AAMA release window, door & skylight market studies

Historic data for 2006 through 2011 and forecast data for 2012 through 2015 are included in the report.


By Posted by Tim Gregorski, Senior Editor | May 8, 2012
This report delivers accurate and timely information on window, door, skylight,
This report delivers accurate and timely information on window, door, skylight, and curtain wall market trends and product relat

The Window and Door Manufacturers Association (WDMA) and the American Architectural Manufacturers Association (AAMA) have jointly released the updated 2011/2012 Study of the U.S. Market for Windows, Doors and Skylights. This report delivers accurate and timely information on window, door, skylight, and curtain wall market trends and product relationships for both residential and commercial construction. Historic data for 2006 through 2011 and forecast data for 2012 through 2015 are also included in the report. Forecasts are based on projections of construction activity as of March 2012.

According to the study's data, the demand for prime windows continued to remain slow in 2011, following housing activity in general, after falling from peak volumes in 2006. The demand for windows in new housing decreased by 2% in 2011 though remains slightly ahead of 2009 levels. Demand in 2012 is expected to increase further as the housing recovery begins to gain momentum. Meanwhile, remodeling and replacement windows fell by nearly 12% versus 2010. In total, the residential window market decreased by 9%.

Residential skylights experienced an increase of 2% from 2010 to 2011. The increase was driven heavily by the continued strength of remodeling and replacement activity, which now represents more than 80% of the residential skylight market. For 2012, the market is expected to grow 6% overall. Forecasts indicate continued growth through 2015.

Little change in the segmentation for interior door material types is expected over the next 5 years.  However, significant volume is expected to return to the entry and interior door market as new construction rebounds.  Further, nonresidential construction declined slightly in 2011, tempering growth in the nonresidential entry and interior door categories. 

Additional and more detailed information on the residential and commercial fenestration markets is contained in the 2011/2012 WDMA/AAMA U.S. Market Studies, which includes all of the items listed below.

  • WDMA/AAMA U.S. Industry Statistical Review and Forecast summarizes residential, non-residential and remodeling trends from government and industry sources.
  • WDMA/AAMA U.S. Industry Channel Distribution Report profiles the residential and non-residential market for windows and doors as it flows through the identified distribution channels.
  • WDMA/AAMA U.S. Industry Market Size Report quantifies residential and non-residential market volumes, both historic and projected.
  • WDMA/AAMA U.S. Industry Regional Statistical Review and Forecasts detail information for 11 individual regions.

The 2011/2012 WDMA/AAMA Study of the U.S. Market for Windows, Doors and Skylights, as well as the other reports listed above, are available for purchase online at the WDMA Bookstore. +

Related Stories

| Dec 7, 2010

Product of the Week: Petersen Aluminum’s column covers used in IBM’S new offices

IBM’s new offices at Dulles Station West in Herndon, Va., utilized Petersen’s PAC-1000 F Flush Series column covers. The columns are within the office’s Mobility Area, which is designed for a mobile workforce looking for quick in-and-out work space. The majority of workspaces in the office are unassigned and intended to be used on a temporary basis.

| Dec 6, 2010

Honeywell survey

Rising energy costs and a tough economic climate have forced the nation’s school districts to defer facility maintenance and delay construction projects, but they have also encouraged districts to pursue green initiatives, according to Honeywell’s second annual “School Energy and Environment Survey.”

| Dec 2, 2010

GKV Architects wins best guest room design award for Park Hyatt Istanbul

Gerner Kronick + Valcarcel, Architects, PC won the prestigious Gold Key Award for Excellence in Hospitality Design for best guest room, Park Hyatt Macka Palas, Istanbul, Turkey. Park Hyatt Maçka Palace marries historic and exotic elements with modern and luxurious, creating a unique space perpetuating Istanbul’s current culture. In addition to the façade restoration, GKV Architects designed 85  guestrooms, five penthouse suites, an ultra-hip rooftop bar, and a first-of-its-kind for Istanbul – a steakhouse, for the luxury  hotel.

| Dec 2, 2010

U.S Energy Secretary Chu announces $21 Million to improve energy use in commercial buildings

U.S. Energy Secretary Steven Chu announced that 24 projects are receiving a total of $21 million in technical assistance to dramatically reduce the energy used in their commercial buildings. This initiative will connect commercial building owners and operators with multidisciplinary teams including researchers at DOE's National Laboratories and private sector building experts. The teams will design, construct, measure, and test low-energy building plans, and will help accelerate the deployment of cost-effective energy-saving measures in commercial buildings across the United States.

| Nov 29, 2010

Data Centers: Keeping Energy, Security in Check

Power consumption for data centers doubled from 2000 and 2006, and it is anticipated to double again by 2011, making these mission-critical facilities the nation’s largest commercial user of electric power. Major technology companies, notably Hewlett-Packard, Cisco Systems, and International Business Machines, are investing heavily in new data centers. HP, which acquired technology services provider EDS in 2008, announced in June that it would be closing many of its older data centers and would be building new, more highly optimized centers around the world.

| Nov 29, 2010

New Design Concepts for Elementary and Secondary Schools

Hard hit by the economy, new construction in the K-12 sector has slowed considerably over the past year. Yet innovation has continued, along with renovations and expansions. Today, Building Teams are showing a keener focus on sustainable design, as well as ways to improve indoor environmental quality (IEQ), daylighting, and low-maintenance finishes such as flooring.

| Nov 29, 2010

Renovating for Sustainability

Motivated by the prospect of increased property values, reduced utility bills, and an interest in jumping on the sustainability bandwagon, a noted upturn in green building upgrades is helping designers and real estate developers stay busy while waiting for the economy to recover. In fact, many of the larger property management outfits have set up teams to undertake projects seeking LEED for Existing Buildings: Operations & Maintenance (LEED-EBOM, also referred to as LEED-EB), a certification by the U.S. Green Building Council.

| Nov 23, 2010

The George W. Bush Presidential Center, which will house the former president’s library

The George W. Bush Presidential Center, which will house the former president’s library and museum, plus the Bush Institute, is aiming for LEED Platinum. The 226,565-sf center, located at Southern Methodist University, in Dallas, was designed by architect Robert A.M. Stern and landscape architect Michael Van Valkenburgh.

| Nov 23, 2010

Honeywell's School Energy and Environment Survey: 68% of districts delayed or eliminated improvements because of economy

Results of Honeywell's second annual “School Energy and Environment Survey” reveal that almost 90% of school leaders see a direct link between the quality and performance of school facilities, and student achievement. However, districts face several obstacles when it comes to keeping their buildings up to date and well maintained. For example, 68% of school districts have either delayed or eliminated building improvements in response to the economic downturn.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021

Â