flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

The Weekly show, Feb 4, 2021: The rise of healthy buildings and human performance

Building Owners

The Weekly show, Feb 4, 2021: The rise of healthy buildings and human performance

The February 4 episode of BD+C's The Weekly is available for viewing on demand. 


By BD+C Staff | February 4, 2021
The Weekly show, Feb 4, 2021: The rise of healthy buildings and human performance sponsored by Sierra Pacific
The Weekly show, Feb 4, 2021: The rise of healthy buildings and human performance sponsored by Sierra Pacific

This week on The Weekly show, BD+C editors speak with AEC industry leaders from Brookfield Properties, NBBJ, and UL about: 
• Healthy buildings certification 
• Improving human performance through research-based design

 

 

THE WEEKLY SHOW HIGHLIGHTS FOR FEBRUARY 4, 2021

BD+C's Group Director Tony Mancini runs down the highlights from this week's show.

 

 

 

SEGMENT #1

Make your buildings healthier
BD+C Executive Editor Rob Cassidy engages with Robert Cushman and Brian Pagac of Brookfield Properties, and Sean McCrady of UL IEQ Testing + Advisory Services, on the why and how of Brookfield's involvement with UL's "Verified Healthy Buildings" certification program.

 

 

 

SEGMENT #2

Better human performance through research-based design
BD+C Senior Editor John Caulfield interviews Kelly Farrell, the former president and CEO of CallisonRTKL, who recently joined New York-based NBBJ as Corporate and Commercial Practice Director. Farrell talks about her decision to make a high-profile job switch, and about her new firm's commitment to creating healthy environments and its expansion plans for the East Coast.

 

 

 

WATCH ‘THE WEEKLY’ EVERY THURSDAY AT 1 PM EASTERN

“The Weekly” is a presentation of Horizon TV, the online broadcast arm of SGC Horizon LLC, publishers of Building Design+Construction, Multifamily Design+Construction, Professional Builder, ProRemodeler, and Construction Equipment.

 

The Weekly premieres May 18 on Horizon TV

Related Stories

Sponsored | | Mar 10, 2014

A high-performance barn

Bastoni Vineyards replaces a wooden barn with an efficient metal building used for maintenance, storage, and hosting events.

| Mar 10, 2014

Field tested: Caterpillar’s Cat B15 rugged smartphone

The B15 is billed by Cat as “the most progressive, durable and rugged device available on the market today.” 

| Mar 10, 2014

5 rugged mobile devices geared for construction pros

BD+C readers share their most trusted smartphone and tablet cases. The editors select some of their faves, too. 

| Mar 7, 2014

Thom Mayne's high-tech Emerson College LA campus opens in Hollywood [slideshow]

The $85 million, 10-story vertical campus takes the shape of a massive, shimmering aircraft hangar, housing a sculptural, glass-and-aluminum base building.

| Mar 6, 2014

BD+C wants to hear about your breakthrough ideas and projects for the Giants 300 report

BD+C's 2014 Giants 300 survey form is now available. But completing the survey is just one way to participate in the July Giants issue. 

| Mar 6, 2014

Must see: Tour Seinfeld's apartment with virtual reality headset

Fans of the show can now explore a virtual 3D model of the iconic New York residence, thanks to one Web designer's painstaking effort.

| Mar 5, 2014

5 tile design trends for 2014

Beveled, geometric, and high-tech patterns are among the hot ceramic tile trends, say tile design experts.

| Mar 4, 2014

How EIFS came to America

Design experts from Hoffmann Architects offer a brief history of exterior insulation and finish systems in the U.S.

| Mar 4, 2014

If there’s no ‘STEM crisis,’ why build more STEM schools?

Before you get your shorts in a knot, I have nothing against science, technology, engineering, or even mathematics; to the contrary, I love all four “STEM” disciplines (I’m lying about the math). But I question whether we need to be building K-12 schools that overly emphasize or are totally devoted to STEM.

| Mar 3, 2014

Engineering and construction CEOs are cautiously optimistic about the global economy, says PwC

Firm leaders remain leery about the availability of skilled workers, the state of government debt and deficits, and rising material prices, according to PwC’s 2014 Global CEO Survey.

boombox1
boombox2
native1

More In Category

Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021