flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

The Weekly show, Feb 4, 2021: The rise of healthy buildings and human performance

Building Owners

The Weekly show, Feb 4, 2021: The rise of healthy buildings and human performance

The February 4 episode of BD+C's The Weekly is available for viewing on demand. 


By BD+C Staff | February 4, 2021
The Weekly show, Feb 4, 2021: The rise of healthy buildings and human performance sponsored by Sierra Pacific
The Weekly show, Feb 4, 2021: The rise of healthy buildings and human performance sponsored by Sierra Pacific

This week on The Weekly show, BD+C editors speak with AEC industry leaders from Brookfield Properties, NBBJ, and UL about: 
• Healthy buildings certification 
• Improving human performance through research-based design

 

 

THE WEEKLY SHOW HIGHLIGHTS FOR FEBRUARY 4, 2021

BD+C's Group Director Tony Mancini runs down the highlights from this week's show.

 

 

 

SEGMENT #1

Make your buildings healthier
BD+C Executive Editor Rob Cassidy engages with Robert Cushman and Brian Pagac of Brookfield Properties, and Sean McCrady of UL IEQ Testing + Advisory Services, on the why and how of Brookfield's involvement with UL's "Verified Healthy Buildings" certification program.

 

 

 

SEGMENT #2

Better human performance through research-based design
BD+C Senior Editor John Caulfield interviews Kelly Farrell, the former president and CEO of CallisonRTKL, who recently joined New York-based NBBJ as Corporate and Commercial Practice Director. Farrell talks about her decision to make a high-profile job switch, and about her new firm's commitment to creating healthy environments and its expansion plans for the East Coast.

 

 

 

WATCH ‘THE WEEKLY’ EVERY THURSDAY AT 1 PM EASTERN

“The Weekly” is a presentation of Horizon TV, the online broadcast arm of SGC Horizon LLC, publishers of Building Design+Construction, Multifamily Design+Construction, Professional Builder, ProRemodeler, and Construction Equipment.

 

The Weekly premieres May 18 on Horizon TV

Related Stories

| Sep 12, 2011

LACCD’s $6 billion BIM connection

 The Los Angeles Community College District requires every design-build team in its massive modernization program to use BIM, but what they do with their 3D data after construction is completed may be the most important change to business as usual.

| Sep 12, 2011

Construction waste management

Best practices for an environmentally optimized job site.

| Sep 12, 2011

PVs play new roles as a teaching tool

Solar installations are helping K-12 schools around the country save money and teach students the intricacies of renewable energy sources.

| Sep 12, 2011

Living Buildings: Are AEC Firms up to the Challenge?

Modular Architecture > You’ve done a LEED Gold or two, maybe even a LEED Platinum. But are you and your firm ready to take on the Living Building Challenge? Think twice before you say yes.

| Sep 12, 2011

First phase of plan to revitalize Florida's Hialeah Park announced

This is the first project of a master plan developed to revive the historic racetrack. 

| Sep 12, 2011

Geist opens European branch

The new branch provides the company’s international clients with additional support and services.

| Sep 9, 2011

$22 million investment made in energy efficient building maker

The buildings use at least 25% less energy than the strictest building codes in the U.S., and as much as 80% less energy in certain parts of the country. 

| Sep 9, 2011

Hardinger joins Ryan Companies as vice president, mission critical

He will lead the Ryan team responsible for building and developing data centers and other mission-critical projects, and will oversee business development, client relationships, executive level communications and overall marketing strategies for the division.

| Sep 7, 2011

KSS Architects wins AIA NJ design award

The project was one of three to win the award in the category of Architectural/Non-Residential. 

| Sep 6, 2011

Construction on Beijing's tallest building starts next week

The 108 floor mixed-use skyscraper consists of offices, apartments, hotels and shopping malls on the lower floors.

boombox1
boombox2
native1

More In Category

Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021