flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

The Weekly show: The future of medical office buildings, and virtual internship programs

Healthcare Facilities

The Weekly show: The future of medical office buildings, and virtual internship programs

The December 10 episode of BD+C's The Weekly is available for viewing on demand.


By BD+C Staff | December 10, 2020
The Weekly show, Dec 10, 2020: The future of medical office buildings, and virtual internship programs
The Weekly show, Dec 10, 2020: The future of medical office buildings, and virtual internship programs

This week on The Weekly show, BD+C editors spoke with leaders from SMRT Architects and Engineers and Stantec about: 
• The future of medical office buildings
• Virtual internship programs

 

 

THE WEEKLY SHOW HIGHLIGHTS FOR DECEMBER 10, 2020

BD+C's Group Director Tony Mancini runs down the highlights from this week's show.

 

 

SEGMENT #1

Stantec Virtual Internship Program 2020
BD+C's Robert Cassidy interviews representatives of global architecture/engineering firm Stantec about the firm's "2020 virtual internship program." The Summer 2020 program involved 23 interns from 13 cities in the U.S. and Canada, across four technical disciplines, working in multidisciplinary teams on specific projects for pro bono clients. Two interns, Melissa Dosne and Cole Von Feldt, describe the work of their teams on designing an environmental center for "Artist Boat," an environmental advocacy organization in Galveston, Texas. Interns were also treated to weekly lectures/discussion with top experts from Stantec. The takeaways from the experience: 1) "Getting to be in touch with such talented professionals at Stantec" (Cole Von Feldt); 2) "Having the opportunity to work with interns from other Stantec offices, not just the Ottawa office, thanks to the virtual format" (Melissa Dosne); and 3) "Getting so energized with these young people" (Samantha Markham).

 

 

SEGMENT #2

Winning back patients' confidence in medical office buildings
BD+C's John Caulfield interviews Derek Veilleux, AIA, EDAC, NCARB, Principal with SMRT Architects and Engineers and leader of the firm's health and wellness practice. The focus of the discussion is on how medical office buildings can assuage patient and staff anxieties about safety. His firm's suggestions include greater reliance on curbside services, rethinking how waiting rooms are set up, and even allowing a degree of “self rooming” by patients and staff.

 

 

WATCH ‘THE WEEKLY’ EVERY THURSDAY AT 1 PM EASTERN

“The Weekly” is a presentation of Horizon TV, the online broadcast arm of SGC Horizon LLC, publishers of Building Design+Construction, Multifamily Design+Construction, Professional Builder, ProRemodeler, and Construction Equipment.

 

The Weekly premieres May 18 on Horizon TV

Related Stories

Healthcare Facilities | Feb 6, 2017

NYC cancer hospital rises to the occasion

A recent analysis of patient volumes showed that Memorial Sloan Kettering Cancer Center would run out of space for new construction at its Upper East Side campus in Manhattan in just a few years.

Healthcare Facilities | Feb 3, 2017

Urgent care centers: True pioneers of retail healthcare delivery

Hospitals, either individually or in joint ventures, run 37% of U.S. urgent care centers.

Healthcare Facilities | Jan 19, 2017

A survey challenges the efficacy of decentralized nurses station design

The Institute of Health + Wellness Design at the University of Kansas raised questions after reviewing a hospital’s renovated orthopedic unit.

Healthcare Facilities | Dec 22, 2016

Has ‘green’ delivered on its promise to the healthcare sector?

As we approach the end of the second decade of LEED, the financial costs and benefits of going green are well documented, write CBRE's Lee Williams and Steve Higgs.

Healthcare Facilities | Dec 13, 2016

How healthcare systems can reduce financial risk with developer-owned hospitals

When entering a new market, the financial risk can be magnified to the point that the investment – although critical to a system’s future – becomes unpalatable to a governing board.

Sponsored | Flooring | Dec 7, 2016

Reading Hospital expansion project saves two months in construction schedule thanks to nora nTx

Construction delays are common with projects as large as the $354 million Reading Hospital expansion. Maybe that’s why construction manager Jeff Hutwelker, project executive with LF Driscoll Co., LLC, was so pleased with his nora® experience. By Hutwelker’s estimates, nora nTx saved approximately two months in his construction schedule.

Healthcare Facilities | Nov 30, 2016

Utilizing real estate to build physician networks

How hospitals can partner with their doctors to build an ambulatory network.

Healthcare Facilities | Nov 10, 2016

Prescription for success: Managing technology in the design of healthcare facilities

While the benefits of intelligently deployed technology are abundantly clear to both designers and healthcare end-users, it’s no simple task to manage the integration of technology into a building program.

Public Health Labs | Nov 3, 2016

Cutting-edge microscope facility opens on UMass Medical’s campus

Design and construction met rigorous requirements for sound, vibration, and temperature controls.

Healthcare Facilities | Oct 31, 2016

A world unbuilt: The moral implications of design

The communications challenges don’t even begin to compare to the inherent challenges of designing for a developing nation, writes CannonDesign's Michael McManus.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021