flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

What you missed: Top construction market news for the week of September 15

What you missed: Top construction market news for the week of September 15

Construction market news was mostly positive last week, with the AIA, AGC, and Census Bureau all seeing an uptick in key metrics.


By BD+C Staff | September 23, 2013

Construction market news was mostly positive last week, with the AIA, AGC, and Census Bureau all seeing an uptick in key metrics. Here's a recap of the top construction market news for the week of September 15, 2013:

 

 

 

CONSTRUCTION SPENDING HITS FOUR-YEAR HIGH IN JULY

According an Associated General Contractors of America analysis of July Census Bureau data, single and multifamily residential spending have been strong, with hospitality, warehouses, and power infrastructure among the hot nonresidential categories. http://www.bdcnetwork.com/construction-spending-hits-four-year-high-july-agc-report

 

AUGUST HOUSING STARTS REVEAL MULTIFAMILY STILL HEALTHY BUT SINGLE-FAMILY STAGNATING

As analyzed by Auction.com Research, Census Bureau stats for August provided a bit of contrast from the report mentioned above, with single family starting to lag but multifamily remaining at "healthy levels." http://www.bdcnetwork.com/august-housing-starts-reveal-multifamily-still-healthy-single-family-stagnating

 

AIA SEES UPTICK IN ARCHITECTURE BILLINGS FOR AUGUST

Monthly ABI was 53.8, up from 52.7 in July (any score above 50 indicates an increase in billings). The number has improved in eleven of the past twelve months. http://www.bdcnetwork.com/aia-sees-uptick-architecture-billings-august

 

U.S. ROOFING DEMAND PREDICTED TO RISE, DRIVEN BY NEW CONSTRUCTION

Aside from asphalt shingles (mostly a residential product), favorable categories include roofing tile, plastics, and metal roofing products. http://www.bdcnetwork.com/us-roofing-demand-predicted-rise-driven-new-construction

 

43% OF ENERGY LEADERS WILL INVEST MORE IN EFFICIENCY NEXT YEAR

Schneider Electric survey includes responses from people in the business and government sectors. Tracking and analyzing energy-use data and energy audits were the most popular energy management approaches; building automation, efficient lighting, and data center efficiency are mentioned as growth areas. http://www.bdcnetwork.com/forty-three-percent-energy-leaders-will-invest-more-efficiency-next-year-infographic-0

 

BIG PROJECTS OF NOTE:

* World's first "invisible" tower planned for Seoul, South Korea. "Cloaking" facade made of LED projectors and optical cameras will render the building transparent if desired. http://www.bdcnetwork.com/worlds-first-invisible-tower-planned-south-korea

* BIG and MVVA collaborate on proposal for Pier 6 development at Brooklyn Bridge Park. http://www.bdcnetwork.com/first-look-bigmvva-proposal-pier-6-brooklyn-bridge-park

* Suffolk Downs announces plan to build $1 billion "green" casino in Boston. http://www.bdcnetwork.com/proposed-boston-casino-development-approval-will-depend-partly-sustainability

Related Stories

| Nov 1, 2010

John Pearce: First thing I tell designers: Do your homework!

John Pearce, FAIA, University Architect at Duke University, Durham, N.C., tells BD+C’s Robert Cassidy  about the school’s construction plans and sustainability efforts, how to land work at Duke, and why he’s proceeding with caution when it comes to BIM.

| Nov 1, 2010

Vancouver’s former Olympic Village shoots for Gold

The first tenants of the Millennium Water development in Vancouver, B.C., were Olympic athletes competing in the 2010 Winter Games. Now the former Olympic Village, located on a 17-acre brownfield site, is being transformed into a residential neighborhood targeting LEED ND Gold. The buildings are expected to consume 30-70% less energy than comparable structures.

| Oct 27, 2010

Grid-neutral education complex to serve students, community

MVE Institutional designed the Downtown Educational Complex in Oakland, Calif., to serve as an educational facility, community center, and grid-neutral green building. The 123,000-sf complex, now under construction on a 5.5-acre site in the city’s Lake Merritt neighborhood, will be built in two phases, the first expected to be completed in spring 2012 and the second in fall 2014.

| Oct 21, 2010

GSA confirms new LEED Gold requirement

The General Services Administration has increased its sustainability requirements and now mandates LEED Gold for its projects.

| Oct 18, 2010

World’s first zero-carbon city on track in Abu Dhabi

Masdar City, the world’s only zero-carbon city, is on track to be built in Abu Dhabi, with completion expected as early as 2020. Foster + Partners developed the $22 billion city’s master plan, with Adrian Smith + Gordon Gill Architecture, Aedas, and Lava Architects designing buildings for the project’s first phase, which is on track to be ready for occupancy by 2015.

| Oct 13, 2010

Editorial

The AEC industry shares a widespread obsession with the new. New is fresh. New is youthful. New is cool. But “old” or “slightly used” can be financially profitable and professionally rewarding, too.

| Oct 13, 2010

Test run on the HP Z200 SFF Good Value in a Small Package

Contributing Editor Jeff Yoders tests a new small-form factor, workstation-class desktop in Hewlett-Packard’s line that combines performance of its minitower machine with a smaller chassis and a lower price.

| Oct 13, 2010

Prefab Trailblazer

The $137 million, 12-story, 500,000-sf Miami Valley Hospital cardiac center, Dayton, Ohio, is the first major hospital project in the U.S. to have made extensive use of prefabricated components in its design and construction.

| Oct 13, 2010

Thought Leader

Sundra L. Ryce, President and CEO of SLR Contracting & Service Company, Buffalo, N.Y., talks about her firm’s success in new construction, renovation, CM, and design-build projects for the Navy, Air Force, and Buffalo Public Schools.

boombox1
boombox2
native1

More In Category

Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021