flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Willis Tower elevators receive upgrade as part of $500 million update

Reconstruction & Renovation

Willis Tower elevators receive upgrade as part of $500 million update

Otis will handle the upgrades.


By David Malone, Associate Editor | May 8, 2018
The Willis Tower in Chicago
The Willis Tower in Chicago

The Willis Tower is in the midst of a massive renovation project to update the iconic skyscraper. As part of that project, the building’s 83 elevators and 97 passenger cabs, including their respective machine rooms, motors, cables, and controls, will be updated by Otis.

The Willis Tower elevator system makes over 46,000 daily trips and serves about 5.8 million people each year (over 15,000 per day). The modernization project will reduce travel time during peak hours by up to 30% and cut energy costs by an estimated 35%.

 

See Also: $500 million investment will modernize Chicago’s Willis Tower

 

Otis and Equity Office finalized a contract to upgrade the building’s elevator cabs to Otis SkyRise units using the CompassPlus destination management system. The CompassPlus system organizes traffic flow and sorts passengers into each elevator based on their destinations to get people where they are going faster than conventional dispatching systems.

The upgrades on the elevators will begin in June. As part of the contract, Otis will provide maintenance service for the elevators for 10 years.

 

Related Stories

| Apr 3, 2012

Blaine Brownell on innovative materials applications in architecture

Brownell, who was named a BD+C 40 Under 40 in 2006, provides insight regarding emerging material trends and the creative implementation of materials.

| Mar 12, 2012

Improving the performance of existing commercial buildings: the chemistry of sustainable construction

Retrofitting our existing commercial buildings is one of the key steps to overcoming the economic and environmental challenges we face.

| Mar 6, 2012

Joliet Junior College achieves LEED Gold

With construction managed by Gilbane Building Company, Joliet Junior College’s Facility Services Building combines high-performance technologies with sustainable materials to meet aggressive energy efficiency goals.

| Mar 1, 2012

Reconstruction of L.A.’s Dunbar Hotel underway

Withee Malcolm Architects’ designs for the project include the complete renovation of the Dunbar Hotel and the Somerville Apartments I and II.

| Feb 26, 2012

Milwaukee U-Haul facility receives LEED-CI Silver

The new elements of the facility now include: efficient lighting with day-lighting controls and occupancy sensors, a high-efficiency HVAC system used in conjunction with a newly constructed thermal envelope to help reduce energy consumption, and the installation of low-flow fixtures to reduce water consumption.

boombox1
boombox2
native1

More In Category

Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.



Brick and Masonry

A journey through masonry reclad litigation

This blog post by Walter P Moore's Mallory Buckley, RRO, PE, BECxP + CxA+BE, and Bob Hancock, MBA, JD, of Munsch Hardt Kopf & Harr PC, explains the importance of documentation, correspondence between parties, and supporting the claims for a Plaintiff-party, while facilitating continuous use of the facility, on construction litigation projects.


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021