flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Winning with teamwork

Building Team Awards

Winning with teamwork

The new home of the NBA’s Golden State Warriors, Chase Center, is honored with a Gold Award in the 2020 Building Team Awards.


By John Caulfield, Senior Editor | October 20, 2020

The $1.4 billion Chase Center in San Francisco sits on 11 acres and encompasses an arena, broadcast studio, retail stores, two office buildings, plazas and an underground parking garage. The complex will soon add a hotel. Photos: Jason O'Rear/Chase Center

Chase Center, home to the Golden State Warriors professional basketball team, exemplifies the centrality of technology, sustainability, community involvement, and building team coordination in the design, engineering, and construction of a modern-day sports venue.

The centerpiece of this 2-million-sf complex, located on 11 acres in San Francisco’s Mission Bay district, is an arena with a flexible seating bowl that can accommodate 18,000 Warriors fans or scale down to a 5,000-seat theater. The complex also includes two office buildings, publicly accessible plazas, a broadcast studio, over 20 retail locations, and a 925-slot below-grade parking structure. The complex is programmed to host over 200 entertainment events per year. A hotel is under construction on the arena’s north side.

This project required 18 months of preconstruction planning, and more than 100 community meetings. Its construction posed logistical challenges, as the site was hemmed in by the San Francisco Bay to the east, UCSF Medical Center’s academic housing to the west, and active construction sites to the north and south. Some 300,000 cubic yards of soil were excavated from the site, and because the site sits so close to Bay, the Building Team held back groundwater intrusion with the installation of H-pile and CDSM cutoff walls, and 1,700 tiebacks.  

The construction of the building’s four structural cores was sequenced. The Building Team used a 4D Synchro model that transformed the project’s 36,000-activity P6 schedule into a visual tool that provided a platform to develop, test, and resolve schedule outcomes throughout the lifecycle of the construction process.

 

Chase Center 4D model aerial viewMortenson Clark, the joint venture construction manager on this project, deployed a 4D Synchro model that transformed the 36,000-activity schedule into a visual tool that helped the Building Team communicate its intentions with stakeholders.

 

Model coordination meetings involved more than 40 people, and the project’s 31-month schedule was guided by a 200-page “playbook” that detailed every facet of construction. The Building Team also leveraged Virtual Reality to conduct virtual walkthroughs to identify any discrepancies between design coordination and the client’s expectations.

(This project earned a Bentley Systems YII 2019 Award for Advancements in 4D Construction Modeling, and an Autodesk 2019 AEC Excellence Award.)

One of the signature features of Chase Center is its rainscreen enclosure, a massive puzzle of 5,500 aluminum panels that encircle the arena in 14 “drums”—individual bands that ring the venue at different planes. These 3x8-ft panels are affixed to 950 24x8-ft mega panels that are secured to a secondary steel framework. 

The Building Team harnessed advanced modeling tools, including Rhino and Catia, to improve constructability, coordination, and ensure each panel was precisely designed, fabricated, and installed. (The panels’ tolerances were only one-eighth of an inch.)

Offsite prefabrication of the mega panels allowed for greater quality control and speedier installation.

The Building Team and client went to great lengths to ensure worker safety on what was a long and complicated construction effort. Some 9,800 workers from 260 firms put in 5.3 million hours on this project, including the 1,500 workers on site during peak construction periods. 

 

Chase Center Metal panel skinChase Center’s façade consists of a rainscreen enclosure of 5,500 aluminum panels whose installation allowed for only 1/8-inch tolerance.

 

The project entailed five crane towers, two crawler cranes, and dozens of boom lifts. Concrete subcontractors placed as much as 3,000 cubic yards per week, and ironworkers set 17,000 tons of steel over nine months.

All told, Chase Center put in place nearly $600 million in work per year of construction, and its recordable accident incident rate of 0.53 was six times lower than the industry’s average.

To help track its safety performance, the team relied on a Safety Dashboard that focused on safety observations from the prior day, near misses, violations, and outstanding pre-task plans and worker headcounts. There were 700-plus daily “Plan of the Day” meetings between project field leads and foremen.

“Mortenson|Clark and our partners worked together to build a culture on site that fostered productivity and collaboration,” recalls Trevor DeLong, the joint venture’s senior superintendent. “It was an extraordinary team effort.”

This complex is expected to contribute significantly to San Francisco’s economy. The Building Team worked in close partnership with the Warriors and representatives with San Francisco’s Office of Economic and Workforce Development and Bay Area labor unions. The team made a point to ensure that local entities played a meaningful role in the building process. To that end, $245 million in construction contracts for Chase Center were awarded to small businesses.

Additionally, the Building Team secured 574 San Francisco resident job placements.

The Building Team also helped 77 San Franciscans begin new construction careers through Chase Center Training Program; this was the first public-private partnership for the area’s construction sector workforce training agency. Forty eight graduates of that program were placed in job opportunities on the arena project.

“The real measure of success is the lasting positive impact we have on our communities, and we couldn’t be more proud of the outcome and legacy we are leaving behind,” says Viki Bamba Chennault, Community Affairs Director for Clark Construction Group.

 

Nearly 10,000 men and women worked on this project overall. Yet, its 0.53 incident rate was six times lower than the industry’s average. 

 

Chase Center’s Building Team also looked to advance the client’s sustainability goals. For example, repurposing waste was a top priority. The team recycled 87% of the project’s construction waste locally, diverting it from landfills. To protect migratory fowl, the team installed fritted glass in the upper locations of the arena. It also installed noise, crack, and vibration monitoring systems to scrutinize the impact of the construction on the surrounding built environment, as well as dust monitoring and controls for air quality during construction.  

The building itself features premium finishes, luxury suites whose leases start at $1.5 million, area clubs, a scalable rigging system, and cutting-edge audio-visual technology that is highlighted by a 10,000-sf center-court scoreboard that amasses of more than 25 million LED lights.

The Warriors organization—which funded this project privately—has $2 billion under contract from the sale of tickets, suites and corporate sponsorships from a cluster of founding partners such as tech giants Adobe, Oracle, Google Cloud, Accenture. JPMorgan Chase alone shelled out a reported $300 million to snag the naming rights to the stadium for 20 years. Essential revenue is also being generated by the office towers whose primary tenant is Uber.

 

Submitting firm: Clark Construction Group
GC/CM: Mortenson|Clark, a Joint Venture
Owner/developer: Golden State Warriors
Architect: MANICA
AOR: Kendall Heaton
Interior Architect: Gensler
Structural Engineer: Magnusson Klemencic Associates
MEP Engineer Smith Seckman Reid
ME: ACCO Engineered Systems
EE: Rosendin Electric
PE: Pan Pacific
Size: 2 million sf
Construction time January 2017 to August 2019
Cost $1.4 billion
Delivery method CM at Risk
Photo credit: Jason O’Rear/Chase Center

Related Stories

Building Team Awards | Jun 21, 2019

Up, up and away: Dutch hospitality chain completes the world's tallest modular hotel

Honorable mention: At 21 stories (15 of them modular), it is the world’s tallest modular hotel.

Building Team Awards | Jun 20, 2019

PPP gets the job done: Three-party deal saves time and money for client

Bronze Award: Weitz, acting as developer and design-builder, leased the land and borrowed the money for the project.

Building Team Awards | Jun 20, 2019

Making waves: The façade of Pacific Visions suggests the movement of water, day and night

Bronze Award: The new wing holds an exhibition space, a state-of-the-art 300-seat theater with a 32-foot-tall, 180-degree arc, 130-foot-long projection wall.

Building Team Awards | Jun 19, 2019

Unsung heroes: Two hurricanes couldn't stop this project team

Bronze Award: St. Lucie County’s population exploded to the point where the hospital needed lots more space.

Building Team Awards | Jun 19, 2019

Crime fighter: San Diego County's new forensic facility helps battle crime in three ways

Silver Award: The 158,000-sf addition collocates three crime-fighting functions.

Building Team Awards | Jun 18, 2019

Eyesore no more: People come together to expand a much-needed daycare center

Silver Award: Two problems quickly emerged: high concentrations of arsenic in the soil, and stormwater runoff into nearby wetlands and neighboring properties.

Building Team Awards | Jun 17, 2019

Campus renewal: Community effort saves a crucial healthcare resource

Silver Award: Taylor Design (architect) and SmithGroup (AOR) led an integrated design-build team anchored by McCarthy Building Companies (GC).

Building Team Awards | Jun 13, 2019

In the spotlight: Kinder High School for the Performing and Visual Arts shines a new beacon on Houston’s downtown

Gold Award: Kinder High School, which can accommodate 750 9th through 12th graders, is one of only three public schools in the U.S. that offer programs for both visual and performing arts.

Building Team Awards | Jun 12, 2019

Delectable design: A traditional French pastry was the concept behind the Krause Gateway Center

Gold Award: Krause Gateway Center’s striking design takes its cue from the traditional French dessert mille feuille.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021