Connect, create, and learn from a network of female industry changemakers just like you at the 2024 Women in Residential+Commercial Construction Conference (WIR+CC) in Phoenix, hosted by Building Design+Construction, Pro Builder, Pro Remodeler, and Furniture, Lighting and Decor.
The annual conference gathers 300+ women in construction for three transformative and education-rich days packed with industry speakers, AIA-accredited sessions, breakout education tracks, roundtable discussions, panels, and networking events.
Surround yourself with some of the top female leaders in construction to learn from and bring back valuable approaches, insights, and takeaways to your business. Build your own experience and get the best of both worlds from residential and commercial designated tracks, and avail yourself of opportunities to learn from women in every segment of the industry during group sessions.
The agenda for the conference is now set. Speaker highlights include:
- Lessons and Action Steps from Women in the AEC C-Suite (Mia Blanchett, CEO, HGA; Wendy Cohen, President, CEO, Kitchell Corporation; Shannon Coomes, President, Hill Fire Protection)
- How To Develop A-List Talent at AEC Firms (Danielle Feroleto, Small Giants)
- How To Become a Change Agent For Your Teams and At Your Firm (TBA)
- Doing Delegation Right (Julie Miller Davis, JMD Productivity Training)
- Creating A Personal Vision of Greatness (Elnian Gilbert, ZingTrain)
- Continuing the Journey: Engaging, Reflecting, and Networking Beyond the Conference (Camille Jenkins, Camille's Keys LLC)
- Mastering Work-Life Balance: How to Manage Career Pressure Points - Job Relocations, Jobsite Visits, Major Project Meetings (Maria Alvarado, PCL Construction)
- The Art of Persuasive Storytelling (Kelly Parker, KDP Consulting, LLC)
- How to Thrive While Standing at the Edge of What You Know (Allison Iantosca, CEO, F.H. Perry Builder)
- Foolproof Frameworks for Presenting Innovative Ideas & Leading Meetings (Maisha Christian, Beauty & the Boss)
- The J.E.D.I. Agenda: An Intersectional Approach to Designing a Just Future (Rosa Sheng, SmithGroup, Equity By Design)
- The Current and Future State of Women in AEC (panel TBA)
- ALSO: Networking receptions, peer-to-peer networking lunch, and the chance to earn up to 8 AIA Learning Units.
More information at: https://www.womensconstructionconference.com/2024
Related Stories
| Aug 11, 2010
Decline expected as healthcare slows, but hospital work will remain steady
The once steady 10% growth rate in healthcare construction spending has slowed, but hasn't entirely stopped. Spending is currently 1.7% higher than the same time last year when construction materials costs were 8% higher. The 2.5% monthly jobsite spending decline since last fall is consistent with the decline in materials costs.
| Aug 11, 2010
Construction under way on LEED Platinum DOE energy lab
Centennial, Colo.-based Haselden Construction has topped out the $64 million Research Support Facilities, located on the U.S. Department of Energy’s National Renewable Energy Laboratory (NREL) campus in Golden, Colo. Designed by RNL and Stantec to achieve LEED Platinum certification and net zero energy performance, the 218,000-sf facility will feature natural ventilation through operable ...
| Aug 11, 2010
NASA plans federal government's greenest building
NASA is set to break ground on what the agency expects to be the highest-performing building in the federal government's portfolio. Named Sustainability Base, the building at Ames Research Center in Sunnyvale, Calif., will be a showplace for sustainable technologies, featuring some of the agency's most advanced recycling and intelligent controls technologies originally developed to support NASA...
| Aug 11, 2010
Luxury Hotel required faceted design
Goettsch Partners, Chicago, designed a new five-star, 214-room hotel for the King Abdullah Financial District (KAFD) in Riyadh, Saudi Arabia. The design-build project, with Saudi Oger Ltd. as contractor and Rayadah Investment Co. as developer, has a three-story podium supporting a 17-story glass tower with a nine-story opening that allows light to penetrate the mass of the building.
| Aug 11, 2010
Stimulus funding helps get NOAA project off the ground
The award-winning design for the National Oceanic and Atmospheric Administration’s new Southwest Fisheries Science Center replacement laboratory saw its first sign of movement last month with a groundbreaking ceremony held in La Jolla, Calif. The $102 million project is funded primarily by the American Recovery and Reinvestment Act.
| Aug 11, 2010
National Intrepid Center tops out at Walter Reed
SmithGroup, Turner Construction, and the Intrepid Fallen Heroes Fund (IFHF), a nonprofit organization supporting the men and women of the United States Armed Forces and their families, celebrated the overall structural completion of the National Intrepid Center of Excellence (NICoE), an advanced facility dedicated to research, diagnosis, and treatment of military personnel and veterans sufferin...
| Aug 11, 2010
Three Schools checking into L.A.'s Ambassador Hotel site
Pasadena-based Gonzalez Goodale Architects is designing three new schools for Los Angeles Unified School District's Central Wilshire District. The $400 million campus, located on the site of the former Ambassador Hotel, will house a K-5 elementary school, a middle school, a high school, a shared recreation facility (including soccer field, 25-meter swimming pool, two gymnasiums), and a new publ...
| Aug 11, 2010
Robotic storage facility protects exotic automobiles, fine wines, artwork
Miller Construction Company, Fort Lauderdale, Fla., has completed construction on a high-tech robotic storage facility designed to store and protect valued possessions such as exotic automobiles, fine wines, artwork, and jewelry. Designed and built to resist Category 5 hurricanes, the RoboVault facility features automated storage retrieval, biometric recognition, private access with 24/7 securi...
| Aug 11, 2010
Curtain rises on Broadway's first green theater
The Durst Organization and Bank of America have opened New York's first LEED-certified theater, the 1,055-seat Henry Miller's Theatre. Located inside the new 55-story Bank of America Tower at One Bryant Park, the 50,000-sf theater is located behind the preserved and restored neo-Georgian façade of the original 1918 theater.
| Aug 11, 2010
New Jersey's high-tech landscaping facility
Designed to enhance the use of science and technology in Bergen County Special Services' landscaping programs, the new single-story facility at the technical school's Paramus campus will have 7,950 sf of classroom space, a 1,000-sf greenhouse (able to replicate different environments, such as rainforest, desert, forest, and tundra), and 5,000 sf of outside landscaping and gardening space.