The new Denver headquarters for Shinesty, a party clothing company, was designed to match the brand’s fun image with an iconic array of colors, textures, and prints curated by the design agency, Maximalist. Shinesty’s mission, to challenge the world to live more freely and “take itself less seriously,” is embodied throughout the office interior.
Bold, monochromatic colors combine with copious amounts of textures and prints to showcase the company’s eclectic and over-the-top personality. Space vignettes include a sunglass portal, cabanas, communal workspaces, phone booths, photo studios, hot tropic conference room, conversation pits, and boardroom decked out with a bar. The space features high-end lighting to create a residential feel, and bold carpet color choices transport you to a new scene and vibe.
Each room has distinct personality and flare. The “Pink Panther Room,” a small room for private phone calls (or naps), is fitted with a pink Tom Dixon light fixture, a pink side table next to a pink armchair—all surrounded by fuzzy pink walls. Across the hall, a conference room, coined the “Music Studio,” is resplendent in full monochromatic purple. Lilac swivel chairs surrounding a purple table are set in front of purple foam to aid acoustic quality. Encouraging a playful, fun, and energetic atmosphere, the two wild rooms play off of each other.
Other standout spaces include a green conversation pit lounge, a banana-themed yellow kitchen, and a striking red conference room. The Boardroom is one of the larger rooms, featuring a plethora of open-seating and a full bar. Shinesty executives wanted the staff to feel comfortable coming back to the office after hours and to be able to host parties in the space. The paint color, called “Royal Liqueur” by Behr, is on point for this imbibing setting.
The 5,217-sf space was completed at a reasonable total cost of $200,000-$250,000 with a construction budget of about $110,600.
X-Colo Design Build was the GC on the project.
Related Stories
Office Buildings | Oct 29, 2024
Editorial call for Office Building project case studies
BD+C editors are looking to feature a roundup of office building projects for 2024, including office-to-residential conversions. Deadline for submission: December 6, 2024.
Office Buildings | Oct 21, 2024
3 surprises impacting the return to the office
This blog series exploring Gensler's Workplace Survey shows the top three surprises uncovered in the return to the office.
Office Buildings | Sep 6, 2024
Fact sheet outlines benefits, challenges of thermal energy storage for commercial buildings
A U.S. Dept. of Energy document discusses the benefits and challenges of thermal energy storage for commercial buildings. The document explains how the various types of thermal energy storage technologies work, where their installation is most beneficial, and some practical considerations around installations.
Office Buildings | Sep 5, 2024
Office space downsizing trend appears to be past peak
The office downsizing trend may be past its peak, according to a CBRE survey of 225 companies with offices in the U.S., Canada, and Latin America. Just 37% of companies plan to shrink their office space this year compared to 57% last year, the survey found.
Building Technology | Aug 23, 2024
Top-down construction: Streamlining the building process | BD+C
Learn why top-down construction is becoming popular again for urban projects and how it can benefit your construction process in this comprehensive blog.
Adaptive Reuse | Aug 22, 2024
6 key fire and life safety considerations for office-to-residential conversions
Office-to-residential conversions may be fraught with fire and life safety challenges, from egress requirements to fire protection system gaps. Here are six important considerations to consider.
Government Buildings | Aug 19, 2024
GSA posts new RFI for enabling energy efficiency, decarbonization in commercial buildings
The U.S. General Services Administration (GSA), in collaboration with the U.S. Department of Energy, recently released a new Request For Information (RFI) focused on enabling energy efficiency and decarbonization in commercial buildings. GSA wants to test innovative technologies through GSA’s Center for Emerging Building Technologies.
Adaptive Reuse | Aug 14, 2024
KPF unveils design for repositioning of Norman Foster’s 8 Canada Square tower in London
8 Canada Square, a Norman Foster-designed office building that’s currently the global headquarters of HSBC Holdings, will have large sections of its façade removed to create landscaped terraces. The project, designed by KPF, will be the world’s largest transformation of an office tower into a sustainable mixed-use building.
Office Buildings | Aug 8, 2024
6 design trends for the legal workplace
Law firms differ from many professional organizations in their need for private offices to meet confidentiality with clients and write and review legal documents in quiet, focused environments
Products and Materials | Jul 31, 2024
Top building products for July 2024
BD+C Editors break down July's top 15 building products, from Façades by Design to Schweiss Doors's Strap Latch bifold door.