flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

World of Concrete 2012: A tinge of optimism

World of Concrete 2012: A tinge of optimism

Cement consumption is expected to increase significantly in 2013, the first time an increase has been predicted in the past five years.


By By BD+C Staff | January 26, 2012
Laticrete introduced their Supercap Pump Truck, a mobile blending unit that can
Laticrete introduced their Supercap Pump Truck, a mobile blending unit that can deliver up to 15 tons of material per hour at WO

World of Concrete 2012 wraps up Friday in Las Vegas and the show’s 50,000 attendees are optimistic and expect better days ahead.  

One indicator of the concrete market is the annual Cement Outlook presented by Ed Sullivan, economist for the Portland Cement Association, Skokie, Ill. Cement consumption is expected to increase significantly in 2013, the first time an increase has been predicted in the past five years.

While his presentation focused primarily on the infrastructure, he noted there was a “tinge of optimism” for other markets including public utilities, industrial, and retail sectors.

By 2017, cement consumption is expected to reach levels last recorded in 2005. “The construction market is in a 12-year peak-to-peak recovery,” said Sullivan. A number of factors, including a reduction in office vacancy rates as well as unemployment rates must come to fruition before the construction market sees a significant recovery, says Sullivan.

"Jobs will determine the growth rate in the economy and also shorten the healing process," Sullivan said. "The more jobs, the more recovery at the state level, the more construction spending."

A host of GCs and concrete contractors noted an increase in residential and commercial business, however their profit margins are expected remain small in 2012.

Meanwhile, WOC 2012 exhibitors rolled out a series of new products. Maxwell Systems showcased its new construction management software; ProSpec introduced a new high-strength grout that contributes to LEED credits; and Laticrete introduced their Supercap Pump Truck, a mobile blending unit that can deliver up to 15 tons of material per hour. BD+C

Related Stories

| Sep 12, 2011

LACCD’s $6 billion BIM connection

 The Los Angeles Community College District requires every design-build team in its massive modernization program to use BIM, but what they do with their 3D data after construction is completed may be the most important change to business as usual.

| Sep 12, 2011

Construction waste management

Best practices for an environmentally optimized job site.

| Sep 12, 2011

PVs play new roles as a teaching tool

Solar installations are helping K-12 schools around the country save money and teach students the intricacies of renewable energy sources.

| Sep 12, 2011

Living Buildings: Are AEC Firms up to the Challenge?

Modular Architecture > You’ve done a LEED Gold or two, maybe even a LEED Platinum. But are you and your firm ready to take on the Living Building Challenge? Think twice before you say yes.

| Sep 12, 2011

First phase of plan to revitalize Florida's Hialeah Park announced

This is the first project of a master plan developed to revive the historic racetrack. 

| Sep 12, 2011

Geist opens European branch

The new branch provides the company’s international clients with additional support and services.

| Sep 9, 2011

$22 million investment made in energy efficient building maker

The buildings use at least 25% less energy than the strictest building codes in the U.S., and as much as 80% less energy in certain parts of the country. 

| Sep 9, 2011

Hardinger joins Ryan Companies as vice president, mission critical

He will lead the Ryan team responsible for building and developing data centers and other mission-critical projects, and will oversee business development, client relationships, executive level communications and overall marketing strategies for the division.

| Sep 7, 2011

KSS Architects wins AIA NJ design award

The project was one of three to win the award in the category of Architectural/Non-Residential. 

| Sep 6, 2011

Construction on Beijing's tallest building starts next week

The 108 floor mixed-use skyscraper consists of offices, apartments, hotels and shopping malls on the lower floors.

boombox1
boombox2
native1

More In Category

Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021