flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

This is the world’s first building completely 3D printed onsite

3D Printing

This is the world’s first building completely 3D printed onsite

The building is a lab for research on drones and 3D printing technology.


By David Malone, Associate Editor | June 14, 2017

Photo courtesy of CyBe Construction

Drones and 3D printing are two of the most talked about and researched technologies on the planet right now. Be it in the nightly news, an online story, or just overhearing a coworker or friend talking about a recent advancement, it is difficult to go through a day without hearing something new about drones or 3D printing.

A recently completed project in Dubai can give you your daily fill of both ubiquitous technologies as it melds them in the R&Drone Laboratory, a lab that will conduct research on drones and 3D printing technologies. This lab won’t just research 3D printing technologies, however, as 3D printing technology has been put to use to construct the building itself. The lab was 100% 3D printed onsite, a first for a building in the UAE, and, according to CyBe Construction, a first for the world, as well.

The facility is based at the Solar Park as part of the Research and Development Centre. Due to the size of some of the elements of the laboratory, CyBe Construction, a Dutch company responsible for the engineering and 3D Concrete printing of the facility, transported the CyBe RC 3Dp to the location in Dubai. This device is a 3D printer that is able to move on caterpillar tracks to allow for the printing of large building components onsite.

 

Image courtesy of CyBe Construction.

 

3D printing the building onsite significantly reduced transportation costs and build time for the project. A building like the R&Drone Labortory typically takes up to a couple of months to build via traditional construction methods. By using onsite 3D printing, the facility was completed within three weeks. Additionally, 3D Concrete printing is more environmentally friendly because it reduces CO2 emissions and waste.

CONVRGNT is the contractor for the project and Wanders & Wagner is the architect. Witteveen + Bos was the contractual design engineer. The Dubai Electricity and Water Authority was the client.

Related Stories

3D Printing | Aug 31, 2018

Marines built the world’s first continuous 3D-printed concrete barracks in 40 hours

Normally, it takes 10 Marines five days to build a traditional barracks out of wood.

3D Printing | Aug 29, 2018

Dubai plans to 3D print 25% of every new building by 2025

The Dubai Future Foundation recently announced the Dubai 3D Printing Strategy.

Accelerate Live! | Jun 24, 2018

Watch all 19 Accelerate Live! talks on demand

BD+C’s second annual Accelerate Live! AEC innovation conference (May 10, 2018, Chicago) featured talks on AI for construction scheduling, regenerative design, the micro-buildings movement, post-occupancy evaluation, predictive visual data analytics, digital fabrication, and more. Take in all 19 talks on demand.

| Jun 11, 2018

Accelerate Live! talk: How advanced digital fabrication techniques are driving design innovation

In this 15-minute talk at BD+C’s Accelerate Live! conference (May 10, 2018, Chicago), SOM’s Lucas Tryggestad and Kyle Vansice present the firm’s 3D-printed building project and explore how digital fabrication is pushing design innovation.

| May 30, 2018

Accelerate Live! talk: Seven technologies that restore glory to the master builder

In this 15-minute talk at BD+C’s Accelerate Live! conference (May 10, 2018, Chicago), AEC technophile Rohit Arora outlines emerging innovations that are poised to transform how we design and build structures in the near future.

3D Printing | Nov 21, 2017

Europe’s first 3D-printed building has been completed

Construction ran a few weeks behind schedule, but the 3D printing wasn’t to blame.

Codes and Standards | Aug 8, 2017

3D printing industry working to implement standards for products, processes

Additive Manufacturing Standardization Collective (AMSC) will develop industry-wide additive manufacturing standards and specifications.

Accelerate Live! | Jul 6, 2017

Watch all 20 Accelerate Live! talks on demand

BD+C’s inaugural AEC innovation conference, Accelerate Live! (May 11, Chicago), featured talks on machine learning, AI, gaming in construction, maker culture, and health-generating buildings.

Building Team Awards | Jun 14, 2017

3D-printed office: Office of the Future

Dubai kicks off 3D-printing tech initiative with a novel office project.

| Jun 13, 2017

Accelerate Live! talk: Incubating innovation through R&D and product development, Jonatan Schumacher, Thornton Tomasetti

Thornton Tomasetti’s Jonatan Schumacher presents the firm’s business model for developing, incubating, and delivering cutting-edge tools and solutions for the firm, and the greater AEC market.

boombox1
boombox2
native1

More In Category

3D Printing

3D-printed construction milestones take shape in Tennessee and Texas

Two notable 3D-printed projects mark milestones in the new construction technique of “printing” structures with specialized concrete. In Athens, Tennessee, Walmart hired Alquist 3D to build a 20-foot-high store expansion, one of the largest freestanding 3D-printed commercial concrete structures in the U.S. In Marfa, Texas, the world’s first 3D-printed hotel is under construction at an existing hotel and campground site.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021