The world’s first whole life net zero carbon hotel will launch in Chiswick, West London, at the end of this year. The project is expected to be 89 percent more energy efficient that the typical UK hotel per square meter.
The hotel, dubbed room2 Chiswick, has been built with pioneering technologies to achieve net zero throughout both the design and construction stages, as well as throughout its whole life, including both embodied and operation emissions, which the company claims is an industry first.
The hotel will use onsite renewables to convert 100% of its energy needs for heating, cooling, and hot water. A proprietary intelligent building and reporting system will improve performance across the sum of incremental gains. Two “lab rooms” will provide data on energy, water use, and air quality, along with studying and learning from guest behaviors.
Bespoke loose furniture was made from FSC certified timber and was manufactured within 10 miles of the property, with 4,478 trees having been planted to offset the emissions.
Additional initiatives include:
- Occupancy enabled lighting, heating and cooling systems
- A ‘blue’ roof which can store 50,000 liters of rainwater to minimize local flooding
- A ‘green’ roof to increase local biodiversity
- A zero waste to landfill policy, including custom made in-room recycling bins for food waste, recycling and general waste
- Water purification system uses low heat technology that reduces the temperature needed to heat water by 30 degrees
- Piloting recycled li-ion battery cell M-BRIC technology to incorporate energy demand response and storage
- All unavoidable emissions balanced through verified nature-based carbon removal offsets
- A BREEAM excellent rating
The project will officially open in December.
Related Stories
| Aug 14, 2013
Green Building Report [2013 Giants 300 Report]
Building Design+Construction's rankings of the nation's largest green design and construction firms.
| Jul 31, 2013
Hotel, retail sectors bright spots of sluggish nonresidential construction market
A disappointing recovery of the U.S. economy is limiting need for new nonresidential building activity, said AIA Chief Economist, Kermit Baker in the AIA's semi-annual Consensus Construction Forecast, released today. As a result, AIA reduced its projections for 2013 spending to 2.3%.
| Jul 22, 2013
Top Hotel Construction Firms [2013 Giants 300 Report]
Manhattan Construction, Structure Tone, Lend Lease top Building Design+Construction's 2013 ranking of the largest hotel contractors and construction management firms in the U.S.
| Jul 22, 2013
Top Hotel Engineering Firms [2013 Giants 300 Report]
AECOM, Parsons Brinckerhoff, Buro Happold top Building Design+Construction's 2013 ranking of the largest hotel engineering and engineering/architecture firms in the U.S.
| Jul 22, 2013
Top Hotel Architecture Firms [2013 Giants 300 Report]
Gensler, WATG, HKS top Building Design+Construction's 2013 ranking of the largest hotel architecture and architecture/engineering firms in the U.S.
| Jul 22, 2013
Hotel business continues to shine [2013 Giants 300 Report]
Despite some economic stressors, hotel operating fundamentals are poised to remain strong in 2013.
| Jul 19, 2013
Reconstruction Sector Construction Firms [2013 Giants 300 Report]
Structure Tone, DPR, Gilbane top Building Design+Construction's 2013 ranking of the largest reconstruction contractor and construction management firms in the U.S.
| Jul 19, 2013
Reconstruction Sector Engineering Firms [2013 Giants 300 Report]
URS, STV, Wiss Janney Elstner top Building Design+Construction's 2013 ranking of the largest reconstruction engineering and engineering/architecture firms in the U.S.
| Jul 19, 2013
Reconstruction Sector Architecture Firms [2013 Giants 300 Report]
Stantec, HOK, HDR top Building Design+Construction's 2013 ranking of the largest reconstruction architecture and architecture/engineering firms in the U.S.
| Jul 19, 2013
Renovation, adaptive reuse stay strong, providing fertile ground for growth [2013 Giants 300 Report]
Increasingly, owners recognize that existing buildings represent a considerable resource in embodied energy, which can often be leveraged for lower front-end costs and a faster turnaround than new construction.