flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

World’s first zero carbon 5-star hotel doubles as Bali solar power plant

World’s first zero carbon 5-star hotel doubles as Bali solar power plant


By Leslie Streicher, Associate Editor | July 22, 2011
The Bali Net Zero Hotel Resort and Spa—designed by Christine Hadiningrat and Sauter Carbon Offset Design—is the world’s first zero carbon five-star hotel. The hotel provides 2.5 MW of electricity per day from a solar cell array installed on four floors of roof. Certified as a Carbon Offset Project, the hotel generates enough electricity during sunlight hours to power the hotel and the local community through the night, eliminating the need of a storage system. Profits from sales of the hotel-generated electricity to the community will be used to help generate power for local schools and public centers.

Related Stories

M/E/P Systems | May 23, 2019

Process analysis is how one MEP producer is coping with the industry’s labor woes

Southland Industries takes a measured approach to leaning into technology.

AEC Tech | Jan 9, 2019

Our robotic future: Assessing AI's impact on the AEC profession and the built environment

This is the first in a series by Lance Hosey, FAIA, on how automation is disrupting design and construction.

Building Technology | Dec 20, 2018

Autodesk is spending $1.15 billion to acquire two construction tech providers

PlanGrid and BuildingConnected are the latest pieces in the company’s quest to digitize the construction industry.

Building Technology | Dec 18, 2018

Data and analytics are becoming essential for EC firms competing to rebuild America’s infrastructure

A new paper from Deloitte Consulting advises companies to revise their strategies with an eye toward leveraging advanced technologies.

Building Automation | Aug 28, 2018

Bricklaying robot speeds up construction time of University of Nevada Arts Building

A-1 Masonry and Sandblasting and Q&D Construction brought the robot to the project.

Modular Building | Aug 6, 2018

More contractors are turning to offsite production for speed and quality

Skender launches an advanced manufacturing division. Katerra ups its bet on modular. Prefabrication comes to the rescue on multiple projects.

Building Automation | Jul 13, 2018

Katerra has plans for a new advanced manufacturing factory in California

The building components facility will be located near rail, shipping ports, and freeways.

Building Technology | Jun 13, 2018

Rovers set to invade construction jobsites

This autonomous construction management tool tracks jobsite progress in real time.

AEC Tech | May 23, 2017

A funny thing may happen on the way to AI

As AI proves safe, big business will want to reduce overhead.

Retail Centers | Apr 27, 2017

Changing an automotive retail paradigm

Significant changes are underway as automotive manufacturers and retailers try to anticipate consumer demands in changes in their business models.

boombox1
boombox2
native1

More In Category


AEC Tech

Lack of organizational readiness is biggest hurdle to artificial intelligence adoption

Managers of companies in the industrial sector, including construction, have bought the hype of artificial intelligence (AI) as a transformative technology, but their organizations are not ready to realize its promise, according to research from IFS, a global cloud enterprise software company. An IFS survey of 1,700 senior decision-makers found that 84% of executives anticipate massive organizational benefits from AI. 



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021