Zackery House has been named Vice President and Group Leader of Technology Consulting Engineering at ESD (Environmental Systems Design, Inc.), an international leader in the consulting-engineering design of high performance building systems.
In his new position, Mr. House will be responsible for strategic project and staffing decisions for ESD’s Technology Consulting Engineering Group. He is responsible for resource and project management assessments, strengthening marketplace awareness, and business development.
Prior to joining ESD, Mr. House was Director of Telecommunication Project Services at Wal-Mart Stores in Bentonville, Arkansas. In this position, he built a team of IT professionals who delivered global technology systems infrastructure aligned to business goals and service delivery. He was responsible for the daily operations of a team of telecom project managers and registered communication distribution designers, and he drove telecom innovation across all Wal-Mart and Sam’s Club US Division formats.
Mr. House is a Certified Professional Project Leader, Registered Information Technology Project Manager (RITPM), Registered Telecommunications Project Manager (RTPM), BICSI Registered Communications Distribution Designer (RCDD), and Outside Plant Specialist (OSP). He also has a Six Sigma White Belt Certification. Mr. House received a Master of Science in Operations Management from the University of Arkansas’ College of Engineering and a Bachelor of Science in Business Management from Capella University.
ESD is a global consulting-engineering firm that focuses on the delivery of high-performance buildings. The company delivers value by creating healthy and productive environments and designing facilities that are more cost effective, flexible, reliable, and sustainable. Utilizing an integrative design process, ESD’s engineering and design professionals (250+) apply innovative technologies such as energy modeling and BIM (Building Information Modeling) to address owners’ needs. For more information, please visit: www.esdglobal.com.
Related Stories
| Jan 21, 2015
Tesla Motors starts construction on $5 billion battery plant in Nevada
Tesla Motors’ “gigafactory,” a $5 billion project on 980 acres in Sparks, Nev., could annually produce enough power for 500,000 electric cars.
| Jan 20, 2015
Daring hotel design scheme takes the shape of cut amethyst stone
The Dutch practice NL Architects designed a proposal for a chain of hotels shaped like a rock cut in half to reveal a gemstone inside.
| Jan 20, 2015
Avery Associates unveils plans for London's second-tallest tower
The 270-meter tower, dubbed the No. 1 Undershaft, will stand next to the city's "Cheesegrater" building.
| Jan 19, 2015
HAO unveils designs for a 3D movie museum in China
New York-based HAO has released designs for the proposed Bolong 3D Movie Museum & Mediatek in Tianjin.
| Jan 19, 2015
Gaudi’s first work outside Spain will be a chapel in Chile
Nearly 100 years after Antoni Gaudí’s death, Chile will begin constructing a chapel using his designs.
| Jan 19, 2015
Architecture for Humanity closes office, plans to file for bankruptcy
After more than 15 years of work, the nonprofit design group Architecture for Humanity has closed its San Francisco office and plans to file for Chapter 7 bankruptcy protection.
| Jan 17, 2015
When is a train station not a train station? When it’s a performance venue
You can catch a train at Minneapolis’s new Target Field Station. You can also share in an experience. That’s what ‘Open Transit’ is all about.
| Jan 16, 2015
Artsy lifeguard stations will brighten Toronto’s snowy beach
Five winning designs have been unveiled for lifeguard stands that will double as public space art installations on Toronto's beach.
| Jan 16, 2015
New York City construction costs continue to climb
A study released by the New York Building Congress shows that construction costs in Manhattan have risen 5% in each of the last two years.
| Jan 15, 2015
A reconstructed Taliesin West is the largest Frank Lloyd Wright LEGO Model [slideshow]
Artist Adam Reed Tucker used 180,000 LEGO pieces and 420 hours of work to recreate Frank Lloyd Wright's Taliesin West campus.