flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Zackery House joins ESD as Group Leader of Technology Consulting Engineering

Zackery House joins ESD as Group Leader of Technology Consulting Engineering


By ESD | March 14, 2013
Zackery House
Zackery House

Zackery House has been named Vice President and Group Leader of Technology Consulting Engineering at ESD (Environmental Systems Design, Inc.), an international leader in the consulting-engineering design of high performance building systems.

In his new position, Mr. House will be responsible for strategic project and staffing decisions for ESD’s Technology Consulting Engineering Group. He is responsible for resource and project management assessments, strengthening marketplace awareness, and business development.

Prior to joining ESD, Mr. House was Director of Telecommunication Project Services at Wal-Mart Stores in Bentonville, Arkansas. In this position, he built a team of IT professionals who delivered global technology systems infrastructure aligned to business goals and service delivery.  He was responsible for the daily operations of a team of telecom project managers and registered communication distribution designers, and he drove telecom innovation across all Wal-Mart and Sam’s Club US Division formats.

Mr. House is a Certified Professional Project Leader, Registered Information Technology Project Manager (RITPM), Registered Telecommunications Project Manager (RTPM), BICSI Registered Communications Distribution Designer (RCDD), and Outside Plant Specialist (OSP).  He also has a Six Sigma White Belt Certification.  Mr. House received a Master of Science in Operations Management from the University of Arkansas’ College of Engineering and a Bachelor of Science in Business Management from Capella University.

ESD is a global consulting-engineering firm that focuses on the delivery of high-performance buildings.  The company delivers value by creating healthy and productive environments and designing facilities that are more cost effective, flexible, reliable, and sustainable. Utilizing an integrative design process, ESD’s engineering and design professionals (250+) apply innovative technologies such as energy modeling and BIM (Building Information Modeling) to address owners’ needs.  For more information, please visit: www.esdglobal.com.

Tags

Related Stories

| Oct 30, 2012

Lord, Aeck & Sargent announces four student life facility wins

Projects recognize the architecture firm’s expertise on a nationwide basis.

| Oct 30, 2012

The Beck Group announces CEO succession plan

Current Eastern Division Director and company veteran, Fred Perpall, named CEO.

| Oct 30, 2012

Two-hour fire rated curtain wall passes CDC tests

CDC (Curtain Wall Design and Consulting) is an independent firm providing a wide range of building envelope design, engineering, and consulting services to design professionals nationwide.

| Oct 30, 2012

Wight & Company announces three hires

Expands team and adds staff to work on the UNO project.

| Oct 15, 2012

Silicones from Dow Corning solve high-altitude technical challenges at the world’s tallest tower

The spectacular Burj Khalifa skyscraper soars to 828m above ground level, holding the record for being the world’s tallest building and also for the highest installation of an aluminum and glass façade. To take on its numerous challenges and technical difficulties, it required proven silicone solutions and full support from Dow Corning.

| Oct 15, 2012

Three new members elected to AISC Board of Directors

New members will immediately begin serving on the AISC Board of Directors, assisting with the organization's planning and leadership in the steel construction industry.

| Oct 9, 2012

Celebrating brick in architecture

The Brick Industry Association’s 2012 Brick in Architecture Awards put the spotlight on new projects that make creative use of one of humankind’s oldest and most beloved building materials.

| Oct 5, 2012

2012 Reconstruction Award Special Recognition: Joplin Interim High School, Joplin, Mo.

At 5:41 p.m. CDT on Sunday, May 22, 2011, an EF5 tornado touched down in Joplin, Mo. In the next 31 minutes, the mile-wide, multiple-vortex tornado, with winds up to 250 mph, destroyed two thousand buildings, including Joplin High and nine other schools.

| Oct 5, 2012

2012 Reconstruction Award Bronze Winner: DPR Construction, Phoenix Regional Office, Phoenix, Ariz.

Working with A/E firm SmithGroupJJR, DPR converted a vacant 16,533-sf one-time “adult-themed boutique” in the city’s reemerging Discovery Triangle into a LEED-NC Platinum office, one that is on target to be the first net-zero commercial office building in Arizona.

| Oct 5, 2012

2012 Reconstruction Award Bronze Winner: Pomeroy Senior Apartments, Chicago, Ill.

The entire interior of the building was renovated, from the first floor lobby and common areas, to the rooftop spaces. The number of living units was reduced from 120 to 104 to allow for more space per unit and comply with current accessibility requirements.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021