flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Zaha Hadid unveils dune-shaped HQ for Emirati environmental management company

Zaha Hadid unveils dune-shaped HQ for Emirati environmental management company

The building was designed to run 100% on renewable energy


By BD+C Staff | December 19, 2014
Renderings courtesy Zaha Hadid Architects
Renderings courtesy Zaha Hadid Architects

Zaha Hadid Architects recently released designs for the new headquarters of Emirati environmental management company Bee’ah, revealing a structure that references the shape and motion of a sand dune.

According to Dezeen, the 75,347-sf building will be constructed in the emirate of Sharjah, in the country’s northern region. The building will house the administrative and public activity functions of the company.

Inhabitat reports that the building will be open to the public and host a learning resource center to raise awareness on the environment in Sharjah.

Staying true to the company’s purpose in environmental stewardship, the facility was designed to be entirely powered by renewable energy. According to Inhabitat, the building uses active and passive design approaches, which are expected to decrease the building’s energy use by 30%.

Some examples of measures for a low footprint include a ventilation energy recovery system that reduces the need for mechanical cooling systems, and photovoltaic cells will be integrated in the surrounding landscape to provide the building with solar power.

Hadid's firm is collaborating with engineer Buro Happold and environmental consultant Atelier Ten on the project.

Learn more about the project at Dezeen.

 

Related Stories

| Aug 21, 2012

Under 40 Leadership Summit slated for October 3-5 in Chicago

Attendees will be given an exclusive technical tour of Wrigley Field, led by Steven J. Jacobsen, CDP, who has been retained by the Chicago Cubs to create the business plan and high-level concepts to evaluate the feasibility of various renovation options for this iconic sports venue; and Carl Rice, Cubs’ Vice President, Baseball Operations.

| Aug 21, 2012

Hong Kong’s first LEED Platinum pre-certified building opens

Environmentally-sensitive features have been incorporated, including reduced operational CO2 emissions, and providing occupiers with more choice in creating a suitable working environment.

| Aug 21, 2012

Stellar wins four ABC Excellence In Construction awards

ABC's Excellence In Construction program is the industry’s leading award competition, recognizing outstanding construction projects in a variety of categories.

| Aug 20, 2012

Protecting the artifacts at George H.W. Bush Presidential Library and Museum

Roof leaks threatened to damage artifacts and disturb a delicately controlled indoor environment at the George H.W. Bush Presidential Library and Museum.

| Aug 17, 2012

Ferreri joins PGAL as Principal

Ferreri will be responsible for business development, contract negotiation, project design through construction and staff management/mentoring.

| Aug 17, 2012

Centric Architecture and PLAD Studio merge

The new firm will retain Centric Architecture as its name.

| Aug 15, 2012

MBH Architects announces new appointments

MBH Architects continues to grow, take on new clients.

| Aug 15, 2012

Architects and designers challenged in Allsteel’s reality design competition

KITS mobile app offers flexibility in planning.

| Aug 14, 2012

Leo A Daly welcomes Carl Gentilcore

Gentilcore will be responsible for identifying, developing and managing client relations with key federal government agencies.

| Aug 14, 2012

SOM Foundation announces prize recipients for 2012

Submissions for the SOM Prize were received from students at 34 schools in the U.S.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021