Designed by Zaha Hadid Architects, the new King Abdullah Financial District (KAFD) Metro Station in Riyadh, Saudi Arabia will serve as a key interchange on the new Riyadh Metro network for Line 1 and the terminus of Line 4 and Line 6.
The 45,000-sm complex will include four above ground levels and two below ground (car parking) and will be integrated within the urban context of the financial district. The most striking feature of the new metro station is the façade, meant to represent patterns generated by desert winds.
Courtesy ZHA.
The façade is design-engineered by Newtecnic to reduce solar gain and produce air currents that help cool the building. The firm’s research team had to develop new algorithms to achieve this level of performance. Additionally, Newtecnic had to invent new adjustable building components and fixing methods for the structure’s self-supporting, 650-foot-long concrete-composite walls and roof.
The result of this world-first-façade and the new techniques used to create it is an undulating, futuristic building that will be delivered for the price of a more traditional structure and last twice as long.
Courtesy ZHA.
The KAFD Metro Hub is designed to support Riyadh’s expected 50% growth over the coming years and is part of a new citywide transport system that comprises six metro line, 85 stations, and more than 100 miles of track.
BACS Consortium is the general contractor for the project, which is slated for completion in 2018.
Courtesy ZHA.
Related Stories
| Jun 1, 2012
New BD+C University Course on Insulated Metal Panels available
By completing this course, you earn 1.0 HSW/SD AIA Learning Units.
| May 29, 2012
Reconstruction Awards Entry Information
Download a PDF of the Entry Information at the bottom of this page.
| May 29, 2012
Thornton Tomasetti/Fore Solutions provides consulting for Phase I of Acadia Gateway Center
Project receives LEED Gold certification.
| May 24, 2012
2012 Reconstruction Awards Entry Form
Download a PDF of the Entry Form at the bottom of this page.
| Mar 29, 2012
U.K.’s Manchester Airport tower constructed in nine days
Time-lapse video shows construction workers on the jobsite for 222 continuous hours.
| Feb 15, 2012
Skanska secures $87M contract for subway project
The construction value of the project is $261.9 M. Skanska will include its full share, $87 M, in the bookings for Skanska USA Civil for the first quarter 2012.
| Dec 21, 2011
Hoboken Terminal restoration complete
Restoration of ferry slips, expanded service to benefit commuters.
| Dec 19, 2011
Davis Construction breaks ground on new NIAID property
The new offices will total 490,998 square feet in a 10-story building with two wings of 25,000 square feet each.
| Dec 2, 2011
What are you waiting for? BD+C's 2012 40 Under 40 nominations are due Friday, Jan. 20
Nominate a colleague, peer, or even yourself. Applications available here.
| Nov 10, 2011
Suffolk Construction awarded MBTA transit facility and streetscape project
The 21,000-sf project will feature construction of a cable-stayed pedestrian bridge over Ocean Avenue, an elevated plaza deck above Wonderland MBTA Station, a central plaza, and an at-grade pedestrian crossing over Revere Beach Boulevard