There is near universal consensus that the data center market is growing rapidly. In the next five years alone, twice as much data will be generated as created in the past decade, according to Jennifer DiMambro, Global and Americas Science, Industry and Technology Leader, Arup.
According to Darius Shroff, NCARB, CDT, LEED AP BD+C, Project Manager, HDR, the data center market value is projected to reach over $340 billion in 2024, with revenue expected to grow exponentially at a rate of 6.5%—increasing to $438.70 billion by 2028.
Many are in agreement of the market’s growth projections. But while its growth is driven largely by the high-performance computing demand of artificial intelligence (AI), there remains a multitude of limitations hindering the speed of data center delivery.
The influence that AI has on the data center sector cannot be understated. From needing to implement alternative cooling methods to the increased scale of projects under construction, AI has its hand in almost every aspect.
These are 10 of the biggest impacts on the data center market today:
1. Liquid cooling.
Liquid cooling technologies are the biggest trend in the data center market this year—a result of the demand for artificial intelligence. Alternative cooling methods like immersion, direct-to-chip, and rear door heat exchangers are becoming commonplace in data center design as standard air cooling is ill-suited for the increased power demands.
The incorporation of liquid cooling at scale has “the largest impact on data center design and construction at the moment,” according to Gabe Clark, AIA, LEED AP, NCARB, Principal and Data Centers Sector Leader, Corgan.
The rise in liquid cooling is impacting reference designs due to the higher power densities. Building planning and programming, structural loading solutions, and rack densities have been impacted by liquid cooling necessities as well.
2. Sustainability concerns.
One cannot discuss the impact that AI has on the data center market without acknowledging one of its greatest pitfalls: power consumption.
The availability of power is becoming the primary limiting factor for market expansion rather than geographical location, according to Mark Nakatani, AIA, NCARB, LEED AP BD+C, DBIA, Principal and Global Practice Director, Mission Critical, HKS. This has led to an increased concern in sustainability and on-site renewable power generation and storage.
Some firms like Cushing Terrell utilize microgrids and modular battery storage systems to help alleviate these concerns, says the firm’s Principal and Director of Infrastructure, Alan Bronec, PE.
Others have found an increase in integrating renewable energy sources like geothermal, solar, and wind power to reduce carbon footprints, according to Aaron Martens, LEED BD+C, Vice President and Co-Business Unit Leader, Mission Critical, HITT Contracting.
Nuclear-powered data centers are also on the rise. Small modular (nuclear) reactors (SMRs) stand as a green alternative to elevate steady-state power production on the grid, making projects less reliant on non-renewable energy sources.
3. Speed-to-market demands.
Another universal truth about data centers in 2024? They cannot be built fast enough.
“Clients are demanding partners that can deliver on tight schedules and cost requirements,” says Greg Wimmer, Executive Vice President and Data Center Business Unit Leader, Fortis Construction.
Firms are finding ways to speed up the process from design to construction. Alternative delivery methods like prefab and preconstruction, bespoke means of equipment sourcing, and strategic site procurement are “critical factors” when condensing timelines, according to Shroff.
4. Virtual Reality.
In an effort to speed up the construction process, two firms have found success in the use of virtual reality (VR) as a time- and cost-saving benefit.
DPR Construction’s Virtual Design & Construction (VDC) leaders use VR tools for constructability reviews on large-scale data center projects. The firm has found that it helps reduce the cost of rework, requests for information, and change orders associated with operability issues, according to John Arcello, Advanced Technology Core Market Co-Leader, DPR Construction.
Fortis Construction saved an estimated $3 million on a complicated data center project in Singapore by using Resolve software and Meta Quest VR headsets. The team prevented millions of dollars worth of waste in rework costs within a span of three months, according to Wimmer.
5. Increased site evaluations.
One of the biggest impacts on the data center market today is the magnitude of work to be done. For a firm like Arup, there are multiple potential sites being evaluated at any given time for future data center builds.
6. More regional opportunities.
Rather than constructing campuses near dense urban areas, some data centers are moving into rural regions with lower energy costs, colder climates, and less concern on network latency. These areas are typically favorable for producing on-site renewable energy as well, and can meet the elevated power demands of an AI-enabled data center, says Martens.
However, there are still certain regions where data centers are expanding substantially faster than others. Northern Virginia, Ohio, and Oregon continue to see significant growth, according to Sean McNamara, Manager of Preconstruction Services, Performance Contracting Inc.
In fact, a large portion of money spent on data center development has landed in central Ohio. According to a Newmark U.S. data center market report, the combination of large swaths of commercial land and low-cost power have provided an advantageous destination for major companies like Google, Amazon, and Microsoft to build data centers.
7. Supply chain challenges.
Supply chain issues continue to delay procurement of essential equipment. Generators, chillers, and transformers continue to impact construction costs and schedules, according to Arcello. Distribution components such as busways, piping, and copper feeders used for data center operations have increased lead times.
“We’ve seen equipment with lead times over two years,” says Jim Gikas, LEED AP BD+C, CEM, CBCP, ATD, Managing Principal, Vanderweil.
8. Data hall density.
The primary focus of many data center designs today includes adequate power distribution and cooling for high-density racks. Because AI workloads—specifically those involving deep learning—require significant computational power, data centers need to be constructed with a smaller building footprint and larger cooling yards, according to Mortenson’s Data Center Solutions’ leaders, Darin Knapp, VP and General Manager, and Steve Knighton, VP and General Manager.
Though Bronec believes there is a lack of certainty in what the end-user power density will be, innovative design solutions have to be made to accommodate the complicated (and perhaps unknown) needs of AI.
Building designs are changing to move equipment into the yard and campus footprints are expanding, with increased fiber network connectivity required for GPU clusters, according to Arcello.
9. New players in the space.
With the sector hot and booming, there are many new players entering the data center space. An increasing number of capital investment firms, developers, and service providers with minimal past experience in the sector are entering the data center business due to its growth, says Gikas.
However, Bronec believes data center developers are struggling to determine what level of investment to make because the electrical service, distribution infrastructure, and complex DLC systems for these high power levels are so expensive.
10. Scale and scope.
Overall, data center campuses are getting larger than ever before. Some projects seek to “divide and conquer” by distributing a data center’s needs across strategically located and designed sites—rather than building a one-size-fits-all hyperscale data center, says Bronec.
These multi-building campus developments are becoming more common in order to support AI demand. Some firms, like DPR, have seen power requirements “to the tune of 200–400 megawatts,” according to Arcello. For others it’s higher, as Brian Schafer, Principal at Highland Associates, is seeing campuses in the one gigawatt size with individual buildings in the range of 500 megawatts.
Related Stories
Giants 400 | Oct 2, 2023
Top 30 Data Center Architecture Firms for 2023
Corgan, HDR, Gensler, Page Southerland Page, and HED top BD+C's ranking of the nation's largest data center sector architecture and architecture/engineering (AE) firms for 2023, as reported in Building Design+Construction's 2023 Giants 400 Report.
Data Centers | Sep 21, 2023
North American data center construction rises 25% to record high in first half of 2023, driven by growth of artificial intelligence
CBRE’s latest North American Data Center Trends Report found there is 2,287.6 megawatts (MW) of data center supply currently under construction in primary markets, reaching a new all-time high with more than 70% already preleased.
Data Centers | Sep 15, 2023
Power constraints are restricting data center market growth
There is record global demand for new data centers, but availability of power is hampering market growth. That’s one of the key findings from a new CBRE report: Global Data Center Trends 2023.
Giants 400 | Aug 22, 2023
Top 115 Architecture Engineering Firms for 2023
Stantec, HDR, Page, HOK, and Arcadis North America top the rankings of the nation's largest architecture engineering (AE) firms for nonresidential building and multifamily housing work, as reported in Building Design+Construction's 2023 Giants 400 Report.
Giants 400 | Aug 22, 2023
2023 Giants 400 Report: Ranking the nation's largest architecture, engineering, and construction firms
A record 552 AEC firms submitted data for BD+C's 2023 Giants 400 Report. The final report includes 137 rankings across 25 building sectors and specialty categories.
Giants 400 | Aug 22, 2023
Top 175 Architecture Firms for 2023
Gensler, HKS, Perkins&Will, Corgan, and Perkins Eastman top the rankings of the nation's largest architecture firms for nonresidential building and multifamily housing work, as reported in Building Design+Construction's 2023 Giants 400 Report.
Market Data | Aug 1, 2023
Nonresidential construction spending increases slightly in June
National nonresidential construction spending increased 0.1% in June, according to an Associated Builders and Contractors analysis of data published today by the U.S. Census Bureau. Spending is up 18% over the past 12 months. On a seasonally adjusted annualized basis, nonresidential spending totaled $1.07 trillion in June.
Data Centers | Apr 14, 2023
JLL's data center outlook: Cloud computing, AI driving exponential growth for data center industry
According to JLL’s new Global Data Center Outlook, the mass adoption of cloud computing and artificial intelligence (AI) is driving exponential growth for the data center industry, with hyperscale and edge computing leading investor demand.
Sustainability | Apr 4, 2023
NIBS report: Decarbonizing the U.S. building sector will require massive, coordinated effort
Decarbonizing the building sector will require a massive, strategic, and coordinated effort by the public and private sectors, according to a report by the National Institute of Building Sciences (NIBS).
Energy | Mar 20, 2023
Battery energy storage market predictions are trickier than ever
Burns & McDonnell breaks down the state of battery energy storage today, from pricing concerns to alternative solutions.