flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

100% affordable housing development features 62-units for low-income households

Multifamily Housing

100% affordable housing development features 62-units for low-income households

Magnusson Architecture + Planning is designing the project.


By David Malone, Associate Editor | July 31, 2019

Rendering courtesy Magnusson Architecture + Planning

The Bryant, a 62-unit affordable and supportive housing development in the Bronx, will include 37 units reserved for families coming from New York City’s domestic violence shelters. Services for families who are homeless due to domestic violence will also be included.

The Bryant features several spaces for shared use including a multipurpose room for resident meetings and events, a children’s room, a landscaped backyard with a children’s play area, a laundry room, and a library overlooking a green roof. All the units include large windows for abundant natural light.

 

See Also: Robotic interiors: How to make a studio apartment feel as big as a one-bedroom unit

 

On-site services are provided by New Destiny Housing and include safety planning, counseling, job readiness assistance, financial planning, and children and family programming to help families heal and move forward with their lives.

The building will meet the requirements of Enterprise Green Communities with EPA Energy Star Multifamily High Riser Program compliance.

Related Stories

BAS and Security | Oct 19, 2022

The biggest cybersecurity threats in commercial real estate, and how to mitigate them

Coleman Wolf, Senior Security Systems Consultant with global engineering firm ESD, outlines the top-three cybersecurity threats to commercial and institutional building owners and property managers, and offers advice on how to deter and defend against hackers. 

Codes and Standards | Oct 17, 2022

Ambitious state EV adoption goals put pressure on multifamily owners to provide chargers

California’s recently announced ban on the sale of new gas-powered vehicles starting in 2035—and New York’s recent decision to follow suit—are putting pressure on multifamily property owners to install charging stations for tenants.

Multifamily Housing | Oct 7, 2022

Design for new Ft. Lauderdale mixed-use tower features sequence of stepped rounded volumes

The newly revealed design for 633 SE 3rd Ave., a 47-story, mixed-use tower in Ft. Lauderdale, features a sequence of stepped rounded volumes that ease the massing of the tower as it rises.

Multifamily Housing | Oct 5, 2022

Co-living spaces, wellness-minded designs among innovations in multifamily housing

The booming multifamily sector shows no signs of a significant slowdown heading into 2023. Here is a round up of Giants 400 firms that are driving innovation in this sector.

Fire and Life Safety | Oct 4, 2022

Fire safety considerations for cantilevered buildings

Bold cantilevered designs are prevalent today, as developers and architects strive to maximize space, views, and natural light in buildings. Cantilevered structures, however, present a host of challenges for building teams, according to José R. Rivera, PE, Associate Principal and Director of Plumbing and Fire Protection with Lilker.

| Oct 4, 2022

Rental property owners want access to utility usage data for whole properties

As pressure from investors for ESG reporting mounts, owners of multifamily properties increasingly look to collect whole-building utility usage data.

Resiliency | Sep 30, 2022

Designing buildings for wildfire defensibility

Wold Architects and Engineers' Senior Planner Ryan Downs, AIA, talks about how to make structures and communities more fire-resistant.

Multifamily Housing | Sep 15, 2022

Toronto’s B-Line Condominiums completed using prefabricated panels

B-Line Condos, Toronto, completed using Sto Panel Technology.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021