flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

$100 billion 'city from scratch' taking shape in Saudi Arabia

Mixed-Use

$100 billion 'city from scratch' taking shape in Saudi Arabia

The new King Abdullah Economic City was conceived to diversify the kingdom's oil-dependent economy by focusing more in its shipping industry.


By BD+C Staff | April 7, 2015
Construction site updates from the new $100 billion Saudi Arabian city

The city constructed from scratch off the Red Sea coast will give its port access to the Suez Canal, reflecting the government’s attempt to diversify its oil-dependent economy by focusing more in its shipping industry. Rendering courtesy of the King Abdullah Economic City.

Back in 2005, the Saudi government announced plans to create a new city (from scratch) on its western coast that will be the size of Washington D.C. The Council on Tall Buildings and Urban Habitat reports that construction is already under way.

The city is named after the late King Abdullah of Saudi Arabia, who died in January 2015. Its formal name is the King Abdullah Economic City (KAEC).

Having a city on the peninsular country’s western coast will give it access to the Suez Canal, reflecting the government’s attempt to diversify its oil-dependent economy by focusing more in its shipping industry. 

According to the CTBUH, Saudi Arabia hopes the port will be part of a new Silk Road that will connect with Mediterranean countries and Southern Europe.

Eric Reguly, a journalist of Canada’s Globe and Mail newspaper, who visited the under-construction city a few months ago, said the site looks more like a movie set.

“The rest of the city is pretty much an expanse of nothing, save for a suburb of villas, an international school and, a dozen kilometers to the north, a container-ship port, and a few factories in an area that could double as a stage set for a Mad Max film,” Reguly writes. 

During a recent interview with Public Radio International, Reguly said that the city’s reliance on cars is an obvious flaw. “"It's going to be very much dependent on cheap oil," he adds, which was the very thing the city was designed to avoid.

For more information on the project, visit The Council on Tall Buildings and Urban Habitat and Globe and Mail.

Related Stories

| Jun 1, 2012

New BD+C University Course on Insulated Metal Panels available

By completing this course, you earn 1.0 HSW/SD AIA Learning Units.

| May 29, 2012

Reconstruction Awards Entry Information

Download a PDF of the Entry Information at the bottom of this page.

| May 24, 2012

2012 Reconstruction Awards Entry Form

Download a PDF of the Entry Form at the bottom of this page.

| May 23, 2012

Summit Design+Build selected as GC for Chicago restaurant

Little Goat will truly be a multifunctional space.  Construction plans include stripping the 10,000 sq. ft. building down to the bare structure everywhere, the installation of a new custom elevator and adding square footage at the second floor with an addition.

| Apr 30, 2012

HSA Commercial selected as consultant for Orland Park’s Main Street Triangle project

HSA will be responsible for designing an overall mixed-use merchandise plan, attracting a unique retail tenant mix and completing leases with prospective tenants.

| Apr 20, 2012

Shawmut completes Yard House Restaurant in Boston

12,000-sf restaurant marks new addition to Boston’s Fenway neighborhood.

| Apr 6, 2012

Batson-Cook breaks ground on hotel adjacent to Infantry Museum & Fort Benning

The four-story, 65,000-ft property will feature 102 hotel rooms, including 14 studio suites.

| Apr 4, 2012

JCJ Architecture designs New York City's first casino

Aqueduct Racetrack complex transformed into modern entertainment destination.

| Apr 3, 2012

Luxury hotel 'groundscraper' planned in abandoned quarry

Would you spend $300 a night to sleep underground? You might, once you see the designs for China's latest hotel project.

| Mar 16, 2012

Temporary fix to CityCenter's Harmon would cost $2 million, contractor says

By contrast, CityCenter half-owner and developer MGM Resorts International determined last year that the Harmon would collapse in a strong quake and can't be fixed in an economical way. It favors implosion at a cost of $30 million.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021