flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New mixed-use tower by Studio Gang completes first phase of San Francisco waterfront redevelopment

Mixed-Use

New mixed-use tower by Studio Gang completes first phase of San Francisco waterfront redevelopment

The 23-story building provides 254 new residential units, along with ground-floor retail.


By Peter Fabris, Contributing Editor | October 7, 2024
Studio Gang completes Verde tower in San Francisco, photo copyright Jason O'Rear, courtesy Studio Gang
Photo copyright Jason O'Rear, courtesy Studio Gang

Construction was recently completed on Verde, a new mixed-use tower along the San Francisco waterfront, marking the end of the first phase of the Mission Rock development. Verde is the fourth and final building of phase one of the 28-acre project that will be constructed in several phases guided by design principles developed by a design cohort led by Studio Gang.

Verde, intended to be Mission Rock’s central social hub, takes its name from distinctive, green-colored glazed ceramic cladding that allows for variations in color and depth at multiple scales. The 23-story building provides 254 new residential units—59 of which are designated for middle-income households at below-market rents.

The building features a ground-level café, shops, and micro-activations that include a water bottle refill station and a living wall. Resident amenities include a fitness center, lounges, a game room, a golf simulator, and a shared outdoor dining space equipped with a barbecue and firepit. A sky deck on the tower’s roof provides another space for residents to take in views of Oracle Park, San Francisco Bay, and the city’s skyline.

“We wanted to create spaces where residents could connect with each other while feeling embraced by the natural beauty of San Francisco,” said Studio Gang’s founding partner Jeanne Gang. “The tower’s floorplates are carved back at the corners to create outdoor terraces that are unique across each floor. These terraces are oriented to maximize sunlight and protect from the wind while providing residents views of the city and San Francisco Bay. From the street, the alternating carved terraces give the building a rhythmic play of light.”

Studio Gang completes Verde tower in San Francisco, photo copyright Jason O'Rear, courtesy Studio Gang
Photo copyright Jason O'Rear, courtesy Studio Gang 

Located near major public transit nodes, the site offers access to the waterfront Bay Trail and over 250 bicycle parking spaces to encourage alternative and active modes of transportation. The development is elevated five feet above sea level to ensure protection against future sea level rise and storm surges. The building reuses and recycles greywater for irrigation and non-potable needs, as well as sources hot and cold water from a District Energy Plant. Planted with regionally appropriate flora, the sky deck attracts birds, butterflies, and other pollinators to enhance urban biodiversity. The building is targeting LEED Gold certification.

Verde is part of Mission Rock redevelopment led by Mission Rock Partners, a public-private partnership between Tishman Speyer, the San Francisco Giants, and the Port of San Francisco. The new neighborhood offers unprecedented public access to San Francisco Bay and introduces more than 500 new homes and 600,000 sf of retail and office space to San Francisco’s Central Waterfront.

The first phase of Mission Rock features China Basin Park, a new 5-acre public park designed by SCAPE that opened in April 2024, and four new buildings. In addition to Verde, phase one’s buildings include The Canyon, a residential building designed by MVRDV that opened in June 2023, the new home of Visa’s Market Support Center designed by Henning Larsen that opened in June 2024, and a new commercial building designed by WorkAC.

On the project team:
Owner and/or developer: Mission Rock Partners
Design architect: Studio Gang
Architect of record: Studio Gang
Mechanical Engineer: Critchfield Mechanical Inc.
Electrical Engineer: PAE
Plumbing Engineer: SJE Engineers
Structural engineer: Magnusson Klemencic Associates
General contractor: Webcor Builders

Studio Gang completes Verde tower in San Francisco, photo copyright Jason O'Rear, courtesy Studio Gang
Photo copyright Jason O'Rear, courtesy Studio Gang 
Studio Gang completes Verde tower in San Francisco, photo copyright Jason O'Rear, courtesy Studio Gang
Photo copyright Jason O'Rear, courtesy Studio Gang 
Studio Gang completes Verde tower in San Francisco, photo copyright Jason O'Rear, courtesy Studio Gang
Photo copyright Jason O'Rear, courtesy Studio Gang 
Studio Gang completes Verde tower in San Francisco, courtesy Studio Gang
Courtesy Studio Gang 
Studio Gang completes Verde tower in San Francisco, courtesy Studio Gang
Courtesy Studio Gang 

 

Related Stories

Affordable Housing | Oct 4, 2024

3 new affordable housing projects for October 2024

As affordable housing continues to grow, more projects are looking to diversify their footprint by adding mixed-use components, community areas, and more.

Mixed-Use | Sep 19, 2024

A Toronto development will transform a 32-acre shopping center site into a mixed-use urban neighborhood

Toronto developers Mattamy Homes and QuadReal Property Group have launched The Clove, the first phase in the Cloverdale, a $6 billion multi-tower development. The project will transform Cloverdale Mall, a 32-acre shopping center in Toronto, into a mixed-use urban neighborhood.

Mixed-Use | Sep 10, 2024

Centennial Yards, a $5 billion mixed-use development in downtown Atlanta, tops out its first residential tower

Centennial Yards Company has topped out The Mitchell, the first residential tower of Centennial Yards, a $5 billion mixed-use development in downtown Atlanta. Construction of the apartment building is expected to be complete by the middle of next year, with first move-ins slated for summer 2025.

Codes and Standards | Sep 3, 2024

Atlanta aims to crack down on blighted properties with new tax

A new Atlanta law is intended to crack down on absentee landlords including commercial property owners and clean up neglected properties. The “Blight Tax” allows city officials to put levies on blighted property owners up to 25 times higher than current millage rates.

Building Technology | Aug 23, 2024

Top-down construction: Streamlining the building process | BD+C

Learn why top-down construction is becoming popular again for urban projects and how it can benefit your construction process in this comprehensive blog.

Mixed-Use | Aug 21, 2024

Adaptive reuse of a Sears store becomes luxury mixed-use housing

6 Corners Lofts at 4714 W Irving Park Road, Chicago, Ill., opened in March of 2024 as a 394,000-sf adaptive reuse project born out of a former Sears store.

Curtain Wall | Aug 15, 2024

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

Adaptive Reuse | Aug 14, 2024

Adaptive reuse revives a former warehouse in St. Louis

The Victor, as the building is now called, has nearly 400 residential apartments.

Adaptive Reuse | Aug 14, 2024

KPF unveils design for repositioning of Norman Foster’s 8 Canada Square tower in London

8 Canada Square, a Norman Foster-designed office building that’s currently the global headquarters of HSBC Holdings, will have large sections of its façade removed to create landscaped terraces. The project, designed by KPF, will be the world’s largest transformation of an office tower into a sustainable mixed-use building.

Products and Materials | Jul 31, 2024

Top building products for July 2024

BD+C Editors break down July's top 15 building products, from Façades by Design to Schweiss Doors's Strap Latch bifold door.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021