flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

New mixed-use tower by Studio Gang completes first phase of San Francisco waterfront redevelopment

Mixed-Use

New mixed-use tower by Studio Gang completes first phase of San Francisco waterfront redevelopment

The 23-story building provides 254 new residential units, along with ground-floor retail.


By Peter Fabris, Contributing Editor | October 7, 2024
Studio Gang completes Verde tower in San Francisco, photo copyright Jason O'Rear, courtesy Studio Gang
Photo copyright Jason O'Rear, courtesy Studio Gang

Construction was recently completed on Verde, a new mixed-use tower along the San Francisco waterfront, marking the end of the first phase of the Mission Rock development. Verde is the fourth and final building of phase one of the 28-acre project that will be constructed in several phases guided by design principles developed by a design cohort led by Studio Gang.

Verde, intended to be Mission Rock’s central social hub, takes its name from distinctive, green-colored glazed ceramic cladding that allows for variations in color and depth at multiple scales. The 23-story building provides 254 new residential units—59 of which are designated for middle-income households at below-market rents.

The building features a ground-level café, shops, and micro-activations that include a water bottle refill station and a living wall. Resident amenities include a fitness center, lounges, a game room, a golf simulator, and a shared outdoor dining space equipped with a barbecue and firepit. A sky deck on the tower’s roof provides another space for residents to take in views of Oracle Park, San Francisco Bay, and the city’s skyline.

“We wanted to create spaces where residents could connect with each other while feeling embraced by the natural beauty of San Francisco,” said Studio Gang’s founding partner Jeanne Gang. “The tower’s floorplates are carved back at the corners to create outdoor terraces that are unique across each floor. These terraces are oriented to maximize sunlight and protect from the wind while providing residents views of the city and San Francisco Bay. From the street, the alternating carved terraces give the building a rhythmic play of light.”

Studio Gang completes Verde tower in San Francisco, photo copyright Jason O'Rear, courtesy Studio Gang
Photo copyright Jason O'Rear, courtesy Studio Gang 

Located near major public transit nodes, the site offers access to the waterfront Bay Trail and over 250 bicycle parking spaces to encourage alternative and active modes of transportation. The development is elevated five feet above sea level to ensure protection against future sea level rise and storm surges. The building reuses and recycles greywater for irrigation and non-potable needs, as well as sources hot and cold water from a District Energy Plant. Planted with regionally appropriate flora, the sky deck attracts birds, butterflies, and other pollinators to enhance urban biodiversity. The building is targeting LEED Gold certification.

Verde is part of Mission Rock redevelopment led by Mission Rock Partners, a public-private partnership between Tishman Speyer, the San Francisco Giants, and the Port of San Francisco. The new neighborhood offers unprecedented public access to San Francisco Bay and introduces more than 500 new homes and 600,000 sf of retail and office space to San Francisco’s Central Waterfront.

The first phase of Mission Rock features China Basin Park, a new 5-acre public park designed by SCAPE that opened in April 2024, and four new buildings. In addition to Verde, phase one’s buildings include The Canyon, a residential building designed by MVRDV that opened in June 2023, the new home of Visa’s Market Support Center designed by Henning Larsen that opened in June 2024, and a new commercial building designed by WorkAC.

On the project team:
Owner and/or developer: Mission Rock Partners
Design architect: Studio Gang
Architect of record: Studio Gang
Mechanical Engineer: Critchfield Mechanical Inc.
Electrical Engineer: PAE
Plumbing Engineer: SJE Engineers
Structural engineer: Magnusson Klemencic Associates
General contractor: Webcor Builders

Studio Gang completes Verde tower in San Francisco, photo copyright Jason O'Rear, courtesy Studio Gang
Photo copyright Jason O'Rear, courtesy Studio Gang 
Studio Gang completes Verde tower in San Francisco, photo copyright Jason O'Rear, courtesy Studio Gang
Photo copyright Jason O'Rear, courtesy Studio Gang 
Studio Gang completes Verde tower in San Francisco, photo copyright Jason O'Rear, courtesy Studio Gang
Photo copyright Jason O'Rear, courtesy Studio Gang 
Studio Gang completes Verde tower in San Francisco, courtesy Studio Gang
Courtesy Studio Gang 
Studio Gang completes Verde tower in San Francisco, courtesy Studio Gang
Courtesy Studio Gang 

 

Related Stories

Contractors | Sep 25, 2023

Balfour Beatty expands its operations in Tampa Bay, Fla.

Balfour Beatty is expanding its leading construction operations into the Tampa Bay area offering specialized and expert services to deliver premier projects along Florida’s Gulf Coast.

Mixed-Use | Sep 20, 2023

Tampa Bay Rays, Hines finalize deal for a stadium-anchored multiuse district in St. Petersburg, Fla.

The Tampa Bay Rays Major League Baseball team announced that it has reached an agreement with St. Petersburg and Pinellas County on a $6.5 billion, 86-acre mixed-use development that will include a new 30,000-seat ballpark and an array of office, housing, hotel, retail, and restaurant space totaling 8 million sf.

Adaptive Reuse | Sep 19, 2023

Transforming shopping malls into 21st century neighborhoods

As we reimagine the antiquated shopping mall, Marc Asnis, AICP, Associate, Perkins&Will, details four first steps to consider.

Resort Design | Sep 18, 2023

Luxury resort provides new housing community for its employees

The Wisteria community will feature a slew of exclusive amenities, including a market, pub, and fitness center, in addition to 33 new patio homes.

Adaptive Reuse | Aug 31, 2023

Small town takes over big box

GBBN associate Claire Shafer, AIA, breaks down the firm's recreational adaptive reuse project for a small Indiana town.

Giants 400 | Aug 22, 2023

Top 115 Architecture Engineering Firms for 2023

Stantec, HDR, Page, HOK, and Arcadis North America top the rankings of the nation's largest architecture engineering (AE) firms for nonresidential building and multifamily housing work, as reported in Building Design+Construction's 2023 Giants 400 Report.

Giants 400 | Aug 22, 2023

2023 Giants 400 Report: Ranking the nation's largest architecture, engineering, and construction firms

A record 552 AEC firms submitted data for BD+C's 2023 Giants 400 Report. The final report includes 137 rankings across 25 building sectors and specialty categories.

Giants 400 | Aug 22, 2023

Top 175 Architecture Firms for 2023

Gensler, HKS, Perkins&Will, Corgan, and Perkins Eastman top the rankings of the nation's largest architecture firms for nonresidential building and multifamily housing work, as reported in Building Design+Construction's 2023 Giants 400 Report.

Adaptive Reuse | Aug 17, 2023

How to design for adaptive reuse: Don’t reinvent the wheel

Gresham Smith demonstrates the opportunities of adaptive reuse, specifically reusing empty big-box retail and malls, many of which sit unused or underutilized across the country.

Sustainability | Aug 15, 2023

Carbon management platform offers free carbon emissions assessment for NYC buildings

nZero, developer of a real-time carbon accounting and management platform, is offering free carbon emissions assessments for buildings in New York City. The offer is intended to help building owners prepare for the city’s upcoming Local Law 97 reporting requirements and compliance. This law will soon assess monetary fines for buildings with emissions that are in non-compliance.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021