flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

The 100 tallest buildings ever conventionally demolished

High-rise Construction

The 100 tallest buildings ever conventionally demolished

The list comes from a recent CTBUH study.


By David Malone, Associate Editor | May 18, 2018
Tallest Demolished Buildings

Courtesy CTBUH

What goes up, must come down. And, when it comes to tall buildings, often times the reason they come down is so a taller building can rise from the rubble, at least according to a new study from the Council on Tall Buildings and Urban Habitat (CTBUH). It is the concrete jungle’s version of the circle of life.

The recently released study, entitled Tallest Demolished Buildings, examines the 100 tallest buildings in history to have been dismantled by their owners, and some of the reasons for doing so.

The Singer Building in New York City is currently the tallest building ever conventionally demolished. The building stood 187 meters and 41 stories tall and was torn down in 1968 to make room for One Liberty Plaza. The 171-meter-tall CPF Building in Singapore and the 160-meter-tall Morrison Hotel in Chicago round out the top three.

Most of the world’s 100 tallest demolished buildings were torn down in order to build even taller high-rises. The average lifespan of the 100 tallest demolished buildings is only 41 years.

However, despite the possibility of the demolition of 270 Park Avenue in New York, which would become the first building over 200 meters to ever be conventionally demolished, you shouldn’t expect to see taller and taller buildings being demolished after just 41 years anytime soon.

 

270 park Avenue in new YorkPhoto: Marshall Gerometta.

 

“There are currently more than 1,300 buildings of over 200 meters in height around the globe, and counting. Considering the tallest demolished building to date was only 187 meters tall, there’s really no precedent for tearing down 200- meter-plus towers, “said CTBUH Executive Director Antony Wood in a release. “We should perhaps thus be thinking of tall buildings as perpetual entities with lifecycles potentially exceeding 100 or 200 years, while designing them in such a way that they can be creatively adapted for potential future uses.”

The United States accounts for 53% of the world’s 100 tallest demolished buildings. More than a quarter of the 100 tallest demolished buildings were built between 1890 and 1920. High-rises built in the 1970s accounted for 24%.

 

demolished buildings

 

Top 10 tallest conventionally demolished buildings:

Singer Building, New York City, 187 m

CPF Building, Singapore, 171 m

Morrison Hotel, Chicago, 160 m

Deutsche Bank, New York City, 158 m

UIC Building, Singapore, 152 m

One Meridian Plaza, Philadelphia, 150 m

Menara Tun Razak, Kuala Lumpur, 150 m

City Investing Building, New York City, 148 m

The Ritz-Carlton, Hong Kong, 142 m

Grand Prince Hotel Akasaka, Tokyo, 141 m

Related Stories

| May 1, 2013

World’s tallest children’s hospital pushes BIM to the extreme

The Building Team for the 23-story Lurie Children’s Hospital in Chicago implements an integrated BIM/VDC workflow to execute a complex vertical program.

| Apr 19, 2013

7 hip high-rise developments on the drawing board

Adrian Smith and Gordon Gill's whimsical Dancing Dragons tower in Seoul is among the compelling high-rise projects in the works across the globe.

| Mar 29, 2013

Top industry professionals to receive awards at NASCC: The Steel Conference

On April 17, Michael F. Engestrom, Dann H. Hall, Michael A. West, Stephen A. Mahin, Wallace W. Sanders, Jr., Mark V. Holland, Steven C. Ball, Rafael Sabelli, Judy Liu and William J. Wright will be recognized by the American Institute of Steel Construction (AISC) for their exceptional contributions to the advancement of the structural steel design and construction industry.

| Mar 29, 2013

Shenzhen projects halted as Chinese officials find substandard concrete

Construction on multiple projects in Guangdong Province—including the 660-m Ping'an Finance Center—has been halted after inspectors in Shenzhen, China, have found at least 15 local plants producing concrete with unprocessed sea sand, which undermines building stabity.

| Mar 14, 2013

25 cities with the most Energy Star certified buildings

Los Angeles, Washington, D.C., and Chicago top EPA's list of the U.S. cities with the greatest number of Energy Star certified buildings in 2012.

| Feb 28, 2013

Lend Lease builds world's tallest timber apartment building

Construction giant Lend Lease recently put the finishing touches on Forté, a 10-story apartment complex in Melbourne, Australia's Victoria Harbour that was built entirely with cross laminated timber (CTL) technology.

| Feb 21, 2013

AIA College of Fellows awards 2013 Latrobe Prize for 'The City of 7 Billion'

The American Institute of Architects (AIA) College of Fellows has awarded the 2013 Latrobe Prize of $100,000 for the proposal, “The City of 7 Billion.”

| Feb 21, 2013

Holl videos discuss design features of Chengdu ' Porosity Block' project

Architect Steven Holl has released two short films describing the development of Sliced Porosity Block in Chengdu, China.

| Feb 21, 2013

Construction team chosen for world's tallest building in Jeddah, Saudi Arabia

Construction team chosen for world's tallest building in Jeddah, Saudi Arabia.

| Feb 17, 2013

Pakistan to get world's tallest tower in $45 billion deal

Newly signed mega deal will fund construction of several massive developments in Karachi, including a mixed-use tower that will dwarf the Burj Khalifa.

boombox1
boombox2
native1

More In Category




Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021