flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

11 predictions for high-rise construction in 2015

11 predictions for high-rise construction in 2015

In its annual forecast, the Council on Tall Buildings and Urban Habitat predicts that 2015 will be the "Year of the Woodscraper," and that New York’s troubled B2 modular high-rise project will get back on track.


By BD+C Staff | December 17, 2014
 Shanghai Tower is on track to be completed by the end of 2015. Rendering courte
Shanghai Tower is on track to be completed by the end of 2015. Rendering courtesy Gensler

Tall buildings always draw attention, and in 2015 they're only getting bigger and better. The Council on Tall Buildings and Urban Habitat has published a list of its top predictions for skyscrapers in the coming year, noting milestones on individual projects, like the highly anticipated Kingdom Tower, and larger industry trends, such as the use of wood in high-rise construction.

From Moscow to Kuala Lumpur, it looks as if 2015 will hold some major highlights for the tall buildings industry. Here are CTBUH's predictions:

1. New York’s B2 Will Be Back
A legal scuffle between contractor Skanska and developer Forest City Ratner stalled this project in 2014, but it will likely be back on track early in 2015.

2. 2015: Year of the “Woodscraper”?
More than one wood-heavy skyscraper is under construction as we move into the new year, and the U.S. Department of Agriculture will reveal the winner of the $2 million Tall Wood Building Competition.

3. Dubai’s Burj 2020 to Get Under Way
The long-awaited Burj 2020 looks to begin construction in 2015, with shortlisted engineering teams being interviewed in late 2014.

4. Re-imagined Pinnacle Will Be Revealed
The London Pinnacle, only partway finished due to the recession, has been taken on by PLP Architects. Their plans for the project should be unveiled by spring of 2015.

5. Jeddah’s Kingdom Tower Completes 22nd Floor
CTBUH predicts that the tower will complete its 22nd floor by May, with construction currently running at 2.5 floors per month.

6. Las Vegas’ Harmon Hotel Will Finally Come Down
After years of frustration and speculation, the deconstruction of this ill-fated hotel began in 2014, and is on track for completion in 2015.

7. Ping An Finance Center Will Top Out
Shenzhen's Ping An Finance Center should reach its ultimate height by mid-2015. 

8. Moscow’s Federation Towers Will Be Completed
If this complex is finished in 2015, its Vostok Tower will be the tallest tower in Europe. 

9. Foundation Work for Kuala Lumpur’s KL118 Completed by Q3 2015
Developer KL118 has reported that the foundation for the tower will be laid by the end of 2015's third quarter. 

10. Shanghai Tower Will Be Completed
The tower and its glassed-in skygardens are set to open their doors by the end of 2015.

11. China Will Complete 13 Supertalls
Squarely ahead of any other country in this category, if China completes its scheduled 13 supertalls, it will be responsible for 57% of the world's supertall buildings in 2015.

 

Read CTBUH's "Watch Out for These Tall Happenings in 2015" report.

Related Stories

| Sep 13, 2010

World's busiest land port also to be its greenest

A larger, more efficient, and supergreen border crossing facility is planned for the San Ysidro (Calif.) Port of Entry to better handle the more than 100,000 people who cross the U.S.-Mexico border there each day.

| Sep 13, 2010

Triple-LEED for Engineering Firm's HQ

With more than 250 LEED projects in the works, Enermodal Engineering is Canada's most prolific green building consulting firm. In 2007, with the firm outgrowing its home office in Kitchener, Ont., the decision was made go all out with a new green building. The goal: triple Platinum for New Construction, Commercial Interiors, and Existing Buildings: O&M.

| Sep 13, 2010

Stadium Scores Big with Cowboys' Fans

Jerry Jones, controversial billionaire owner of the Dallas Cowboys, wanted the team's new stadium in Arlington, Texas, to really amp up the fan experience. The organization spent $1.2 billion building a massive three-million-sf arena that seats 80,000 (with room for another 20,000) and has more than 300 private suites, some at field level-a first for an NFL stadium.

| Sep 13, 2010

'A Model for the Entire Industry'

How a university and its Building Team forged a relationship with 'the toughest building authority in the country' to bring a replacement hospital in early and under budget.

| Sep 13, 2010

Committed to the Core

How a forward-looking city government, a growth-minded university, a developer with vision, and a determined Building Team are breathing life into downtown Phoenix.

| Sep 13, 2010

Conquering a Mountain of Construction Challenges

Brutal winter weather, shortages of materials, escalating costs, occasional visits from the local bear population-all these were joys this Building Team experienced working a new resort high up in the Sierra Nevada.

| Sep 13, 2010

Data Centers Keeping Energy, Security in Check

Power consumption for data centers doubled from 2000 and 2006, and it is anticipated to double again by 2011, making these mission-critical facilities the nation's largest commercial user of electric power. With major technology companies investing heavily in new data centers, it's no wonder Building Teams see these mission-critical facilities as a golden opportunity, and why they are working hard to keep energy costs at data centers in check.

| Sep 13, 2010

3D Prototyping Goes Low-cost

Today’s less costly 3D color printers are attracting the attention of AEC firms looking to rapidly prototype designs and communicate design intent to clients. 

| Aug 11, 2010

Cubellis principals reorganize as CI design

Former principals of Cubellis Inc. have formed ci design "with a stellar group of projects in the United States and internationally," states John Larsen who, with Richard Rankin and Christopher Ladd, is leading the architecture and planning firm.

| Aug 11, 2010

Leo A Daly changes name of STH, completes acquisition

LEO A DALY  has changed the name of STH Architectural Group to the name of its parent company, Leo A Daly. STH was acquired  in February 2009 as a strategic move to accelerate growth in its core business sectors and to strengthen the firm's presence in the Florida market.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021