Building Design+Construction's Building Team Awards recognize newly built (opened or occupied January 1, 2015 or later) projects that best exemplify the collaboration between owner, architect, engineer, and contractor to produce buildings that exhibit architectural and construction excellence.
Submissions are judged based on two criteria:
- Design/engineering/construction quality and excellence (50%)
- How the Building Team (architects, engineers, contractors, CMs, subcontractors, building owners, developers, government entities, etc.) collaborated to overcome obstacles and make the project succeed (50%)
Here are the winners of this year's Building Team Awards, the 19th annual edition.
PLATINUM
Onondaga Lakeview Amphitheater. Photo: David Revette/Revette Studio.
1. Onondaga Lakeview Amphitheater
2. Fulton Center
GOLD
Chicago Public Library, Chinatown Branch. Photo: Jon Miller/Hedrich Blessing.
1. Chicago Public Library, Chinatown Branch
2. The Tower at PNC Plaza
SILVER
CHS Field. Courtesy Snow Kreilich Architects.
1. CHS Field
2. LA MTA Division 13 Bus Operations & Maintenance Facility
BRONZE
Ravenswood Family Health Center. Photo: Donald Satterlee/Saterlee Photodesign.
1. Ravenswood Family Health Center
2. 275 Wyman Street
3. New York City Police Training Academy
4. John J. Hemmingson Center, Gonzaga University
HONORABLE MENTION
UCSD Medical Center Central Plant. Photo: Kevin Turner.
1. UCSD Medical Center Central Plant
2. 3737 Chestnut
Meet the judges
2016 Building Team Awards jury members (left to right): Josh Greenfield, PE, REP, CEM, BEMP, LEED AP; Gary B. Keclik, AIA, CSI, LEED AP, Green Globes Assessor; Beau M. Sanders, PE, SE; Peter Ousley; Jason Chandler, AIA, LEED AP. Not pictured: Bill Kline, AIA, OAA, EDAC, LEED AP, CAA.
Jason Chandler, AIA, LEED AP SVP
Director of Project Management
Epstein, Chicago
Josh Greenfield, PE, REP, CEM, BEMP, LEED AP
VP, Energy Services, Group Manager
Primera Engineers, Chicago
Gary B. Keclik, AIA, CSI, LEED AP
Green Globes Assessor
Keclik Associates, Hoffman Estates, Ill.
Bill Kline, AIA, OAA, EDAC, LEED AP, CAA
VP, Healthcare Studio Leader
SmithGroupJJR, Washington, D.C.
Peter Ousley
Project Executive, Public Sector Lead
Lendlease, Chicago
Beau M. Sanders, PE, SE
Associate, Structural Engineer, Project Manager
Graef, Milwaukee, Wis.
Related Stories
Building Team Awards | Apr 9, 2015
IPD-driven fusion facility serves science and student life in Chicago
In dire need of modern science labs and a student union, North Park University built both—in the same building.
Building Team Awards | Apr 9, 2015
‘Prudent, not opulent’ sets the tone for this Catholic hospital
This Building Team stuck with a project for seven years to get a new hospital built for a faithful client.
Building Team Awards | Apr 9, 2015
9/11 museum triumphs over controversy
The Building Team for this highly visible project had much more than design, engineering, and construction problems to deal with.
Building Team Awards | Apr 7, 2015
Unique test facility will help make wind power more feasible
A new facility at Clemson University makes it possible to test the huge stresses that large-scale wind turbines must be able to withstand.
Building Team Awards | Apr 5, 2015
UK's leading foot and mouth disease lab turns containment design inside out
A daring Building Team breaks the bunker mentality common to research containment with this light-filled, open facility in the English countryside.
Building Team Awards | Apr 5, 2015
‘Project first’ philosophy shows team’s commitment to a true IPD on the San Carlos Center
Skanska and NBBJ join forces with Sutter Health on a medical center project where all three parties share the risk.