flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

12 building projects that represent the best in AEC team collaboration

Building Team Awards

12 building projects that represent the best in AEC team collaboration

A busy, light-filled Manhattan subway station and a pebble-shaped Chicago library are among the winners of the 19th annual Building Team Awards. 


By BD+C Editors | May 16, 2016
12 building projects that represent the best in AEC team collaboration

The interior of Fulton Center in Manhattan, N.Y., is constructed of architecturally exposed structural steel, glass storefronts, stainless steel panels, GFRC column covers and ceilings, granite flooring, and a decorative cable net structure in the oculus. Spiral stairs, 15 ADA-compliant elevators, and 10 escalators convey 300,000 passengers a day between nine train lines. A 350-foot tunnel connects to train lines at the World Trade Center.

 

Building Design+Construction's Building Team Awards recognize newly built (opened or occupied January 1, 2015 or later) projects that best exemplify the collaboration between owner, architect, engineer, and contractor to produce buildings that exhibit architectural and construction excellence.

Submissions are judged based on two criteria:

  1. Design/engineering/construction quality and excellence (50%)
  2. How the Building Team (architects, engineers, contractors, CMs, subcontractors, building owners, developers, government entities, etc.) collaborated to overcome obstacles and make the project succeed (50%)

Here are the winners of this year's Building Team Awards, the 19th annual edition.

 

PLATINUM

Onondaga Lakeview Amphitheater. Photo: David Revette/Revette Studio.

1. Onondaga Lakeview Amphitheater

2. Fulton Center

 

GOLD

Chicago Public Library, Chinatown Branch. Photo: Jon Miller/Hedrich Blessing.

1. Chicago Public Library, Chinatown Branch

2. The Tower at PNC Plaza

 

SILVER

CHS Field. Courtesy Snow Kreilich Architects.

1. CHS Field

2. LA MTA Division 13 Bus Operations & Maintenance Facility

 

BRONZE

Ravenswood Family Health Center. Photo: Donald Satterlee/Saterlee Photodesign.

1. Ravenswood Family Health Center

2. 275 Wyman Street

3. New York City Police Training Academy

4. John J. Hemmingson Center, Gonzaga University

 

HONORABLE MENTION

UCSD Medical Center Central Plant. Photo: Kevin Turner.

1. UCSD Medical Center Central Plant

2. 3737 Chestnut

 

Meet the judges

2016 Building Team Awards jury members (left to right): Josh Greenfield, PE, REP, CEM, BEMP, LEED AP; Gary B. Keclik, AIA, CSI, LEED AP, Green Globes Assessor; Beau M. Sanders, PE, SE; Peter Ousley; Jason Chandler, AIA, LEED AP. Not pictured: Bill Kline, AIA, OAA, EDAC, LEED AP, CAA.

 

Jason Chandler, AIA, LEED AP SVP 
Director of Project Management
Epstein, Chicago

Josh Greenfield, PE, REP, CEM, BEMP, LEED AP
VP, Energy Services, Group Manager
Primera Engineers, Chicago

Gary B. Keclik, AIA, CSI, LEED AP 
Green Globes Assessor
Keclik Associates, Hoffman Estates, Ill.

Bill Kline, AIA, OAA, EDAC, LEED AP, CAA
VP, Healthcare Studio Leader 
SmithGroupJJR, Washington, D.C.

Peter Ousley
Project Executive, Public Sector Lead 
Lendlease, Chicago

Beau M. Sanders, PE, SE
Associate, Structural Engineer, Project Manager
Graef, Milwaukee, Wis.

Related Stories

Building Team Awards | Jun 14, 2017

17 projects earn BD+C's 2017 Building Team Awards

Of the 17 projects, one received a Platinum Award, six received Gold Awards, six received Silver Awards, two received Bronze Awards, and two received Honorable Mentions.

Building Team Awards | Jun 14, 2017

3D-printed office: Office of the Future

Dubai kicks off 3D-printing tech initiative with a novel office project.

Building Team Awards | Jun 14, 2017

A space for all: Lighthouse for the Blind and Visually Impaired

Nonprofit HQ fitout improves functionality, accessibility for blind and low-vision individuals.

Building Team Awards | Jun 13, 2017

Government campus reimagined: Intelligence Community Campus

Building Team converts 1940s campus into a sleek, modern home for U.S. intelligence agencies.

Building Team Awards | Jun 13, 2017

Secluded sanctuary: Alnoba leadership training center

Leadership training center becomes New England’s first Passive House building.

Building Team Awards | Jun 12, 2017

Circles and squares: Faena Arts Center

Silver Award: The Faena Arts Center’s forum is divided into two volumes, one a cylinder, the other a cube.

Building Team Awards | Jun 12, 2017

The right prescription: University of North Dakota School of Medicine & Health Sciences

Silver Award: North Dakota builds a new medical/health sciences school to train and retain more physicians.

Building Team Awards | Jun 12, 2017

Texas technopark: TechnipFMC John T. Gremp Campus

Silver Award: TechnipFMC’s new campus marks the start of a massive planned community in north Houston.

Building Team Awards | Jun 8, 2017

Quick turnaround: Partners HealthCare

Silver Award: A 2½-year project brings Partners HealthCare’s sprawling administrative functions under one roof.

Building Team Awards | Jun 8, 2017

Raising the bar: Zurich North American Headquarters

Silver Award: Forgoing a typical center-core design, the Zurich North America Headquarters rises 11 stories across three stacked bars.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021