Platinum Award Winners
Palo Alto Medical Foundation San Carlos Center, San Carlos, Calif.
Skanska and NBBJ join forces with Sutter Health on a medical center project where all three parties share the risk. Read more.
BBSRC National Virology Centre - The Plowright Building, Surrey, England
A daring Building Team breaks the bunker mentality common to research containment with this light-filled, open facility in the English countryside. Read more.
Gold Award Winners
Image: Ryan Manchester, Clear Sky Images
Clemson University SCE&G Energy Innovation Center, North Charleston, S.C.
A new facility makes it possible to test the huge stresses that large-scale wind turbines must be able to withstand. Read more.
Image: Alan Karchmer/Alan Karchmer Architectural Photographer
Holy Cross Germantown Hospital, Germantown, Md.
This Building Team stuck with a project for seven years to get a new hospital built for a faithful client. Read more.
Image: James Ewing Photography/Courtesy Davis Brody Bond
National September 11 Memorial Museum, New York, N.Y.
The Building Team for this highly visible project had much more than design, engineering, and construction problems to deal with. Read more.
North Park University Johnson Center for Science and Community Life, Chicago, Ill.
In dire need of modern science labs and a student union, North Park University built both - in the same building. Read more.
Image: Andrew Pogue/Andrew Pogue Photography
New Parkland Hospital, Dallas, Texas
Dallas's new $1.27 billion public hospital preserves an important civic anchor, Texas-style. Read more.
Silver Award Winners
Image: Bill Timmerman/Timmerman Photography, Inc.
Mariposa Land Port of Entry, Nogales, Ariz.
Whenever you eat a tomato from Mexico, there's a one-in-three chance it came through this LEED Gold gateway. Read more.
Image: Chris Cooper/Chris Cooper Photography
Mother Clara Hale Bus Depot, New York, N.Y.
A bus garage in Harlem shows that even the most mundane of facilities can strut its environmentally sensitive stuff. Read more.
Bronze Award Winners
Image: Courtesy Skanska USA Building
Radford University Fitness and Wellness Center, Radford, Va.
A sloped running track and open-concept design put this Building Team to the test. Read more.
Image: Jeff Goldberg/Esto Phoographics Inc.
Moss Arts Center, Blacksburg, Va.
The STV-led Building Team creates a world-class performance and arts venue with learning and entrepreneurial dimensions. Read more.
Image: Jeffrey Totaro/Jeffrey Totaro Architectural Photographer
PinnacleHealth, West Shore Hospital, Mechanicsburg, Pa.
PinnacleHealth needed a new hospital STAT! This team delivered it in two years, start to finish. Read more.
Honorable Mentions
Anaheim Regional Transportation Intermodal Center, Anaheim, Calif.
The Building Team for this project installed an ETFE system to avoid budget-busting soil conditions. Read more.
Saint Joseph Hospital, Denver, Colo.
This Building Team used prefabrication to finish a 360-bed Denver hospital in 30 months. Read more.
Related Stories
Building Team Awards | May 31, 2016
Gonzaga's new student center is a bustling social hub
Retail mall features, comfortable furniture, and floor-to-ceiling glass add vibrancy to the new John J. Hemmingson Center.
Building Team Awards | May 27, 2016
Big police academy trains thousands of New York's finest
The Police Training Academy in Queens, N.Y., consists of a 480,000-sf academic/administration building and a 240,000-sf physical training facility, linked by an aerial pedestrian bridge.
Building Team Awards | May 26, 2016
Cimpress office complex built during historically brutal Massachusetts winter
Lean construction techniques were used to build 275 Wyman Street during a winter that brought more than 100 inches of snow to suburban Boston.
Building Team Awards | May 25, 2016
New health center campus provides affordable care for thousands of Northern Californians
The 38,000-sf, two-level John & Susan Sobrato Campus in Palo Alto is expected to serve 25,000 patients a year by the end of the decade.
Building Team Awards | May 24, 2016
Los Angeles bus depot squeezes the most from a tight site
The Building Team for the MTA Division 13 Bus Operations and Maintenance Facility fit 12 acres’ worth of programming in a multi-level structure on a 4.8-acre site.
Building Team Awards | May 23, 2016
'Greenest ballpark' proves a winner for St. Paul Saints
Solar arrays, a public art courtyard, and a picnic-friendly “park within a park" make the 7,210-seat CHS Field the first ballpark to meet Minnesota sustainable building standards.
Building Team Awards | May 20, 2016
Pittsburgh's Tower at PNC Plaza raises the bar on high-rise greenness
The Building Team designed the 800,000-sf tower to use 50% less energy than a comparable building. A 1,200-sf mockup allowed the team to test for efficiency, functionality, and potential impact on the building’s occupants.
Building Team Awards | May 19, 2016
Chinatown library unites and serves two emerging Chicago neighborhoods
The 16,000-sf, pebble-shaped Chinatown Branch Library was built at the intersection of new and old Chinatown neighborhoods. The goal is for the building to unite the communities and serve as a catalyst for the developing area.
Building Team Awards | May 19, 2016
NYC subway station lights the way for 300,000 riders a day
Fulton Center, which handles 85% of the riders coming to Lower Manhattan, is like no other station in the city’s vast underground transit web—and that’s a good thing.
Building Team Awards | May 16, 2016
Upstate New York performing arts center revives once-toxic lakefront site
Early coordination, prefabrication, and judicious value engineering contributed to the accelerated completion of the Onondaga Lakeview Ampitheater, a Upstate New York design-build project.