flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

14 projects that push AEC teaming to the limits

Building Team Awards

14 projects that push AEC teaming to the limits

From Lean construction to tri-party IPD to advanced BIM/VDC coordination, these 14 Building Teams demonstrate the power of collaboration in delivering award-winning buildings. These are the 2015 Building Team Award winners.


By BD+C Staff | April 10, 2015
14 projects that push AEC teaming to the limits

The National September 11 Memorial Museum incorporates evocative artifacts of the destroyed Twin Towers, including the "Last Column" (pictured). It was honored with a Gold Award in BD+C's 2015 Building Team Awards. Photo: Jin Lee / courtesy 9/11 Memorial Museum

This article first appeared in the April 2015 issue of BD+C.

 

Platinum Award Winners

Image: Bruce Damonte

Palo Alto Medical Foundation San Carlos Center, San Carlos, Calif.

Skanska and NBBJ join forces with Sutter Health on a medical center project where all three parties share the risk. Read more.

 

 

Image: James Brittain

BBSRC National Virology Centre - The Plowright Building, Surrey, England

A daring Building Team breaks the bunker mentality common to research containment with this light-filled, open facility in the English countryside. Read more.

 

 

Gold Award Winners

Image: Ryan Manchester, Clear Sky Images

Clemson University SCE&G Energy Innovation Center, North Charleston, S.C.

A new facility makes it possible to test the huge stresses that large-scale wind turbines must be able to withstand. Read more.

 

 

Image: Alan Karchmer/Alan Karchmer Architectural Photographer

Holy Cross Germantown Hospital, Germantown, Md.

This Building Team stuck with a project for seven years to get a new hospital built for a faithful client. Read more.

 

 

Image: James Ewing Photography/Courtesy Davis Brody Bond

National September 11 Memorial Museum, New York, N.Y.
The Building Team for this highly visible project had much more than design, engineering, and construction problems to deal with. Read more.

 

 

Image: Mark Ballogg

North Park University Johnson Center for Science and Community Life, Chicago, Ill.

In dire need of modern science labs and a student union, North Park University built both - in the same building. Read more.

 

 

Image: Andrew Pogue/Andrew Pogue Photography

New Parkland Hospital, Dallas, Texas

Dallas's new $1.27 billion public hospital preserves an important civic anchor, Texas-style. Read more.

 

 

Silver Award Winners

Image: Bill Timmerman/Timmerman Photography, Inc.

Mariposa Land Port of Entry, Nogales, Ariz.

Whenever you eat a tomato from Mexico, there's a one-in-three chance it came through this LEED Gold gateway. Read more.

 

 

Image: Chris Cooper/Chris Cooper Photography

Mother Clara Hale Bus Depot, New York, N.Y.

A bus garage in Harlem shows that even the most mundane of facilities can strut its environmentally sensitive stuff. Read more.

 

 

Bronze Award Winners

Image: Courtesy Skanska USA Building

Radford University Fitness and Wellness Center, Radford, Va.

A sloped running track and open-concept design put this Building Team to the test. Read more.

 

 

Image: Jeff Goldberg/Esto Phoographics Inc.

Moss Arts Center, Blacksburg, Va.

The STV-led Building Team creates a world-class performance and arts venue with learning and entrepreneurial dimensions. Read more.

 

 

Image: Jeffrey Totaro/Jeffrey Totaro Architectural Photographer

PinnacleHealth, West Shore Hospital, Mechanicsburg, Pa.

PinnacleHealth needed a new hospital STAT! This team delivered it in two years, start to finish. Read more.

 

 

Honorable Mentions

Image: John Linden

Anaheim Regional Transportation Intermodal Center, Anaheim, Calif.

The Building Team for this project installed an ETFE system to avoid budget-busting soil conditions. Read more.

 

 

Image: Ross Cooperthwaite

Saint Joseph Hospital, Denver, Colo.

This Building Team used prefabrication to finish a 360-bed Denver hospital in 30 months. Read more.

Related Stories

MFPRO+ New Projects | Oct 30, 2024

BIG’s One High Line finally reaches completion in New York City’s West Chelsea neighborhood

One High Line, a luxury residential project spanning a full city block in New York’s West Chelsea neighborhood, reached completion this summer following years of delays related to investor lawsuits. 

Urban Planning | Oct 30, 2024

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.

MFPRO+ New Projects | Oct 30, 2024

Luxury waterfront tower in Brooklyn features East River and Manhattan skyline views

Leasing recently began for The Dupont, a 41-story luxury rental property along the Brooklyn, N.Y., waterfront. Located within the 22-acre Greenpoint Landing, where it overlooks the newly constructed Newtown Barge Park, the high-rise features East River and Manhattan skyline views along with 20,000 sf of indoor and outdoor communal space.

Libraries | Oct 30, 2024

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

Resiliency | Oct 29, 2024

Climate change degrades buildings slowly but steadily

While natural disasters such as hurricanes and wildfires can destroy buildings in minutes, other factors exacerbated by climate change degrade buildings more slowly but still cause costly damage.

Office Buildings | Oct 29, 2024

Editorial call for Office Building project case studies

BD+C editors are looking to feature a roundup of office building projects for 2024, including office-to-residential conversions. Deadline for submission: December 6, 2024.

Healthcare Facilities | Oct 28, 2024

New surgical tower is largest addition to UNC Health campus in Chapel Hill

Construction on UNC Health’s North Carolina Surgical Hospital, the largest addition to the Chapel Hill campus since it was built in 1952, was recently completed. The seven-story, 375,000-sf structure houses 26 operating rooms, four of which are hybrid size to accommodate additional equipment and technology for newly developed procedures. 

Multifamily Housing | Oct 28, 2024

A case for mid-rise: How multifamily housing can reshape our cities

Often referred to as “five-over-ones,” the mid-rise apartment type is typically comprised of five stories of apartments on top of a concrete “podium” of ground-floor retail. The main criticism of the “five-over-one” is that they are often too predictable.

Sports and Recreational Facilities | Oct 24, 2024

Stadium renovation plans unveiled for Boston’s National Women’s Soccer League

A city-owned 75-year-old stadium in Boston’s historic Franklin Park will be renovated for a new National Women’s Soccer League team. The park, designed by Fredrick Law Olmsted in the 1880s, is the home of White Stadium, which was built in 1949 and has since fallen into disrepair.

Laboratories | Oct 23, 2024

From sterile to stimulating: The rise of community-centric life sciences campuses

To distinguish their life sciences campuses, developers are partnering with architectural and design firms to reimagine life sciences facilities as vibrant, welcoming destinations. By emphasizing four key elements—wellness, collaboration, biophilic design, and community integration—they are setting their properties apart. 

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021